WA9402-CS 970214 BID TABULATION SHEET DALLAS WATER SUPPLY LINE NO. 3 - SECTION 3A (1) BIDS RECEIVED UNTIL: 10:00 AM DATE: FEBRUARY 14, 1997 Jc Evans Const. Inc. $1,315,635.00 120 X X Johnson Bros. Corporation 1,471,370.00 140 X X Linder Stahl Const. 1,245,412.00 140 X X M-Co Construction 1,504,874.00 140 X X Mario Simacola & Sons 1,233,552.50 200? X X ,,~ SJ Louis Const. 1,149,849.00 140 X X ..~ Garney Companies 1,174,031.00 120 Not Ind. w/BID X Pate Brothers 1,277,376.04 140 X X Atkins Brothers 1,214,430.50 140 X X ~ Bar COnstructors 1,092,532.00 140 X X CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas. Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. February 18, 1997 GARY C. HENDRICKS, P.E. 1. C. FINKLEA, P.tE. Mr. David M. Mullins, P.E. Engineering Manager City of Irving Post Office Box 152288 Irving, Texas 75015-2288 Re: Dallas Water Supply Line No. 3 - Section 3A(1) Original Bid Documents and Tal!ihlation of Bids Dear Mr. Mullins: We have checked the bids received at 10:00 a.m. on February 14, 1997, for construction of Section 3A(1) of the Dallas Water Supply Line No. 3 project and are returning the original bid documents ~vith this letter. We are also handing you three copies of the itemized tabulation of bids received for the project. The low bid was submitted by BAR Constructors, Inc. of Lancaster, Texas, in the amount of $1,092,532.00 for construction of the project. BAR also bid 140 calendar days for completion of the project in accordance with the specifications. We have reviewed this contractor's experience, equipment list and financial status. The information we reviewed together with our past experience working with this contractor on similar projects leads us to believe that BAR Constructors, Inc., is qualified to successfully complete the project. Accordingly, we recommend that the City of Irving accept the bid of BAR Constructors, Inc. and award a contract in the amount of $1,092,532.00 for construction of Section 3A(1 ) of the Dallas Water Supply Line No. 3. Sincerely yours, Joe R. Carter, P.E. Enclosures cc: Mr. Jack Angel, P.E. Mr. Bob Chapman, P.E. Mr. Jim Siddall TABULATION OF BIDS n~D OF BiD OF B~D C DATE: February 14, 1997 PROJECT: CITY OF IRVING, TEXAS S]-]I]V[EK, JACOBS & FINKLEA, L.L.I~. Bar Contractors, Inc. S.J. Louis Construction, Inc. Garney Comp Dallas Water Supply Line No. 3 CONSULTING ENGINEERS P.O. Box 10 P.O. Box 202384 1331 N.W. Vi~ Section 3A(1) Dallas, Texas Lancaster, Texas 75146 Arlington, Texas 76006 Kansas City, r~ ITEM [ APPROXIMATE UNIT BID [ UNIT BID J UNIT BID NO. QUANTITIES UNIT DESCRIPTION PRICE EXTENSION PRICE EXTENSION PRICE I 1 2,230 L.F. 60" Reinf. Conc. Cylinder Pipe (E-301) Waterline by Open Cut w/Class "F" Embed. $252.00 $561,960.0G $210.00 $468,300.00 $232.00 2 1 L.S. 300' Aerial Crossing incl. 60" Reinf Conc Cylinder Pipe Waterline, Air & Vacuum Valve $426,000.00 $426,000.00 $540,000.00 $540,000.00 $450,000.00 3 140 V.F. Constructing 30" Drilled Shaft $60.00 $8,400.00 $125.00 $17,500.00 $110.00 t~ 284 V.F. Constructing 42-Inch Drilled Shaft $87.00 $24,708.00 $155.00 $44,020.00 $140.00 5 2 Ea. Constructing 10-inch Blow-offValve with Manhole and all related appurtenances $4,000.00 $8,000.00 $6,000.00 $12,000.00 $6,000.00 6 1 Ea. Construct 8" Air & Vacuum Release Valve with Manhole and all related appurtenances $6,800.00 $6,800.00 $8,300.00 $8,300.00 $8,000.00 7 1 LS. 60" RCCP Dished Head Plug designed for Testing $3,300.00 $3,300.00 $3,300.00 $3,300.00 $3,000.00 8 I L.S. Removing, Salvaging and Utilizing Existing 60-Inch Plug $900.00 $900.00 $2,350.00 $2,350.00 $2,000.00 9 195 S.Y. Removal and Replacement of Existing HMAC Drive $14.00 $2,730.00 $35.00 $6,825.00 $40.00 10 60 S.Y. Removal and Replacement of Existing Gravel Drive $4.00 $240.00 $5.00 $300.00 $8.00 11 300 L.F. Removal and Replacement of Barbed Wire Fence $1.50 $450.00 $2.00 $600.00 $2.00 12 100 L.F. Removal and Replacement of Chain Link Fence $4.00 $400.00 $10.00 $1,000.00 $7.00 13 1 Ea. Furnishing and Installing Cathodic Test Station, as detailed in Plans $450.00 $450.00 $700.00 $700.0(: $500.00 14 1 L.S. 60" Reinf. Conc. Cylinder Pipe Closure &Connect to Existing 60" RCCP Waterline $6,000.00 $6,000.00 $9,500.00i $9,500.00 $1.00 ~ ~ 9 Ea. Furnish & Plant 4" Caliper Cedar Elm, in locations to be designated by Owner $475.00 $4,275.00 $315.00 $2,835.00 $350.00 '{ 8 Ea. Furnish & Plac 4" Caliper Shumard Red Oak, in locations to be designated by Owner $510.00 $4,080.00 $315.00 $2,520.0(: $350.00 17 8 Ea. Furnish & Plac 4" Caliper Live Oak, in locations to be designated by Owner $510.00 $4,080.00 $315.00 $2,520.0C $350.00 18 50 C.Y. Extra Crushed Stone for Embedment, not called for on the Plans $18.00 $900.00 $18.00 $900.0C $20.00 19 20 C.Y. Extra 2000 PSI Concrete for Embedment, not called for on the Plans $60.00 $1,200.00 $70.00 $1,400.00 $50.00 20 2,300 L.F. Furnishing and Installing Erosion Protection Devices $1.25 $2,875.00 $1.63 $3,749.00 $1.50 21 2,230 L.F. Designing and Protecting Trench Safety Systems $0.80 $1,784.00 $1.00 $2,230.00 $1.00 22 1 L.S. All Costs Related to Mobilization for the Project, as defined in Section 02100 $23,000.00 $23,000.0C $19,000.00 $19,000.00 $100,000.00 TOTAL AMOUNT BID (Items 1 Through 22) $1,092,532.00 $1,149,849.00 Calendar Days Bid 140 140 120 TABULATION OF BIDS BID OF BID OF BID DATE: February 14, 1997 Mario Sinacola & Sons PROJECT: CITY OF IRVING, TEXAS SH]lViEK~ JACOBS & FLNKLF_,A~ L.L.P. Excavating, Inc. Linder-Stahl Const. Co., Inc- Pate Brothers~ Dallas Water Supply Line No. 3 CONSULTING ENGINEERS P.O. Box 248 2200 Cantrell Sansom Rd. 780 West Mar Section 3A(1 ) Dallas, Texas Lewisville, Texas 75067-0248 Fort Worth, Texas 76131 Kennedale, Te ITEM APPROXIMATE UNIT BID UNIT BID '~ UNIT BID NO. QUANTITIES UNIT DESCRIPTION PRICE EXTENSION PRICE EXTENSION PRICE 1 2,230 L.F. 60" Reinf. Conc. Cylinder Pipe (E-301) Waterline by Open Cut w/Class "F" Embed. $273.25 $609,347.50 $203.00 $452,690.00 $239.05 2 I L.S. 300' Aerial Crossing ind. 60" Reinf Conc Cylinder Pipe Waterline, Air & Vacuum Valve $465,000.00 $465,000.0{3 $484,635.00 $484,635.00 $531,958.91 3 140 V.F. Constructing 30" Drilled Shaft $120.00 $16,800.0{:: $102.00 $14,280.00 $218.06 t: 284 V.F. Constructing 42-Inch Drilled Shaft $150.00 $42,600.0{3 $138.00 $39,192.00 $230.08 5 2 Ea. Constructing 10-inch Blow-offValve with Manhole and all related appurtenances $10,000.00 $20,000.00 $3,400.00 $6,800.0{3 $7,645.61 6 1 Ea. Construct 8" Air & Vacuum Release Valve with Manhole and all related appurtenances $9,000.00 $9,000.00 $7,200.00 $7,200.00 $6,396.79 7 1 L.S. 60" RCCp Dished Head Plug designed for Testing $6,500.00 $6,500.00 $6,500.00 $6,500.0{3 $6,554.90 _ 8 1 LS. ;Removing, Salvaging and Utilizing Existing 60-Inch Plug $2,500.00 $2,500.00 $240,00 $240.0{3 $1.11 9 195 S.Y. Removal and Replacement of Existing HMAC Drive $25.00 $4,875.00 $30.00 $5,850.0{3. $13.99 10 60 S.Y. Removal and Replacement of Existing Gravel Drive $10.00 $600.00 $9.00 $540.00 $5.28 11 300 L.F. Removal and Replacement of Barbed Wire Fence $3.00 $900.00 $8.25 $2,475.00 $3.89 12 100 L.F. Removal and Replacement of Chain Link Fence $20.00 $2,000.00 $15.00 $1,500,00 $7.78 13 1 Ea. Furnishing and Installing Cathodic Test Station, as detailed in Plans $1,000.00i $1,000.00 $720.00 $720.00 $294.42 14 I L.S. 60" Reinf. Conc. Cylinder Pipe Closure &Connect to Existing 60" RCCP Waterline $10,500.00 $10,500.00 $6,500.00 $6,500.00 $14,831.85 · ~ 9 Ea. Furnish & Plant 4" Caliper Cedar Elm, in locations to be designated by Owner $500.00 $4,500.00 $520.00 $4,680.00 $472.18 ~d 8 Ea. Furnish & Plac 4" Caliper Shumard Red Oak, in locations to be designated by Owner $500.00 $4,000.00 $560.00 $4,480.00 $499.95 17 8 Ea. Furnish &Plac 4" Caliper Live Oak, in locations to be designated by Owner $500.00 $4,000.00 $560.00 $4,480.00 $499.95 18 50 C.Y. Extra Crushed Stone for Embedment, not called for on the Plans $35.00 $1,750.00 $24.00 $1,200.00 $40.00 19 20 C.Y. Extra 2000 PSI Concrete for Embedment, not called for on the Plans $100.00 $2,000.00 $74.00 $1,480.0__90 $94.44 20 2,300 L.F. Furnishing and Installing Erosion Protection Devices $1.50 $3,450.00 $3.50 $8,050.00 $1.11 21 2,230 L.F. Designing and Protecting Trench Safety Systems $1.00 $2,230,00 $4.00! $8,920.00 $3.89 22 1 L.S. All Costs Related to Mobilization for the Project, as defined in Section 02100 $20,000.00 $20,000.00 $183,000.00 $183,000.00 $40,741.96 TOTAL AMOUNT BID (Items I Through 22) $1,233,552.50 $1,245,412.00 Calendar Days Bid 200 140 140 TABULATION OF BIDS n~D oF n~D oF DATE: February 14, 1997 PROJECT: CITY OF IRVING, TEXAS SHI~'IEK, JACOBS & FINKLEA, LLP. Johnson Bros. Corporation M-Co Construction, Inc. Dallas Water Supply Line No. 3 CONSULTING ENG]"NEERS 14200 Midway Road, #118 6816 Harmonson Rd. Section 3A(1 ) Da].]as, Texas Dallas, Texas 75244 Fort Worth, Texas 76180 ITEM APPROXIMATE UNIT BID I UNIT BID NO. QUANTITIES UNIT DESCRIPTION PRICE EXTENSION PRICE EXTENSION 1 2,230 L.F. 60" Reinf. Conc. Cylinder Pipe (E-301) Waterline by Open Cut w/Class "F" Embed. $269.00 $599,870.00 $261.00 $582,030.0(; 2 I L.S. 300' Aerial Crossing incl. 60" Reinf Conc Cylinder Pipe Waterline, Air & Vacuum Valve $600,000.00 $600,000.00 $632,659.00 $632,659.0C 3 140 V.F. Constructing 30" Drilled Shaft $120.00 $16,800.00 $170.00 $23,800.0(; 284 V.F. Constructing 42-Inch Drilled Shaft $200.00 $56,800.00 $215.00 $61,060.00 5 2 Ea. Constructing 1 O-inch Blow-off Valve with Manhole and all related appurtenances $10,000.00 $20,000.00 $9,215.00 $18,430.00 6 1 Ea. Construct 8" Air & Vacuum Release Valve with Manhole and all related appurtenances $9,000.00 $9,000.00 $8,025.00 $8,025.00 7 1 LS. 60" RCCP Dished Head Plug designed for Testing $3,000.00 $3,000.00 $6,600.00 $6,600.00 8 1 L.S. Removing, Salvaging and Utilizing Existing 60-Inch Plug $2,000.00 $2,000.00 $1,950.00 $1,950.00 9 195 S.Y. Removal and Replacement of Existing HMAC Drive $20.00 $3,900.00 $48.00 $9,360.00 10 60 S.Y. Removal and Replacement of Existing Gravel Drive $12.00 $720.00 $34.00 $2,040.00 11 300 L.F. Removal and Replacement of Barbed Wire Fence $7.00 $2,100.00 $6.00 $1,800.00 12 100 L.F. Removal and Replacement of Chain Link Fence $20.00 $2,000.0(; $17.00 $1,700.00 13 1 Ea. Furnishing and Installing Cathodic Test Station, as detailed in Plans $2,000.00 $2,000.00~ $1,000.00 $1,000.00 14 I L.S. 60" Reinf. Conc. Cylinder Pipe Closure &Connect to Existing 60" RCCP Waterline $10,000.00 $10,000.00 $9,600.00 $9,600.00 ~ 5 9 Ea. Furnish & Plant 4" Caliper Cedar Elm, in locations to be designated by Owner $250.00 $2,250.00 $480.00 $4,320.00 ,6 8 Ea. Furnish & Plac 4" Caliper Shumard Red Oak, in locations to be designated by Owner $250.00 $2,000.00 $650.00 $5,200.00 17 8 Ea. Furnish & Plac 4" Caliper Live Oak, in locations to be designated by Owner $250.00 $2,000.00 $650.00 $5,200.00 18 50 C.Y. Extra Crushed Stone for Embedment, not called for on the Plans $20.00 $1,000.00 $22.00 $1,100.00 19 20 C.Y. Extra 2000 PSI Concrete for Embedment, not called for on the Plans $70.00 $1,400.00 $88.00 $1,760.00 20 2,300 L.F. Furnishing and Installing Erosion Protection Devices $1.00 $2,300.00 $1.20 $2,760.00 21 2,230 L.F. Designing and Protecting Trench Safety Systems $1.00 $2230.00 $1.00 $2,230.00 22 1 LS. All Costs Related to Mobilization for the Proiect, as defined in Section 02100 $130,000.00 $130,000.00 $122,250.00 $122,250.00 TOTAL AMOUNT BID (Items 1 Through 22) $1,47t,370.00 $t,504,874.00 Calendar Days Bid 140 No Bid