Loading...
ST9902-CS090812 (2)Page 1 of 1 Keith Marvin - RE: Sandy Lake CSJ 0918 -45 -773 From: "Matt Atkins" <matkins @tnp- online.com> To: "Madeline Percin" <made line @civilassociates.com> Date: 8/12/2009 3:31 PM Subject: RE: Sandy Lake CSJ 0918 -45 -773 CC: "Alma Canning" <alma @civilassociates.com >, "Keith Marvin" <kmarvin @ci.coppell.tx.us> Attachments: 04 -typ- sect - phases.pdf Madeline, We do not have one currently drawn up for that bridge as TxDOT did not require it on the Schematic plans. We do have something that resembles the existing bridge on the attached sheet. Will this work for you? Matt Atkins, P.E. Project Manager 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 office 214.461.9864 fax matkinsC@_tnp-online.com www.tnr)- online.com From: Madeline Percin [mai Ito: madeli ne@civilassociates.com] Sent: Wednesday, August 12, 2009 1:28 PM To: Matt Atkins Cc: Alma Canning Subject: Sandy Lake CSJ 0918 -45 -773 Mr. Atkins, We are currently working on the CE for the Sandy Lake widening project. We recently noticed that we do not have the existing bridge typical that crosses Cottonwood Branch. Is it possible that we could get that typical from you of someone in your office? Thank you for your time. Madeline Percin Environmental Scientist Civil Associates, Inc. 1521 Northwest Highway Garland, TX 75041 Phone: 21 4 - 7 0 3 - 5 1 5'X 2 59 Email: madeline (&civilassociates.com size =2 width =" 100%" noshade color= " #d2d3d2" align = center> This e -mail and any attachments are confidential and may contain legally privileged information. If you are not the intended recipient, you should not copy, distribute, disclose or use the information it contains, please e -mail the sender immediately and delete this message from your system. Note: e -mails are susceptible to corruption, interception and unauthorized amendment; we do not accept liability for any such changes, or for their consequences. You should be aware that we may monitor your e -mails and their content. file: HC: \Documents and Settings \radloo \Local Setting s\ Temp \XPgrpwise \4A82E03FCity_... 3/15/2010 29'-6" CST SANDY LIKE RO F nl ru EXISTING BRIDGE PHASE II CONSTRUCTION 2% T YPE G S 0 8' -1" 1 8'-l" 1 8-1 I e' 1" I 3'-0" COMPLETED CROSS SECTION PHASE I CONSTRUCTION 4' 0 4' 8' 2•_ 6. COPPELL A k q s 1 sen2E AS SHOWN TEAGUE NALL AND �ER /NS 12160 Abrams Road, Suite boa NC, v a 11 a s, r e x a s 6 z a s Ph Ona: (214)481- 888]�Fa x:(214) 461 -8884 TBPE Neeishadar Na F -288 www. fn P-Onfl_ 00, mrs I......1 �, m1e,�m ,e ore �� X01 p es d 9 � � P E oo'e. ix Reg, k 3164Q CITY OF COPPELL, TEXAS "° "°°°`" Wg9T SANDY LAKE ROAD IMPROVEMENTS WOOD COTTONWOOD CREEK BRIDGE SHEET SO4 Y NRA LATE MAR 2009 TYPICAL BRIDGE CROSS SECTION BY CONSTRUCTION PHASE NO, REVUIOIV BY DATE 2•_ 6.