Loading...
Red Hawk-CS10031203-17 -1 0 A10: 14 RCVD KADLECK & ASSOCIATES ENGINEERING PLANNING SURVEYING 555 REPUBLIC DRIVE, SUITE 115 PLANO, TEXAS 75074 972 -881- 0771/972- 509- 1861(FAX) TSPE FIRM NO. F- 6420/TBPLS REG. NO. 100555 -00 March 12, 2010 Engineering Department 255 Parkway Blvd. Coppell, Texas 75019 Re: Red Hawk, NW Corner Denton Tap and Bethel School Roads, Coppell, Texas Attn: Mr. Michael Garza Attached are two copies of the civil plans for this project revised per your markup plans and comment letter. I am also returning the markup set of plans. The following address the comments, markups and revisions made: Cover — Sheet 1 I . Revise Sheet Index for added sheet. Grading Plan — Sheet 4 1. Add barrier free ramps at Washington Court and Devon Drive and Oxford Place and Washington Drive. 2. Correct spelling on sheet reference. Grading Plan — Sheet 5 l . Revise grades at Devon Drive and Washington Court intersection to route water to north side of Washington Court. 2. Move inlet in Washington Court to clear proposed drives. 3. Add barrier free ramp from access from southeast side to northwest side of Devon Drive at Washington Court. 4. Revise grades for Washington Court. Paving Plan — Sheet 6 1. Inlets were moved to clear proposed driveways. See additional comments below. 2. Revise grades for Washington Court and Devon Drive to allow better flow of water. Inlet could not be moved to Lot 24 & 25 due to proposed driveway conflict. 3. Add walk to cemetery for mowing access from Washington Court. Paving Plan — Sheet 7 1. Add walk from Oxford Place to proposed walk along Denton Tap Road — this provides access from single family to the commercial Lot 27. 2. Clarified Section B -B. 3. Corrected note for 6 inch parabolic crown on detail (all paving sheets). Paving Plan — Sheet 8 1. Revise grades in Devon Drive at Washington Court. 2. Relocate inlet in Devon Drive before street capacity is exceeded. 3. Revise grades and relocate sag inlet in Devon Drive at Blackburn Drive to clear proposed driveway. 4. Call out construction of fire lane pavement on Lot 27. Drainage Area Map - Sheet 10 1. Revise Drainage Area Table for revised drainage areas. 2. Revise inlet calculations for capacities and bypass. 3. Revise storm sewer calculations for inlet/line changes. Storm Sewer Plan - Sheet 11 1. Call out reference to outfall detail. 2. Add "grouted" to rip rap. 3. Add "traffic rated" to grate inlets. Storm Sewer Plan - Sheet 12 1. Add "grouted" to rip rap. 2. Call out reference to outfall detail. Water and Sanitary Sewer Plan - Sheet 13 (was 12) 1. Add Breakout, Remove and Replace concrete pavement and curb in Denton Tap Road for water connection. 2. Add note to plan and General Notes regarding Contractor to provide a traffic control plan 48 hours prior to start of work for water connection. Erosion Control Plan - Sheet 17 (was 16) 1. Move inlet protection to relocated inlets. Details - Sheet 18 (was 17) 1. Add "grouted" to rip rap detail. I trust this will allow approval of the plans. Please contact me with any questions or comments. Sincerely, 4 Lnn & Kadleck Copy: Mr. Terry Holmes