Loading...
ST0701-LR100210CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091193.0062 Irerracon Service Date: 01/12/10 8901 Carpenter Frwy. Report Date: 02/10/10 Revision 2 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client Project City of Coppell TX Southwestern Boulevard Attn: Keith Marvin Coppell Road to Grapevine Creek PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94091193 Material Information Sample Information Specified Strength Mix ID: Supplier: Batch Time: Truck No.: Field Test Data 4,000 psi @ 28 days Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Plant: Ticket No.: Result Specification 2 1 -3 6.1 3 -6 52 40 147.5 Laboratory Test Data Set Specimen Diameter Area Date No. ID (in) (sq in) Received 1 1 6.00 2827 01/13/10 1 2 6.00 28.27 01/13/10 1 3 6.00 28.27 01/13/10 1 4 6.00 28.27 01/13/10 Sample Date: 01/12/10 Sample Time: 0921 Sampled By: Christopher P. Moran Weather Conditions: Clear, light breeze Accumulative Yards: 16 Batch Size (cy): 8 Placement Method: Direct Discharge Water Added Before (gal):0 148,250 Water Added After (gal): 0 Sample Location: Sta. 3 +40 Placement Location: Pavement, Sta. 3 +40 to Sta. 5 +50 Compressive Age at Maximum Date Test Load Tested (days) (lbs) 01/19/10 7 148,250 01/26/10 14 1 70,420 02/09/10 28 201,560 02/09/10 28 191,010 Average (28 days) Compressive Strength Fracture (psi) Type 5,240 4 6,030 2 7,130 2 6,760 2 6,950 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher P. Moran Started: 0700 Reported To: Finished: 1600 Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacv Conslntction (1) PaCTnisl Pacific Realty Associates LP Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROW 1, 5- 21 -09, ReO Page I of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091193.0062 Service Date: 01/12/10 8901 Carpenter Frwy. Report Date: 02/10/10 Revision 2 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client Project City of Coppell TX Southwestern Boulevard Attn: Keith Marvin Coppell Road to Grapevine Creek PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94091193 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: Supplier: Batch Time: Plant: Truck No.: Ticket No.: Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 3 3/4 1 -3 3.6 3 -6 54 42 151.0 Laboratory Test Data Sample Date: 01/12/10 Sample Time: 1017 Sampled By: Christopher P. Moran Weather Conditions: Clear, light breeze Accumulative Yards: 112 Batch Size (cy): 8 Placement Method: Direct Discharge Water Added Before (gal):0 Tested Water Added After (gal): 0 Sample Location: Sta. 4 +25 Placement Location: Pavement, Sta. 3 +40 to Sta. 5 +50 Set Specimen Diameter Area Date Date No. ID (in) (sq in) Received Tested 2 1 6.00 28.27 01/13/10 01/19/10 2 2 6.00 28.27 01/13/10 01/26/10 2 3 6.00 28.27 01/13/10 02/09/10 2 4 6.00 28.27 01/13/10 02/09/10 Age at Maximum Compressive Test Load Strength Fracture (days) (lbs) (psi) Type 7 142,500 5,040 4 14 178,220 6,300 2 28 188,190 6,660 2 28 183,820 6,500 2 Average (28 days) 6,580 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon . Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher P. Moran Started: 0700 Reported To: Finished: 1600 Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Construction (1) PacTrust Pacific Realty Associates LP Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not riecessarily indicative of the properties of other apparently similar or identical materials. CR0001, 5.21 -09, Rev.3 Page 2 of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT law Report Number: 94091193.0062 ierracon Service Date: 01/12/10 8901 Carpenter Frwy. Report Date: 02/10/10 Revision 2 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client Project City of Coppell TX Southwestern Boulevard Attn: Keith Marvin Coppell Road to Grapevine Creek PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94091193 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: Supplier: Batch Time: Plant: Truck No.: Ticket No.: Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 23/4 1 -3 5.2 3 -6 53 46 149.7 Sample Date: 01/12/10 Sample Time: 1042 Sampled By: Christopher P. Moran Weather Conditions: Clear, light breeze Accumulative Yards: 208 Batch Size (cy): 8 Placement Method: Direct Discharge Water Added Before (gal):0 Water Added After (gal): 0 Sample Location: Sta. 5 +25 Placement Location: Pavement, Sta. 3 +40 to Sta. 5 +50 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 3 1 6.00 28.27 01/13/10 01/16/10 4 125,920 4,450 5 3 2 6.00 28.27 01/13/10 01/19/10 7 156,930 5,550 4 3 3 6.00 28.27 01/13/10 01/26/10 14 177,270 6,270 2 3 4 6.00 28.27 01/13/10 02/09/10 28 194,370 6,870 2 3 5 6.00 28.27 01/13/10 02/09/10 28 190,600 6,740 2 Average (28 days) 6,810 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required fie samples. Terracon Rep.: Christopher P. Moran Started: 0700 Reported To: Finished: 1600 Contractor: Lacy Construction Report Distribution: Reviewed B (1) City of Coppell TX (l) City of Coppell TX y' (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Construction (1) PacTrust Pacific Realty Associates LP Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CRa0o 1, 5- 21.09, Rev,3 Page 3 of 3 Senior Project Manager