Klaasmeyer06/26/2009 13:35 FAX 2142220215 KLAASMEYER CONSTRUCTION Z003
C���T'rt\Y�9 �yo1� �Ol�'lVi1VY. i1�6_
592 E. Highway 121
Lewisville, TX J 5057
Phone 214-222-)204 Fax 214122.0215
Descfiption:
Wire Cener: N/A
Attn: Keith Mar Fin
Approved:
Date:
Quote",
Exchange: N/A
DATE_ $125/09
City Of Coppell
E Parkway Blvd Fiber Rui
Labor prices AMOUNT
This quote is fc r labor and nu terials to place approxi rtately 2675 LF. of $ 34,000.00
2" duct with av ociated hand Dotes and rnate+iats_ This also includes the
placemern: of 1 aver conduit in the Coppell Aquatic Center.
If you have any c uestions please donl hesitate to give us a cair_
TOTAL $ 34,000.00
06/26/2009 13:35 FAX 2142220215 KLAASHEYER CONSTRUCTION 0 001
- 77 -
- 121'
TRUCTJOM M POPAW, al4c-
COME TRUCTJON COMPAM, IN tiewisvilk, TX7$057n,*�'�
"W2 Am, on
0• A� 1 4 , tq r l;,,
Fax: 77Z 3 -3srzt,
ram: 4 A
d a te:
Re; Q
�Pages:
C:
❑ Urgent kFor Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle
• A
4
J",
06/26/2009 13:35 FAX 2142220215 KLAASMEYER CONSTRUCTION U002
T H E - C I T Y O F
COPPELL
0
.tune 11, 2009
Guy Varney
K1aas neyer
:592 E IIwy. 121
Lewisville, TX 75057
RE: City of Coppell Underground Conduit Installation
]Dear 1 ✓ n Varney:
'f he C ity of Coppell is soliciting cost proposals for installation of underground conduit
tonne ,-zing some of our facilities. Please see the attached drawing; and narrative. This is
1.he first leg of a project that will ultimately connect all city facilities and traffic signals.
'We ai a sending this to your -rm due to your work history within our city. Should you
have ; uny questions, please reel free to contact me. If you are interested in performing
This A ork, please return a cost proposal to my attention. Please return your proposal no
later t ian June 26, 2009 for consideration.
Since) ely,
Keith R. Marvin, P.E.
Project Engineer
Offic(: 972- 304 -3681
Fax: S72-304-3570
J cman ip(r),ci.copNfl.tx.us
255 PA IKWAY * P.0.60X COPPELL TX 73019 * YCL 97.2/462 0022 * FAX 972/304 3673