Loading...
ST0701-LR100211CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091193.0080 Ireff - racan Service Date: 01/27/10 8901 Carpenter Frwy. Report Date: 02/11/10 Revision 1 Dallas, TX 75247 214 - 630 -1010 Reg No: F -3272 Client City of Coppell TX Attn: Keith Marvin PO Box 9478 Coppell, TX 75019 Project Southwestern Boulevard Coppell Road to Grapevine Creek Coppell, TX Project Number: 94091193 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: DCCOG504 Supplier: Redi -Mix Batch Time: 1044 Plant: 136 Truck No.: 1186 Ticket No.: 25159904 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pef) Result Specification 4 1/2 3 -5 4.8 3 -6 62 53 150.7 Laboratory Test Data Set Specimen No. ID Diameter Area (in) (sq in) 6.00 28.27 6.00 28.27 6.00 28.27 6.00 28.27 merits: Samples Made By: Terracon Date Received 01/28/10 01/28/10 01/28/10 01/28/10 Sample Date: 01/27/10 Sample Time: 1123 Sampled By: Barry Cuble Weather Conditions: Cloudy, breezy Accumulative Yards: 5 Batch Size (cy): 5 Placement Method: Bucket Water Added Before (gal):0 Water Added After (gal): 0 Sample Location: See Placement Location Placement Location: Wing Wall at south side, east and west walls Date Tested 02/03/10 02/10/10 02/24/10 02/24/10 Age at Test (days) 7 14 28 28 Maximum Compressive Load Strength Fracture (lbs) (psi) Type 143,280 5,070 2 150,440 5,320 5 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Barry Cuble Started: 0900 Lun / Non- eable: 2.50 Reported To: Finished: 1600 Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX Reviewed By: (1) City of Coppell TX (2) Halff Assoc Inc ric . Cleveland, P.E. (1) Lacy Construction (1) PacTrust Pacific Realty Associates LP Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001. 5-2 1-09, Rev 3 Page I of I CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091 193.0084 Service Date: 02/02/10 Report Date: 02/11/10 EM 11111M 'Ifferracon 8901 Carpenter Frwy. Dallas, TX 75247 214 -630 -1010 Reg No: F -3272 Client Project City of Coppel I TX Southwestern Boulevard Attn: Keith Marvin Coppell Road to Grapevine Creels PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94091193 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Sample Date: 02/02/10 Sample Time: 1014 Sampled By: Michael W. Whyman Mix ID: 1701 Weather Conditions: Cloudy Supplier: Lattimore Accumulative Yards: 20 Batch Size (cy): 10 Batch Time: 0925 Plant: 6 Placement Method: Direct Discharge Truck No.: 9114 Ticket No.: 6365462 Water Added Before (gal):20 Field Test Data Water Added After (gal): 0 Sample Location: Sta. 3 +20, Lane 2 and 3 Test Result Specification Placement Location: SW Blvd, W Bound, Sta. 5 +60 to Sta. Slump (in): 4 1/2 3 -5 6 +30 & Sta. 3 +10 to Sta. 3 +30 Air Content ('X.): 6.2 3 -6 Concrete Temp. (F): 58 Ambient Temp. (F): 44 Plastic Unit Wt. (pct): 143.2 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 02/03110 02/05/10 3 92,420 3,270 5 1 2 6.00 28.27 02/03/10 02/09/10 7 126,000 4,460 2 1 3 6.00 28.27 02/03/10 02/16/10 14 1 4 6.00 28.27 02/03/10 03/02/10 28 1 5 6.00 28.27 02/03/10 03/02/10 28 Comments: Samples Made 11y: Terracon . Services: Obtain samples of fresh concrete at the placement locations perform required field tests and cast ompressive strength samples. Terracon 12ep.: Michael W. Whyman Started: 0800 Reported To: Finished: 1230 Contractor: Lacy Construction Report Distribution: (1) City of Coppell Tx (1) City of Coppell TX Reviewed By : (1) City orQippelI Tx (i) Halff Assoc Inc Er' J. Cle P.E. (1) Lacy Cunsuuctiun (I) PncTrust Pacific Really Associntes LP Senior Proj ct Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. ctt0001. 5_ K 3 Page 1 of I CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091 193.0086 "Irerracon Service Date: 02/02/10 8901 Carpenter Frwy. Report Date: 02/11/10 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client City of Coppell TX Attn: Keith Marvin PO Box 9478 Coppell, TX 75019 Project Southwestern Boulevard Coppell Road to Grapevine Creek Coppell, TX Project Number: 94091193 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: DCSOHSO4 Supplier: Redi -Mix Batch Time: 1334 Plant: 259 True[( No.: 1350 Ticket No.: 25161040 Field Test Data Test Slump (in): Air Content (' %,): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pct): Result Specification 4 1/2 3 -5 5.4 3 -6 62 50 149.9 Laboratory Test Data Set Specimen Diameter No. ID (in) I 1 6.00 I 2 6.00 1 3 6.00 1 4 6.00 Area Date Test (lbs) (psi) Type 133,920 4,740 2 Received Sample Information Sample Date: 02/02/10 Sample Time: 1437 Sampled By: Barry Coble Weather Conditions: Sunny, breezy Accumulative Yards: 20 Batch Size (cy): 10 Placement Method: Direct Discharge Added Before (gal): 10 Water Added After (gal): 0 Sample Location: 13' S of N edge and 10' W of E edge Placement Location: Paving at Bridge approach slab, E side Age at Date 02/09/ 10 02/1 G /10 03/02/10 03/02/10 Maximum Compressive Load Strength Fracture (lbs) (psi) Type 133,920 4,740 2 Age at Tested 02/09/ 10 02/1 G /10 03/02/10 03/02/10 Maximum Compressive Load Strength Fracture Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations perform requu"ed field tests and c st compressive strength samples. Terracon Rep.: Barry Coble Started: 1200 Reported To: Finished: 1630 Contractor: Lacy Construction Report Distribution: (I) City of Coppell TN (I) C(ly of Coppell TX Reviewed By: (I) City of Coppcl l "I'X (2) HaIfF Assoc Inc Eric Cl veland, P.E. (I) Lncy Construction (I) PncTnst Pacific Really Associates LP Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively forthe use of the client indicated above and shall not be reproduced except in full without the written consent of our company, Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cnotn,i, s.,i.,P o. Page 1 of I (lbs) (psi) Type 133,920 4,740 2 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations perform requu"ed field tests and c st compressive strength samples. Terracon Rep.: Barry Coble Started: 1200 Reported To: Finished: 1630 Contractor: Lacy Construction Report Distribution: (I) City of Coppell TN (I) C(ly of Coppell TX Reviewed By: (I) City of Coppcl l "I'X (2) HaIfF Assoc Inc Eric Cl veland, P.E. (I) Lncy Construction (I) PncTnst Pacific Really Associates LP Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively forthe use of the client indicated above and shall not be reproduced except in full without the written consent of our company, Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cnotn,i, s.,i.,P o. Page 1 of I CONCRETE COMPRESSIVE STRENGTH TEST REPORT am EM Report Number: 94091 193.0064 'Im Ve I= Alp a cm i i n Service Date: 01/13/10 8901 Carpenter Frwy. Report Date: 02/11/10 Revision 2 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client City of Coppell TX Attn: Keith Marvin PO Box 9478 Coppell, TX 75019 Project Southwestern Boulevard Coppell Road to Grapevine Creek Coppell, TX Project Number: 94091193 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: Supplier: Lacy Batch Time: Plant: Truck No.: Ticket No.: Field Test Data Test Slump (in): Air Content (' %.): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf) Result Specification 4 1 -3 9.2 3 -6 52 46 142.1 Laboratory Test Data Set Specimen Diameter No. ID (in) I I 6.00 1 2 6.00 1 3 6.00 1 4 6.00 Sample Date: 01/13/10 Sample Time: 0958 Sampled By: Christopher P. Moran Weather Conditions: Sunny, light breeze Accumulative Yards: 16 Batch Size (cy): 8 Placement Method: Direct Discharge Water Added Before (gal):0 Load Water Added After (gal): 0 Sample Location: Sta. 12 +60 Placement Location: Paving from Sta. 7 +25 to Sta. 12 +60, (lbs) west of bridge Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locationq perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher P. Moran Started: 0800 Reported To: Alfredo, Lacy Construction Finished: 1330 Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX (1) City ul'Coppcll 'I'X (2) Hnlff Assoc Inc (1) Lacy C'onsiructim (1) PncTrust Pacific Really Associates LP Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. r•touan, 21-09, K-3 Page I of 3 Age at Maximum Compressive Area Date Date Test Load Strength Fracture (sq in) Received Tested (days) (lbs) (psi) Type 28.27 01/14/10 01/20/10 7 135,440 4,790 2 28.27 01/14/10 01/27/10 14 170,030 6,010 2 28.27 01/14/10 02/10/10 28 185,890 6,580 2 28.27 01/14/10 02/10/10 28 184,820 6,540 2 Average (28 days) 6,560 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locationq perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher P. Moran Started: 0800 Reported To: Alfredo, Lacy Construction Finished: 1330 Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX (1) City ul'Coppcll 'I'X (2) Hnlff Assoc Inc (1) Lacy C'onsiructim (1) PncTrust Pacific Really Associates LP Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. r•touan, 21-09, K-3 Page I of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091 193.0064 "Irerracon Service Date: 01/13/10 8901 Carpenter Frwy. Report Date: 02/11/10 Revision 2 Dallas, TX 75247 214 -630 -1010 Reg No:F -3272 Client City of Coppell 'rX Attn: Keith Marvin PO Box 9478 Coppell, TX 75019 Material Information Specified Strength: 4,000 psi a 28 days Mix ID: Supplier: Lacy Batch Time: Plant: Truck No.: Ticket No.: Field Test Data Test Slump (in): Air Content (' %,): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pet): Result Specification 3 1 -3 5.0 3 -6 57 48 151.0 Laboratory Test Data Project Southwestern Boulevard Coppell Road to Grapevine Creek Coppell, TX Protect Number: 94091193 Sample Information Sample Date: 01/13/10 Sample Time: 1055 Sampled By: Christopher P. Moran Weather Conditions: Sunny, light breeze Accumulative Yards: Batch Size (cy): 8 Placement Method: Direct Discharge Water Added Before (gal):0 Tested Water Added After (gal): 0 Sample Location: Sta. 10 +25 Placement Location: Paving from Sta. 7 +25 to Sta. 12 +60, 2 west of bridge Set Specimen Diameter Area Date Date No. ID (in) (sq in) Received Tested 2 1 6.00 28.27 01/14/10 01/16/10 2 2 6.00 28.27 01/14/10 01/20/10 2 3 6.00 28.27 01/14/10 01/27/10 2 4 6.00 28.27 01/14/10 02/10/10 2 5 6.00 28.27 01/14/10 02/10/10 Age at Maximum Compressive Test Load Strength Fracture (days) (lbs) (psi) Type 3 108,890 3,850 5 7 130,560 4,620 2 14 174,950 6,190 2 28 185,010 6,540 2 28 186,080 6,580 2 Average (28 days) 6,560 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made 13y: Terracon Services: Obtain samples of fresh concrete at the placement locations perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher P. Moran Started: 0800 Reported To: Alfredo, Lacy Construction Finished: 1330 Contractor: Lacy Construction Report Distribution: (1) City of C'oppcll 'I'x (1) City or Coppell TX (1) City ol'Coppcll 'I'x (2) Hilff Assoc Inc (1) Lacy Construction (1) PacTnist Pacific Reilly Associates LP Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. t'ituuuI, 5 _' I AN. Rcr 3 Page 2 of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT am Report Number: 94091 193.0064 ImVerlwacon Service Date: 01/13/10 .8901 Carpenter Frwy. Report Date: 02/11/10 Revision 2 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client City of Coppell TX Atha: Keith Marvin PO Box 9478 Coppell, TX 75019 Project Southwestern Boulevard Coppell Road to Grapevine Creek Coppell, TX Project Number: 94091193 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: Supplier: Lacy Batch Time: Plant: Truck No.: Ticket No.: Field Test Data Test Slump (in): Air Content Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pct): Result Specification 3 1/4 1 -3 5.9 3 -6 59 50 148.6 Laboratory Test Data Set Specimen Diameter Area Date No. ID (in) (sq in) Received 3 1 6.00 28.27 01/14/10 3 2 6.00 28.27 01/14/10 3 3 6.00 28.27 01/14/10 3 4 6.00 28.27 01/14/10 Sample Information Sample Date: 01/13/10 Sample Time: 1145 Sampled By: Christopher P. Moran Weather Conditions: Sunny, light breeze Accumulative Yards: Batch Size (cy): 8 Placement Method: Direct Discharge Water Added Before (gal):0 97,580 Water Added After (gal): 0 Sample Location: Sta. 8 +00 Placement Location: Paving from Sta. 7 +25 to Sta. 12 +60, 02/10/10 west of bridge Compressive Age at Maximum Date Test Load Tested (days) (lbs) l /20/10 7 97,580 01/27/10 14 143,410 02/10/10 28' 156,720 02/10/10 28 155,220 Average (28 days) Compressive Strength Fracture (psi) Type 3,450 2 5,070 2 5,540 4 5,490 4 5,520 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement location8 perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher P. Moran Started: 0800 Reported To: Alfredo, Lacy Construction Finished: 1330 Contractor: Lacy Construction Report Distribution: (1) City ol'Cuppcll TX (1) City of Coppcll'rx (1) Lacy Constniction Test Methods: (1) City of Coppell TX Reviewed By: (2) Hnlff Assoc Inc (1) PacTntst Pacific Really Associates LP ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172; ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively forthe use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. (1(004)1.3 -21-011. R,•,.a Page 3 of 3 Senior Project Manager CONCRETE COMPRESSIVE STRENGTH TEST REPORT mms ME Report Number: 94091194.0013 flerracon Service Date: 01/13/10 8901 Carpenter Frwy. Report Date: 02/11/10 Revision 2 Dallas, TX 75247 214 - 630 -1010 Reg No: F -3272 Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: Supplier: Batch Time: Plant: Truck No.: Ticket No.: Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 23/4 1 -3 6.5 3 -6 60 53 147.7 Laboratory Test Data Sample Date: 01/13/10 Sample Time: 1400 Sampled By: Christopher P. Moran Weather Conditions: Overcast, windy Accumulative Yards: Batch Size (cy): 8 Placement Method: Direct Discharge Water Added Before (gal):0 Water Added After (gal): 0 Sample Location: Sta, 23 +00 Placement Location: Paving, east of bridge from Sta. 15 +50 to Sta. 23 +00 Set Specimen Diameter Area Date Date No. ID (in) (sq in) Received Tested 1 1 6.00 28.27 01/14/10 01/20/10 1 2 6.00 28.27 01/14/10 01/27/10 1 3 6.00 28.27 01/14/10 02/10/10 1 4 6.00 28.27 01/14/10 02/10/10 Age at Maximum Compressive Test Load Strength Fracture (days) (lbs) (psi) Type 7 143,840 5,090 2 14 159,900 5,660 2 28 169,540 6,000 2 28 171,100 6,050 2 Average (28 days) 6,030 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher P. Moran Started: 1330 Reported To: Finished: 1800 Contractor: Lacy Construction Report Distribution: (1) PacTrust Pacific Realty Associates LP (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Constnlction Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. C110001, 5.21 -09, Rev.7 Page 1 of 4 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091194.0013 Irerracon Service Date: 01/13/10 8901 Carpenter Frwy. Report Date: 02/11/10 Revision 2 Dallas, TX 75247 214 - 630 -1010 Reg No: F -3272 Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: Supplier: Batch Time: Plant: Truck No.: Ticket No.: Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 3 1 -3 5.9 3 -6 58 50 149.6 Laboratory Test Data Set Specimen Diameter Area Date No. ID (in) (sq in) Received 2 1 6.00 28.27 01/14/10 2 2 6.00 28.27 01/14/10 2 3 6.00 28.27 01/14/10 2 4 6.00 28.27 01/14/10 Sample Date: 01/13/10 Sample Time: 1429 Sampled By: Christopher P. Moran Weather Conditions: Overcast, windy Accumulative Yards: Batch Size (cy): 8 Placement Method: Direct Discharge Water Added Before (gal):0 156,620 Water Added After (gal): 0 Sample Location: Sta. 21 +25 Placement Location: Paving, east of bridge from Sta. 15 +50 02/10/10 to Sta. 23 +00 Compressive Age at Maximum Date Test Load Tested (days) (lbs) 01/20/10 7 156,620 01/27/10 14 173,130 02/10/10 28 198,590 02/10/10 28 181,330 Average (28 days) Compressive Strength Fracture (psi) Type 5,540 2 6,120 2 7,020 2 6,410 2 6,720 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher P. Moran Started: 1330 Reported To: Finished: 1800 Contractor: Lacy Construction Report Distribution: (1) PacTnist Pacific Realty Associates LP (1) City ofCoppell TX (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Construction Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 5- 21.09, Rm3 Page 2 of 4 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091194.0013 Terracon Service Date: 01/13/10 8901 CarpenterFrwy. Report Date: 02/1 1/10 Revision 2 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: Supplier: Batch Time: Plant: Truck No.: Ticket No.: Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 2 1 -3 6.4 3 -6 58 50 149.1 Laboratory Test Data Sample Date: 01/13/10 Sample Time: 1532 Sampled By: Christopher P. Moran Weather Conditions: Overcast, windy Accumulative Yards: Batch Size (cy): 8 Placement Method: Direct Discharge Water Added Before (gal):0 Tested Water Added After (gal): 0 Sample Location: Sta. 19 +10 Placement Location: Paving, east of bridge from Sta. 15 +50 3 to Sta. 23 +00 Set Specimen Diameter Area Date Date No. ID (in) (sq in) Received Tested 3 1 6.00 28.27 01/14/10 01/20/10 3 2 6.00 28.27 01/14/10 01/27/10 3 3 6.00 28.27 01/14/10 02/10/10 3 4 6.00 28.27 01/14/10 02/10/10 Age at Maximum Compressive Test Load Strength Fracture (days) (lbs) (psi) Type 7 151,030 5,340 2 14 175,860 6,220 2 28 195,670 6,920 2 28 182,150 6,440 2 Average (28 days) 6,680 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher P. Moran Started: 1330 Reported To: Finished: 1800 Contractor: Lacy Construction Report Distribution: (1) Pac'rrust Pacific Realty Associates LP (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc (I ) Lacy Construction Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1. 5.21 -09. Rm3 Page 3 of 4 CONCRETE COMPRESSIVE STRENGTH TEST REPORT IlMill Report Number: 94091194.0013 Ferracon Service Date: 01/13/10 8901 Carpenter Frwy. Report Date: 02/11/10 Revision 2 Dallas, TX 75247 214 - 630 -1010 Reg No: F -3272 Client PaCTrt.lst Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: Supplier: Batch Time: Plant: Truck No.: Ticket No.: Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 3 1 -3 6.3 3 -6 58 49 148.1 Laboratory Test Data Set Specimen Diameter Area Date No. ID (in) (sq in) Received 4 1 6.00 28.27 01/14/10 4 2 6.00 28.27 01/14/10 4 3 6.00 28.27 01/14/10 4 4 6.00 28.27 01/14/10 Sample Date: 01/13/10 Sample Time: 1641 Sampled By: Christopher P. Moran Weather Conditions: Overcast, windy Accumulative Yards: 400 Batch Size (cy): 6 Placement Method: Direct Discharge Water Added Before (gal):0 144,890 Water Added After (gal): 0 Sample Location: Sta. 17 +25 Placement Location: Paving, east of bridge from Sta. 15 +50 02/10/10 to Sta. 23 +00 Compressive Age at Maximum Date Test Load Tested (days) (lbs) 01/20/10 7 144,890 01/27/10 14 166,890 02/10/10 28 187,590 02/10/10 28 189,300 Average (28 days) Compressive Strength Fracture (psi) Type 5,120 2 5,900 2 6,640 4 6,700 4 6,670 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast com ressive strength samples. Terracon Rep.: Christopher P. Moran Started: 1330 Reported To: Finished: 1800 Contractor: Lacy Construction Report Distribution: (1) PacTrust Pacific Realty Associates LP (1) City ofCoppell TX Reviewed By: (1) City ofCoppell TX (2) HalffAssoc Inc Eric J. Cle eland, P.E. (1) Lacv Constniction Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. C110001. 5- 21 -09, Rev.3 Page 4 of 4