Loading...
North Gateway 9-CS100330T H E - C 1 T Y - O F MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, P.E., Dir. of Engineering / Public Works Glenn Hollowell, Asst. Dir. of Public Works Lee Stone, Commercial Bldg. Inspector Tim Oates, Deputy Chief/Prevention From: Albert Samaniego, Construction Inspector Office Phone: (972) 304 -3685 Fax: (972) 304 -3570 Date: March 30, 2010 RE: WALK -THRU INSPECTION for N. Gateway Plaza, Lot 9 783 N. Denton Tap Rd A final walk -thru for paving, utilities and drainage on the referenced project has been scheduled for: Wednesday, March 31, 2010 at 9:00 a.m. Please let me know if I can be of further assistance. cc: Fast Trak Construction fax # 214 - 368 -0528 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"