SS9402C-AG 991214 AGENDA RE-~UEST FORM (~~J ~7~Z~rTi~ET~G: December 14, 1999 ITEM # ~L~__ ITEM CAPTION: Consider approval to close Bethel Road between Freeport Parkway and Royal Lane for approximately 8 weeks for the reconstruction of the trench line on the south side of Bethel Road. TITIk~.~i~ Director of En~/Public Works STAFF COMMENTS: APPROVED BY DAC~Y COUNCIL See attached memo. BUDGET AMT. $ FINANCIAL COMMENTS: AMT. EST. $ DIR. INITIALS: ~ Agenda Request Form - Revised 2/99 FIN. REVIE~ +\-BID $ CITY MANAGER REVIEW: Document Name: #9912141 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Mayor and City Council From: Ken Griffin, P.E., Dir. of Engineering and Public Works Consider approval to close Bethel Road between Freeport Parkway and Royal Lane for approximately 8 weeks for the reconstruction of the trench line on the south side of Bethel Road. Date: December 14, 1999 In early 1996 a sanitary sewer line was installed as per the City's Wastewater Master Plan from Grapevine Creek west along the south side of Bethel Road. Over time the trench line for that sanitary sewer line has been collapsing underneath the south side of Bethel Road. In May of 1997 the City began the removal, recompaction and asphalt replacement west of Grapevine Creek to approximately Coppell Road (south). Staff is requesting a continuance of the recompaction work for the section between Freeport Parkway and Royal Lane. At least 3 feet of the existing trench line will be removed and, a geo fabric will be put in and then recompacted to 100% density. In essence, we will be attempting to create a bridge over any other bad areas in the trench line. One of the major issues associated with the removal and replacement of a portion of the backfill is the traffic currently on the roadway. In late 1995, City Council approved a plan whereby the east bound traffic on Bethel Road was rerouted south at either Royal Lane or Freeport Parkway to Southwestern Blvd. then back north on Denton Tap Road to avoid the section of roadway between Freeport Parkway and Grapevine Creek. To expedite the project, staff is requesting Council concurrence to close Bethel Road to traffic between Freeport Parkway and Royal Lane with the appropriate rerouting to Gateway Blvd. to Freeport Parkway and then back to Bethel Road (see attached schematic). If the City is allowed to close Bethel Road entirely between Freeport and Royal, the contractor has indicated that it will take approximately two months to perform the work. This is obviously assuming that we have the appropriate weather to remove and replace the trench line. Without the ability to close the roadway, it will be very difficult to perform this work, especially in an expedient manner. Staff will be available to answer any questions at the Council meeting. "CITY OF COPPELL ENGINEERING-EXCELLENCE BY DESIGN" W SCALE: 1" -- 2000' ~EGEND PROPOSED DETOUR ROUTE ~ DIRECTION DF TRAVEL uNO EAST BOUND TRAFFIC ON BETHEL ROAD FROM FREEPORT PARKWAY TO DENTON TAP ROAD. WESTBOUND TRAFFIC ONLY. SCALE: 1" = 2000' PRDPD~;ED I)ETDUR ROUTE ~ DIRECTION DF TRAVEL BETHEL RDAD WILL BE CLD~ED BETWEEN FREEPDRT PARKWAY AND RDYAL LANE TD ALLDW CDNTRACTDR ADEQUATE WDRKING RDDM,