ST9902-CS090812 (2)Page 1 of 1
Keith Marvin - RE: Sandy Lake CSJ 0918 -45 -773
From: "Matt Atkins" <matkins @tnp- online.com>
To: "Madeline Percin" <made line @civilassociates.com>
Date: 8/12/2009 3:31 PM
Subject: RE: Sandy Lake CSJ 0918 -45 -773
CC: "Alma Canning" <alma @civilassociates.com >, "Keith Marvin" <kmarvin @ci.coppell.tx.us>
Attachments: 04 -typ- sect - phases.pdf
Madeline,
We do not have one currently drawn up for that bridge as TxDOT did not require it on the Schematic plans. We do
have something that resembles the existing bridge on the attached sheet. Will this work for you?
Matt Atkins, P.E.
Project Manager
12160 North Abrams Road, Suite 508
Dallas, Texas 75243
214.461.9867 office
214.461.9864 fax
matkinsC@_tnp-online.com
www.tnr)- online.com
From: Madeline Percin [mai Ito: madeli ne@civilassociates.com]
Sent: Wednesday, August 12, 2009 1:28 PM
To: Matt Atkins
Cc: Alma Canning
Subject: Sandy Lake CSJ 0918 -45 -773
Mr. Atkins,
We are currently working on the CE for the Sandy Lake widening project. We recently noticed that we do not have
the existing bridge typical that crosses Cottonwood Branch. Is it possible that we could get that typical from you of
someone in your office? Thank you for your time.
Madeline Percin
Environmental Scientist
Civil Associates, Inc.
1521 Northwest Highway
Garland, TX 75041
Phone: 21 4 - 7 0 3 - 5 1 5'X 2 59
Email: madeline (&civilassociates.com
size =2 width =" 100%" noshade color= " #d2d3d2" align = center>
This e -mail and any attachments are confidential and may contain legally privileged information. If you are
not the intended recipient, you should not copy, distribute, disclose or use the information it contains, please
e -mail the sender immediately and delete this message from your system. Note: e -mails are susceptible to
corruption, interception and unauthorized amendment; we do not accept liability for any such changes, or for
their consequences. You should be aware that we may monitor your e -mails and their content.
file: HC: \Documents and Settings \radloo \Local Setting s\ Temp \XPgrpwise \4A82E03FCity_... 3/15/2010
29'-6"
CST
SANDY LIKE RO
F nl
ru
EXISTING BRIDGE
PHASE II CONSTRUCTION
2%
T YPE
G
S 0
8' -1" 1 8'-l" 1 8-1 I e' 1" I 3'-0"
COMPLETED CROSS SECTION
PHASE I CONSTRUCTION
4' 0 4' 8'
2•_ 6.
COPPELL
A k q s 1
sen2E
AS SHOWN
TEAGUE NALL AND �ER /NS
12160 Abrams Road, Suite boa
NC, v a 11 a s, r e x a s 6 z a s
Ph Ona: (214)481- 888]�Fa x:(214) 461 -8884
TBPE Neeishadar Na F -288 www. fn P-Onfl_ 00,
mrs I......1 �, m1e,�m ,e ore �� X01
p es d 9 � �
P E oo'e.
ix Reg, k 3164Q
CITY OF COPPELL, TEXAS
"° "°°°`"
Wg9T SANDY LAKE ROAD IMPROVEMENTS WOOD
COTTONWOOD CREEK BRIDGE
SHEET
SO4
Y
NRA
LATE
MAR 2009
TYPICAL BRIDGE CROSS SECTION
BY CONSTRUCTION PHASE
NO,
REVUIOIV
BY
DATE
2•_ 6.