Rolling Oaks MC-CS080814Page 1 of 2
Michael Garza - RE: Rolling Oaks Memorial Center: Construction Schedule
From: "Ken Baxter" <kbaxter @jstarchitects.com>
To: "Michael Garza" <mgarza @ci.coppell.tx.us>
Date: 8/14/2008 2:11 PM
Subject: RE: Rolling Oaks Memorial Center: Construction Schedule
Mike,
Thanks for the updated schedule. We should have received a copy but we have been in close contact with Fain
recently concerning overall time frames. It appears these two building facilities are behind as they
have extended the construction duration time for these items and rescheduled /rearranged other portions from
the original schedule. We find it to be acceptable at this time since the these modifications don't appear to
have impacted any original critical path items and most importantly that the cemetery completion date has not
been effected.
We will continue to monitor the progress. Let us know if you have any questions or we can assist in any way.
Thanks,
Ken Baxter
Senior Project Manager
J. Stuart Todd, Inc,
Architecture /Interiors /P /a n n i n g
2919 We /born
Da / /as, Texas 75219
214- 522 -4033
214 -522- 7988 fx.
From: Michael Garza [ mailto:mgarza @ci.coppell.tx.us]
Sent: Thursday, August 14, 2008 1:21 PM
To: Ken Baxter
Subject: Re: Rolling Oaks Memorial Center: Construction Schedule
Ken,
Attached is the updated schedule that Alex sent me on Monday. The updated schedule shows that they are
behind on the pavilion and columbarium.
thanks,
Michael Garza
Engineering Dept.
City of Coppell
Office: 972 - 304 -7019
Fax: 972 - 304 -3570
0 Please consider the environment before printing this e-mail
file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \48A43DO7City_o... 4/5/2010
Page 1 of 1
Michael Garza - Rolling Oaks Memorial Center: Construction Schedule
From: "Ken Baxter" <kbaxter( ',j starchitects.com>
To: <mgarza(�'.&i.coppell.tx.us>
Date: 8/14/2008 11:51 AM
Subject: Rolling Oaks Memorial Center: Construction Schedule
Attachments: Rolling Oaks Construction Schedule_061308.pdf
Mike,
Attached is the overall time table which includes the start /finish for the the columbarium and pavilion building but it
doesn't have a break out for these buildings.
Let us know if you need further information on this or anything else.
Thanks,
Ken Baxter
Senior Project Manager
J. Stuart Todd, Inc.
Architecture/Interiors /Planning
2919 Welborn
Dallas, Texas 75219
214 -522 -4033
214 -522- 7988 fx.
file: HC: ADocuments and Settings \radloo \Local Settings\ Temp \XPgrpwise \48A41 C33City_of... 4/5/2010
1500.I •
Mo bilization
10 2
10
15MAY08
29MAY08
0
0
Mobilization
1500.2
(Ero sion control
5 2
5
15MAY08
21 MAY08
0
0
== Erosion control
1500.3
Construction entrance
2 2
2122MAY08
*
23MAY08
0
0
0 Construction entrance
2200.1
Mass grading
30 3
30
30MAY08 A
11JUL08
0
0
-
Mass grading
2200.3
Underground utilities
45 3
45
JU
14L08
15SEP08
0
D
Underground utilities
3100.1
Flagpole base formed, poured, & finished
15 3
15
14JUL08
01AUG08
0
D
O Flagpole base formed, poured, & finished
31002
Exterior fence footings form and poured
22 3
j 22
14JUL08
12AUG08
0
D
-. Exterior fence footings formed and poured
4100 -1
Exterior Fence Masonry
45 3
45
13AUG08
150CT08
0
D
Exterior Fence Masonry
2200.2
Lime stabilization
25 3
25
15SEP08
20OCT08
0
D
O Lime stabilization
2200.4
Finish mass grading
15 3
15
16SEP
06OCT08
0
D
E-- Finish mass grading
2835
Exterior iron fence and gates
20 3
20
16OCT08
12NOV08
0
0
- . Exterior iron fence and gates
2510.1
Concrete paving and sidewalks
56 3
56
21 OCT08
13JAN09
0
0
- - 1 Concrete paving and sidewalks
2100
Remove existing pipe fence
5 3
5
13NOV08
19NOV08
0
D
91 Remove existing pipe fence
2260
Final grade
1 3
15
24NOV08
12DEC08
0
fiI Final grade
2810.2
Irrigation and Landscape
25 3
25
15DEC08
21JAN09 1
0
0
Irrigation and Landscape
2577
Pavement striping
2 3
2
17MAR09
18MAR09
0
0
0Paverr
10350
Flagpoles
3 3
3
17MAR09
19MAR09
0
0
® Flagpole
6414
64
14JUL08
IOOCT08
0
0
1 8315
83
14JUL08
7816
78
18JUL08
05NOV08
0
1730
Startup and training
5 7
5
22JAN09
28JAN09
0
0
M Startup and training
100
Substantial c ompletion
1 7
1
29JAN09
29JAN09
0
0
p Substantial completion
10001
Punchlist
30 7
30
30JAN09
12MAR09
0
0
ME Punchlist
1710.3
Final cleanup
2 7
2
13MAR09
16MAR09
0
0
fig Final clea
10002
Final completion
1 7
1
20MAR09
20MAR09
0
0
B Final co
Start date
15MAY08
Early bar
Finish date
Data date
20MAR09
15MAY08 -
THE FAIN GROUP
Progress bar
Run date
13 JUND6
ROLLING OAKS MEMORIAL CENTER
Summary bar
bar
Page number 1A
Primavera Systems, Inc.
O Start milestone point
0 Finis milestone point