Loading...
Rolling Oaks MC-CS080814Page 1 of 2 Michael Garza - RE: Rolling Oaks Memorial Center: Construction Schedule From: "Ken Baxter" <kbaxter @jstarchitects.com> To: "Michael Garza" <mgarza @ci.coppell.tx.us> Date: 8/14/2008 2:11 PM Subject: RE: Rolling Oaks Memorial Center: Construction Schedule Mike, Thanks for the updated schedule. We should have received a copy but we have been in close contact with Fain recently concerning overall time frames. It appears these two building facilities are behind as they have extended the construction duration time for these items and rescheduled /rearranged other portions from the original schedule. We find it to be acceptable at this time since the these modifications don't appear to have impacted any original critical path items and most importantly that the cemetery completion date has not been effected. We will continue to monitor the progress. Let us know if you have any questions or we can assist in any way. Thanks, Ken Baxter Senior Project Manager J. Stuart Todd, Inc, Architecture /Interiors /P /a n n i n g 2919 We /born Da / /as, Texas 75219 214- 522 -4033 214 -522- 7988 fx. From: Michael Garza [ mailto:mgarza @ci.coppell.tx.us] Sent: Thursday, August 14, 2008 1:21 PM To: Ken Baxter Subject: Re: Rolling Oaks Memorial Center: Construction Schedule Ken, Attached is the updated schedule that Alex sent me on Monday. The updated schedule shows that they are behind on the pavilion and columbarium. thanks, Michael Garza Engineering Dept. City of Coppell Office: 972 - 304 -7019 Fax: 972 - 304 -3570 0 Please consider the environment before printing this e-mail file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \48A43DO7City_o... 4/5/2010 Page 1 of 1 Michael Garza - Rolling Oaks Memorial Center: Construction Schedule From: "Ken Baxter" <kbaxter( ',j starchitects.com> To: <mgarza(�'.&i.coppell.tx.us> Date: 8/14/2008 11:51 AM Subject: Rolling Oaks Memorial Center: Construction Schedule Attachments: Rolling Oaks Construction Schedule_061308.pdf Mike, Attached is the overall time table which includes the start /finish for the the columbarium and pavilion building but it doesn't have a break out for these buildings. Let us know if you need further information on this or anything else. Thanks, Ken Baxter Senior Project Manager J. Stuart Todd, Inc. Architecture/Interiors /Planning 2919 Welborn Dallas, Texas 75219 214 -522 -4033 214 -522- 7988 fx. file: HC: ADocuments and Settings \radloo \Local Settings\ Temp \XPgrpwise \48A41 C33City_of... 4/5/2010 1500.I • Mo bilization 10 2 10 15MAY08 29MAY08 0 0 Mobilization 1500.2 (Ero sion control 5 2 5 15MAY08 21 MAY08 0 0 == Erosion control 1500.3 Construction entrance 2 2 2122MAY08 * 23MAY08 0 0 0 Construction entrance 2200.1 Mass grading 30 3 30 30MAY08 A 11JUL08 0 0 - Mass grading 2200.3 Underground utilities 45 3 45 JU 14L08 15SEP08 0 D Underground utilities 3100.1 Flagpole base formed, poured, & finished 15 3 15 14JUL08 01AUG08 0 D O Flagpole base formed, poured, & finished 31002 Exterior fence footings form and poured 22 3 j 22 14JUL08 12AUG08 0 D -. Exterior fence footings formed and poured 4100 -1 Exterior Fence Masonry 45 3 45 13AUG08 150CT08 0 D Exterior Fence Masonry 2200.2 Lime stabilization 25 3 25 15SEP08 20OCT08 0 D O Lime stabilization 2200.4 Finish mass grading 15 3 15 16SEP 06OCT08 0 D E-- Finish mass grading 2835 Exterior iron fence and gates 20 3 20 16OCT08 12NOV08 0 0 - . Exterior iron fence and gates 2510.1 Concrete paving and sidewalks 56 3 56 21 OCT08 13JAN09 0 0 - - 1 Concrete paving and sidewalks 2100 Remove existing pipe fence 5 3 5 13NOV08 19NOV08 0 D 91 Remove existing pipe fence 2260 Final grade 1 3 15 24NOV08 12DEC08 0 fiI Final grade 2810.2 Irrigation and Landscape 25 3 25 15DEC08 21JAN09 1 0 0 Irrigation and Landscape 2577 Pavement striping 2 3 2 17MAR09 18MAR09 0 0 0Paverr 10350 Flagpoles 3 3 3 17MAR09 19MAR09 0 0 ® Flagpole 6414 64 14JUL08 IOOCT08 0 0 1 8315 83 14JUL08 7816 78 18JUL08 05NOV08 0 1730 Startup and training 5 7 5 22JAN09 28JAN09 0 0 M Startup and training 100 Substantial c ompletion 1 7 1 29JAN09 29JAN09 0 0 p Substantial completion 10001 Punchlist 30 7 30 30JAN09 12MAR09 0 0 ME Punchlist 1710.3 Final cleanup 2 7 2 13MAR09 16MAR09 0 0 fig Final clea 10002 Final completion 1 7 1 20MAR09 20MAR09 0 0 B Final co Start date 15MAY08 Early bar Finish date Data date 20MAR09 15MAY08 - THE FAIN GROUP Progress bar Run date 13 JUND6 ROLLING OAKS MEMORIAL CENTER Summary bar bar Page number 1A Primavera Systems, Inc. O Start milestone point 0 Finis milestone point