Loading...
Duke Lesley 3A-LR100301Ro n e Engineering 7701 8908 Ambassador Row, Dallas, TX 75247 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365813 Project No.: 0915747 Date of Service: 01/02/2010 Report Date: 03/01/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 6 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3%-6% Test Method: ASTM C -172 Truck No: 1118 ASTM C -31 (except 10.1.2) Diameter ASTM C -143 Unit Weight (pcf): NA ASTM C -231 Overall Placement Location: ASTM C -1064 Tested ASTM C -138 of Pour #1 ASTM C -39 Mix Design I.D.: 1621 Measured Placement Date: 01/02/2010 Slump Weather Conditions: Clear (inches) Time Sampled: 07:55am Batch time: 07:01 am 4.0 Temperature - Air: 32 °F Concrete: 48 °F Marked Truck No: 1118 Ticket No: 6364000 Diameter Air Content: 5.5% Unit Weight (pcf): NA Strength Overall Placement Location: Set No. Tested Paving, Pour #2 (142' x 165') 191' to 133' south and 0' to 165' east of northwest corner of Pour #1 (in =) (Ibs) Sample Location: 194' south. 25' east of northwest corner of Pour #1 REPORT OF TESTS LX]r\i H id Ll 11 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 " Does not comply with s ecified strength 1 I D o LIMITATIONS. The lest results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 4 Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in =) (Ibs) (psi) Type 1 1 01/09/2010 7 5.99 28.18 94,130 3,340 Type 5 1 2 01/30/2010 28 6.00 28.27 111,760 3,950 Type 2 1 3 01/30/2010 28 6.00 28.27 113,660 4,020 Type 2 Average 3,990 1 4 02/27/2010 56 6.00 28.27 127,920 4,520 Type 2 LX]r\i H id Ll 11 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 " Does not comply with s ecified strength 1 I D o LIMITATIONS. The lest results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 4 8908 Ambassador Row, Dallas, TX 75247 Ro n e Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365813 Project No.: 0915747 Date of Service: 01/02/2010 Report Date: 03/01/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 6 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3%-6% Test Method: ASTM C -172 4.5 ASTM C -31 (except 10.1.2) 44 °F ASTM C -143 (days) ASTM C -231 9127 ASTM C -1064 (psi) ASTM C -138 4.8% ASTM C -39 Mix Design I.D.: 1621 Measured Placement Date: 01/02/2010 Compressive Slump Weather Conditions: Clear Date (inches) Time Sampled: 09:00am Batch time: 08:15am 4.5 Temperature - Air: 44 °F Concrete: 55 °F (days) Truck No: 9127 Ticket No: 6364012 (psi) Air Content: 4.8% Unit Weight (pcf): NA 7 Overall Placement Location: 28.18 116,100 Paving, Pour #2 (142'x 165') 191' to 133' south and 0' to 165' east of northwest corner of Pour #1 01/30/2010 28 6.00 Sample Location: 230' south, 75' east of northwest corner of Pour #1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 01/09/2010 7 5.99 28.18 116,100 4,120 Type 2 2 2 01/30/2010 28 6.00 28.27 140,360 4,960 Type 5 2 3 01/30/2010 28 6.00 28.27 139,620 4,940 Type 5 Average 4,950 2 4 02/27/2010 56 6.00 28.27 163,110 5,770 Type 5 .dN��`���CII_I Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW) Page 2 of 4 8908 Ambassador Row, Dallas, TX 75247 Ro n e Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365813 Project No.: 0915747 Date of Service: 01/02/2010 Report Date: 03/01/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 6 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3% Test Method: ASTM C -172 4.0 ASTM C -31 (except 10.1.2) 49 °F ASTM C -143 ASTM C -231 1039 ASTM C -1064 ASTM C -138 4.6% ASTM C -39 Mix Design I.D.: 1621 Cylinder Maximum Measured Placement Date: 01/02/2010 Set No. Tested (days) (in) (in') (Ibs) Slump Weather Conditions: Clear 3,800 Type 2 (inches) Time Sampled: 10:30am Batch time: 09:16am 4.0 Temperature - Air: 49 °F Concrete: 59 °F Truck No: 1039 Ticket No: 6364017 Air Content: 4.6% Unit Weight (pcf): NA Overall Placement Location: Paving, Pour #2 (142' x 165') 191' to 133' south and 0' to 165' east of northwest corner of Pour #1 Sample Location: 270' south, 140' east of northwest corner of Pour #1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 01/09/2010 7 5.99 28.18 106,980 3,800 Type 2 3 2 01/30/2010 28 3 3 01/30/2010 28 3 4 02/27/2010 56 ,1C� In H II Type 1 Type 2 Type 3 Type 4 6.00 28.27 6.00 28.27 6.00 28.27 rail F­1 Type 5 Type 6 145,560 143,160 Average 5,150 5,060 5,110 10 Type 2 Type 2 Type 5 3 ' 171 (�o 1 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW ) Page 3 of 4 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP Report No.: 365813 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254 -2936 Date of Service: 01/02/2010 Report Date: 03/01/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Mix Design I.D.: 1621 Measured Concrete Supplier: LMC Placement Date: 01/02/2010 Slump Plant: 6 Weather Conditions: Clear (inches) Specification Requirements Time Sampled: 11:45am Batch time: 10:08am 3.75 Strength: 4,000 psi @ 28 days Temperature - Air: 50 °F Concrete: 60 °F Slump (in.): 3" - 5" Truck No: 1019 Ticket No: 6364023 Air ( %): 3%-6% Air Content: 4.8% Unit Weight (pcf): NA Test Method: ASTM C -172 Overall Placement Location: ASTM C -31 (except 10.1.2) Paving, Pour #2 (142' x 165') 191' to 133' south and 0' to 165' east of northwest corner ASTM C -143 of Pour #1 ASTM C -231 ASTM C -1064 ASTM C -138 Sample Location: ASTM C -39 315' south, 145' east of Pour #1, northwest core / REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum o ssive Marked Date Age Diameter Area Load St ngth Fracture Set No. Tested (days) (in) (in =) (lbs) ( Type 4 1 01/09/2010 7 5.99 28.18 99,060 3,520 Type 6 4 2 01/30/2010 28 6.00 28.27 139,750 4,940 Type 5 4 3 01/30/2010 28 6.00 28.27 141,410 5,000 Type 5 Average 4,970 4 4 02/27/2010 56 6.00 28.27 146,650 5,190 Type 5 HX1 I F" I 3 I vI e' a o Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Technician: Richard Bullion Started: 07:00am Finished: 01:00pm Rone Engineering Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Ms. Ashley Hair (1 -ec copy) 1 -ec Duke Construction, LP Attn: Mr. Andy (Maverick) Otten 1 -ec Rone Project Manager Attn: Mr. K. Scott Watson AET K. Scott Watson, AET 1 -ec City of Coppell Attn: Mr. Lee Stone Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW ) Page 4 of 4