Loading...
Rolling Oaks MC-CS081014 Page 1 of 6 Michael Garza - RE: Rolling Oaks Proposed Gas Design, Etc. From:   "Ken Baxter" <kbaxter@jstarchitects.com> To:   "Alex Fisher" <AFisher@faingp.com> Date:   10/14/2008 10:51 AM Subject:   RE: Rolling Oaks Proposed Gas Design, Etc. CC:"Michael Garza" <mgarza@ci.coppell.tx.us>, "Mike Daniel" <mdaniel@ndmce.com>,     <Ron.Hays@atmosenergy.com>   Alex,   We need to verify with Mr. Hays about the process. I'm assuming the (3) way agreement would be between the Owner/Atmos and the installing contractor which would be the basis of payment,ie. directly from the Owner to the installer? Again I'm assuming. I've left a message with Ron H. to call me concerning the process. Until we fully understand the process I'm also reluctant to assign anything.    Ken Baxter Senior Project Manager   J. Stuart Todd, Inc. Architecture/Interiors/Planning 2919 Welborn Dallas, Texas   75219   214-522-4033 214-522-7988 fx .   From: Alex Fisher [mailto:AFisher@faingp.com] Sent: Tuesday, October 14, 2008 9:43 AM To: Ken Baxter Subject: RE: Rolling Oaks Proposed Gas Design, Etc. Ken –   I forwarded the proposal per your request and also discussed moving forward with Murray Construction.  The contact is very well versed with the process with Atmos.  He has asked that someone sign and fax back to him his proposal basically ensuring payment to him upon completion of the work.  Would the city be willing to make this commitment and sign the proposal for him?  I am a little bit reluctant until I know who is paying who with this project.   Thanks.   Alex   From: Ken Baxter [mailto:kbaxter@jstarchitects.com] Sent: Tuesday, October 14, 2008 8:01 AM To: Alex Fisher Cc: Michael Garza; Mike Daniel file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\48F47998City_of...4/5/2010 Page 2 of 6 Subject: RE: Rolling Oaks Proposed Gas Design, Etc.   Alex,   I spoke with Mike Daniel yesterday and he said Murray Construction Company, Inc. has been around and feels confident with past work performed by this group. Why don't you forward the proposal from Murray on to Ron Hays w/ Atmos to get the (3) way agreement started per his directions. Mike Garza w/ Coppell Engineering is trying to assist us with making contact with Ron Hays to get the process going. Call and we can discuss further. Thanks,   Ken Baxter Senior Project Manager   J. Stuart Todd, Inc. Architecture/Interiors/Planning 2919 Welborn Dallas, Texas   75219   214-522-4033 214-522-7988 fx .     From: Mike Daniel [mailto:mdaniel@ndmce.com] Sent: Monday, October 13, 2008 6:29 PM To: Ken Baxter Cc: 'Michael Garza'; 'Alex Fisher' Subject: RE: Rolling Oaks Proposed Gas Design, Etc. I sent Ron a copy of the proposed easement exhibit some time ago. He is happy with the proposed easement area, but I would assume he will want the easement filed for record before he signs the 3-way. This shouldn't stop him from preparing it though.   From: Ken Baxter [mailto:kbaxter@jstarchitects.com] Sent: Monday, October 13, 2008 5:42 PM To: Mike Daniel Cc: Michael Garza; Alex Fisher Subject: FW: Rolling Oaks Proposed Gas Design, Etc. Mike,   In trying to find out if there's any outstanding information other than what was initially issued from Atmos to Fain for the utilities contractors construction proposals for the new gas line extension. I found this email (see below) from Ron Hays w/ Atmos to Fain Construction regarding outstanding info.. Atmos apparently corresponded to Fain they required further information/clarifications concerning the ROWs necessary in order for them to provide clarifications to their initial design?. Do you have any correspondence between yourself and Atmos between then and now regarding required info?    Again, I'm not sure what he was referring to in this email concerning "outstanding information" and if they have all the necessary info. I'd like to get their (3) way agreement process started.   Let me know what you find. Thanks,   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\48F47998City_of...4/5/2010 Page 3 of 6 Ken Baxter Senior Project Manager   J. Stuart Todd, Inc. Architecture/Interiors/Planning 2919 Welborn Dallas, Texas   75219   214-522-4033 214-522-7988 fx .     From: Alex Fisher [mailto:AFisher@faingp.com] Sent: Friday, September 19, 2008 8:58 AM To: Ken Baxter Subject: FW: Rolling Oaks Proposed Gas Design, Etc. Fyi…..   From: Hays, Ron [mailto:Ron.Hays@atmosenergy.com] Sent: Thursday, September 18, 2008 1:34 PM To: Alex Fisher Cc: Roger Cole; Ed.Whisenant@mastec.com Subject: RE: Rolling Oaks Proposed Gas Design, Etc.   FYI: Mike Daniel with Nathan Meir is working on the ROW/easement issue from the Mobile Home Park to your site. It is my understanding from conversations with Mike that there is no existing City Row along Ruby Road which is where we typically run our gas extensions. I am awaiting information form him on this issue. Thanks.   Ron Hays Project Manager Atmos Energy 14032 Distribution Way Farmers Branch, Tx. 75234 Office: 972-919-1257 Fax: 972-919-1287 This message contains confidential information and is intended only for the individual named.  If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secured or error-free as information could be intercepted, corrupted, lost, destroyed, received late or incomplete, or could contain viruses. The sender therefore does not accept liability for any error or omission in the contents of this message, which arises as a result of e-mail transmission. If verification is required, please request a hard-copy version from the sender. From: Ed Whisenant [mailto:Ed.Whisenant@mastec.com] Sent: Thursday, September 18, 2008 11:37 AM To: AFisher@faingp.com Cc: Roger Cole; Hays, Ron Subject: RE: Rolling Oaks Proposed Gas Design, Etc.   Mr. Fisher there may a delay in providing you a price for the installation of the proposed gas on this project.  It is unclear where the Right of Way ends in file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\48F47998City_of...4/5/2010 Page 4 of 6 relation to the dead end of the gas main inside the trailer park where the proposed tie-in is located.  I would hate to quote you a number and then have to revise the quote due to additional work being outside the scope of the work as I would interpret it.  Mr. Hays with Atmos Energy and I have discussed the matter and he is making every effort o resolve any questions concerning this matter.  As soon as he has the information that he needs he will advise me and I can then provide you with an accurate estimate for the installation of the project.  Please call if you have any questions concerning the above.   Sincerely,   Eddie L. Whisenant Eddie L. Whisenant Estimator MasTec North America 4747 Irving Blvd, Suite 221 Dallas, Texas 75247 Ed.Whisenant@mastec.com 214-571-2548 Office 214-926-2177 Cell   -----Original Message----- From: Roger Cole Sent: Tuesday, September 16, 2008 1:54 PM To: Ed Whisenant Subject: FW: Rolling Oaks Proposed Gas Design, Etc.       -----Original Message----- From: David Holland Sent: Tuesday, September 16, 2008 1:53 PM To: Roger Cole Subject: Fw: Rolling Oaks Proposed Gas Design, Etc.       ----- Original Message ----- From: Alex Fisher <AFisher@faingp.com> To: operations@bjcmgmt.com <operations@bjcmgmt.com>; cbconst1779@aol.com <cbconst1779@aol.com>; wesleysaylors@aol.com <wesleysaylors@aol.com>; mark@conatserconstruction.com <mark@conatserconstruction.com>; dwhitaker@forcecon.net <dwhitaker@forcecon.net>; kwilson@hc-inc.com <kwilson@hc- inc.com>; jcowling_jet@yahoo.com <jcowling_jet@yahoo.com>; David Holland; robert@murraycon.com <robert@murraycon.com>; dennis@tsu1.com <dennis@tsu1.com> Sent: Tue Sep 16 14:48:58 2008 Subject: FW: Rolling Oaks Proposed Gas Design, Etc.   To Whom it May Concern –       I was given your names as contacts for being qualified contractors by Atmos Energy for running underground gas service.  I am needing to obtain a quote for running gas service to a site we are working on in the Coppell area.  Can you review the attachment for the requirements and send me a quote at your earliest convenience?  Please feel free to call me with any questions.     file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\48F47998City_of...4/5/2010 Page 5 of 6   Thank you.           Alex Fisher   Project Manager   The Fain Group   817-927-4388 (Main)   817-927-4389 (Fax)   817-733-6900 (Cell)   afisher@thefaincompany.com <mailto:afisher@thefaincompany.com>                   From: Hays, Ron [mailto:Ron.Hays@atmosenergy.com] Sent: Friday, September 05, 2008 11:13 AM To: Alex Fisher Subject: Rolling Oaks Proposed Gas Design, Etc.       Attached is proposed gas design for ROLLING OAKS MEMORIAL CENTER in Coppell, Texas. Also attached is a list of ATMOS ENERGY approved contractors from which you can acquire bids for installation of the gas piping noted in the design sketch. Also attached is a copy of the Atmos Energy Meter Specification Manual which shows meter location information including above ground clearances, etc. for meter placements related to building structures and other utilities. A minimum clearance of 12 inches is required between our gas pipe and any electrical conduit or direct buried electrical cable. A minimum clearance of 6 inches is required between gas pipe and other underground structures; however we prefer 12 inches. Also attached you will find Atmos Energy paving sleeve requirements that must be followed for any paving/roadway sleeves installed pre-paving for gas installations. The minimum sleeve size for the drive entrance off of Ruby Road will be 4 inch PVC if you plan to pour the driveway before the gas main is installed. The developer will be responsible for any SWPPP requirements for onsite/offsite gas line installation. Once you have chosen a contractor send me a copy of their proposal and we will proceed with the WAS (3 way agreements) and the remaining paperwork required. I will require a minimum of 7 to 10 working days to complete all paperwork and permitting before the construction process can begin pending release of the permit from the City of Coppell.       Any questions feel free to give me a call.   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\48F47998City_of...4/5/2010 Page 6 of 6     Ron Hays   Project Manager   Atmos Energy   14032 Distribution Way   Farmers Branch, Tx. 75234   Office: 972-919-1257   Fax: 972-919-1287   This message contains confidential information and is intended only for the individual named.  If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secured or error-free as information could be intercepted, corrupted, lost, destroyed, received late or incomplete, or could contain viruses. The sender therefore does not accept liability for any error or omission in the contents of this message, which arises as a result of e-mail transmission. If verification is required, please request a hard-copy version from the sender.     ________________________________                   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\48F47998City_of...4/5/2010 Page 2 of 3   From: Alex Fisher [mailto:AFisher@faingp.com] Sent: Tuesday, October 14, 2008 9:45 AM To: Ken Baxter Subject: FW: WAS Information Ken –   I guess this is step number 2.  I still feel like this is something that the city should be signing.  Do you concur?   Alex   From: Hays, Ron [mailto:Ron.Hays@atmosenergy.com] Sent: Tuesday, October 14, 2008 9:41 AM To: Alex Fisher Subject: WAS Information   Yes; that is sufficient. I need the legal name of the developer and the person’s name that is going to sign the WAS agreement for the developer and their title; also an address where Murray Construction is to send their invoice for payment.   Should I send the WAS agreement to you for signature acquisition? Thanks.   PSD: I got a call from Ken Baxter yesterday afternoon inquiring about the process for the main extension. I assume since you sent me this email I don’t need to call him back?   Ron Hays Project Manager Atmos Energy 14032 Distribution Way Farmers Branch, Tx. 75234 Office: 972-919-1257 Fax: 972-919-1287 This message contains confidential information and is intended only for the individual named.  If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secured or error-free as information could be intercepted, corrupted, lost, destroyed, received late or incomplete, or could contain viruses. The sender therefore does not accept liability for any error or omission in the contents of this message, which arises as a result of e-mail transmission. If verification is required, please request a hard-copy version from the sender. From: Alex Fisher [mailto:AFisher@faingp.com] Sent: Tuesday, October 14, 2008 9:31 AM To: Hays, Ron Cc: Ken Baxter; Michael Garza Subject: FW: Gas quote   Ron –   I have attached the bid from the company we are looking at using to run the underground gas service for the Rolling Oaks Memorial Center project in Coppell.  Is this sufficient enough to proceed with the 3 way file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\48F48782City_of...4/5/2010 Page 3 of 3 agreement?   Thank you.   Alex Fisher Project Manager The Fain Group 817-927-4388 (Main) 817-927-4389 (Fax) 817-733-6900 (Cell) afisher@thefaincompany.com         From: Joe Hill [mailto:jhill@murraycon.com] Sent: Tuesday, September 23, 2008 12:11 PM To: Alex Fisher Subject: Gas quote   Alex, attached is our quote for the project listed above please let me know the status as soon as you so we can put on the board. Thanks Joe Hill file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\48F48782City_of...4/5/2010 WORK ASSIGNMENT SUPPLEMENT This Work Assignment Supplement is entered into effective _____________, 200_, by and between _________________ (“CONTRACTOR”), ___________________ (“DEVELOPER”), and Atmos Energy Corporation (“COMPANY”). PERFORMANCE OF WORK - CONTRACTOR will perform the work identified herein (the “Work”) as authorized by COMPANY, pursuant to the terms and conditions in the Assigned Task Agreement between COMPANY and CONTRACTOR, which Agreement is incorporated herein by reference. When and as expressly authorized by COMPANY, and notwithstanding any provision to the contrary in the above-referenced Assigned Task Agreement, DEVELOPER will, without contribution from or obligation on the part of COMPANY, pay CONTRACTOR the full and complete cost of the Work, as mutually agreed between CONTRACTOR and DEVELOPER. SCOPE OF WORK - CONTRACTOR will perform the Work in accordance with the Scope of Work Attachment and the drawings, specifications, and instructions, if any attached hereto, and identified in the List of Attachments set forth herein. DEVELOPER will have the right, at all times, to instruct CONTRACTOR to construct the Work in accordance with the Scope of Work Attachment, but DEVELOPER has no obligation to supervise CONTRACTOR in the performance of the Work. CONTRACTOR will, in consultation with DEVELOPER, assume full responsibility for investigating conditions of any property or facilities at or with respect to which Work will be performed, for the purpose of evaluating and determining the existence and magnitude of any hazards resulting from such Work to such property, or to the property of DEVELOPER, or to the property or physical well-being of any of DEVELOPER’s employees or agents, and CONTRACTOR and/or DEVELOPER, as appropriate, will ensure that DEVELOPER’s and CONTRACTOR’s employees and agents are advised of and fully understand the nature of such hazards and safety precautions that can be taken to eliminate or minimize the dangers relating to such hazards. ACCEPTANCE OF WORK - Upon inspection and acceptance by COMPANY’s inspector of the Work (“Final Acceptance”), DEVELOPER will execute and deliver to COMPANY a Bill of Sale and Assignment substantially in the form attached hereto and made a part hereof, conveying the Work to COMPANY. In addition, if the Work is not located under public rights-of-way or defined public utility easement, DEVELOPER will grant to COMPANY an easement over the Work, which easement will be substantially in the form of the easement attached hereto and made a part hereof. It is understood and agreed that the transfer of the Work installed pursuant to this Agreement, and the granting of any easements to COMPANY hereunder, will be at no cost to COMPANY whatsoever. DEVELOPER must notify COMPANY’s Project Manager at least five days prior to commencement of construction. CONTRACTOR must return all required field construction documents to Atmos Energy including, but not limited to, as- built, test charts and print line data within 10 working days of completion. INVOICES – All invoices will be sent to DEVELOPER at the following address: Address: LIST OF ATTACHMENTS – COMPANY, DEVELOPER, and CONTRACTOR agree that the following described attachments, if any, are incorporated herein in their entirety. 1. Scope of Work Attachment 3. Form of Bill of Sale and Assignment 2. Design Layout of Facilities 4. Form of Easement CONTRACTOR: ATMOS ENERGY CORPORATION By: By: Name: Name: Title: Title: DEVELOPER: By: Name: Title: WORK ASSIGNMENT SUPPLEMENT SCOPE OF WORK ATTACHMENT PROJECT # PROJECT NAME OR SUBDIVISION & PHASE: NUMBER OF METERS: DEVELOPER REQUIREMENTS: GAS MAIN EXTENSION ALLEY DISTRIBUTION: CONTRACTOR will install all gas main(s), service taps, and service line risers required, as part or in furtherance of the Work. CONTRACTOR will be responsible for installing facilities to COMPANY design drawings and specifications including, but not limited to, those pertaining to depth from final grade (minimum 30” for main and 24” for service line), tracer wire, test stations, etc. and Atmos Energy’s Meter Specification Manual. FRONT LOT DISTRIBUTION: CONTRACTOR will install all gas main(s), service taps, and service stubs to 10 feet inside the property line of each lot or tract within the Scope of Work. Curb marker medallions and/or marker balls will be placed to mark all service stubs. CONTRACTOR will be responsible for installing facilities according to COMPANY design drawings and specifications including, but not limited to, those pertaining to depth from final grade (minimum 30” for main and 24” for service stub), tracer wire, test stations, etc. and Atmos Energy’s Meter Specification Manual. STORM WATER POLLUTION PREVENTION PLAN If off-site project requires a SWPPP, DEVELOPER/CONTRACTOR will develop and will be responsible for the plan and will also submit NOI for the off-site project on behalf of all parties. DEVELOPER/CONTRACTOR will provide necessary sediment control measures screening, filters, etc. for installation and restabilization of the off-site project area. DEVELOPER INITIALS: CONTRACTOR will be responsible for providing gas mains of the number, dimensions, and footages specified below: COMPANY will be responsible for the following: 1. Inspecting all work performed by CONTRACTOR in a reasonably timely manner. 2. Notifying DEVELOPER within a reasonable time after Final Acceptance of the Work by COMPANY. 3. Installing service lines and risers for front lot distribution from service stubs in accordance with Atmos Energy’s Meter Specification Manual (available at Atmosenergy.com). WORK ASSIGNMENT SUPPLEMENT DESIGN LAYOUT OF FACILITIES SEE PREVIOUSLY PROVIDED DESIGN WORK ASSIGNMENT SUPPLEMENT FORM OF BILL OF SALE AND ASSIGNMENT STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF § THAT for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, , a corporation (hereinafter referred to as “Seller”), hereby grants, bargains, sells, assigns, transfers, and conveys unto Atmos Energy Corporation, 5420 LBJ Frwy, Suite 1800, Dallas, Texas 75240, a Texas and Virginia corporation (hereinafter referred to as “Buyer”), its successors and assigns, all of Seller’s right, title, and interest to and in the following, all of which is collectively referred to hereafter as the “Property”: (a) that equipment and those facilities described in Attachment “1,” located on that property described, configured and situated along the route described in Attachment “2,” all such attachments being a part hereof; and (b) all easements and permits related to the equipment and facilities set forth above, as described in Attachment “4,” being a part hereof Seller warrants that it is the lawful owner in every respect of the Property, and that the new pipeline is free and clear of all liens, security agreements, encumbrances, claims, demands, and charges of every kind whatsoever. Seller further warrants that it is not aware of any existing violations of any law, ordinance, or regulation relating to the Property, or of any latent or patent defects in the Property. TO HAVE AND TO HOLD unto the said Buyer, its successors and assigns forever, to warrant and defend the title to the Property against every person whomsoever lawfully claiming the Property or any part of it. Seller further agrees to execute and deliver any and all further conveyances, assignments, bills of sale, certificates, instruments of transfer, or other documents that may be necessary or appropriate to effectuate the terms hereof, and the terms of that certain Work Assignment Supplement between Buyer, Seller, and dated , and to vest in Buyer, its heirs, representatives, successors, and assigns, title to the Property. IN WITNESS WHEREOF, this Bill of Sale and Assignment is executed on the day of , 200_. Atmos Energy Corporation By: By: Title: Title: QUOTE - Gas Infrastructure DATE:09/22/08  ïòØÜÑÄ TO:Alex Fisher ñØÆÔÊÇÔÑÑØéå  The Fain Group    íÕÎÏØ Location:Rolling Oaks Memorial Center    ÷ÜÅ Coppell,TX UNITTOTAL ITEM/DESCRIPTIONQTYUNITPRICEESTIMATE 1lots11,500.00$ Install Atmos infrastructure in project : $ 11,500.00 includes all labor,material,sandbackfill and equipment to required to install per Atmos design dated : 09-05- 08 - (950) l.f.2" poly by open cut along Ruby Rd. - (40) l.f. 2" by directional bore along Ruby Rd beside the existing fence - install 1 - 1 1/4" SL Riser w/ stop & plug -testing,bends,tees,test stations,caps,collars,signs,tracer wire,and marker tape $ 11,500.00 TOTAL NOTES: We will require 4 working days to complete the gas infrastructure. We will bill for the entire amount of the above quote upon completion of work, since Atmos accepts responsibility for the new infrastructure it is assumed that no retainage will be held from this billing . It is assumed that staking and density testing, if required, will be paid by others and any spoils will be placed on site. ( Quote Good for 30 days ) óÎØõÔÑÑ Signature9/22/2008 Joe HillDate