Loading...
Rolling Oaks MC-CS090120Page 1 of 1 Michael Garza - FW: Schedule Updates From: "Ken Baxter" <kbaxter( ',j starchitects.com> To: "Michael Garza" <mgarzagci.coppell.tx.us >, <lfsloanegaol.com >, <cphillipgci.coppell.tx.us >, "Tom Omick" <tomickgci.coppell.tx.us >, <b shake gstei.com >, "Brown, Julian W." <JWBrowngstei.com >, "Barry Boudreaux" <bboudreauxgj starchitects.com >, "John Gary" <JGarygj starchitects.com> Date: 1/20/2009 8: 10 AM Subject: FW: Schedule Updates Attachments: December update.pdf Ken Baxter Senior Project Manager J. Stuart Todd, Inc. Architecture /Interiors /Planning 2919 Welborn Dallas, Texas 75219 214 - 522 -4033 214 - 522 -7988 fx. From: Jason Copes [mailto:JCopes @faingp.com] Sent: Monday, January 19, 2009 4:48 PM To: Ken Baxter Subject: Schedule Updates Ken, Attached are the December updates for both projects and a 2 week look ahead for Restland Funeral Home. Can forward these to Restland after you review? Jason file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \49758712City_of... 4/7/2010 Act Orig Rem Early 00: 2009 ID Description Dur Dur Start Early Finish % DEC JAN FEB MAR APR MAY 0: 15 22 29 05 12 19 26 02 09 16 23 02 09 16 23 30 06 13 20 27 04 11 18 BUILDING 15401.1 Plumbing Underground rough in 4 0 08DEC08 A 12DEC08 A 100 =Plumbing Underground rough in 3100 Foundation Forms 4 0 15DEC08 A 18DEC08 A 100 W Foundation Forms 16000.1 Electrical Underslab rough in 10 0 15DEC08 A 29DEC08 A 100 i ® Electrical Underslab rough in 2281 Termite Treatment 1 0 2 3DEC08 A 23 DEC08 A 100 1 Termite Treatment e 1 Foundation Place and Finish Wood Framing 3300.2 Foundation Place and Finish 1 0 31 DEC08 A 31 DEC08 A 100 6100 Wood Framing 15 8 09JAN09 A 29JAN09 45 11780.1 Crematory Retort Delivery 35 35 19JAN09 06MAR09 0 Crematory Retort Delivery 4210 Masonry 20 20 29JAN09 26FEB09 0 Masonry 15400.2 Plumbing in wall rough in 5 5 29JAN09 05FEB09 0 O Plumbing in wall rough in 15500.1 Fire Sprinkler Rough in 5 5 29JAN09 05FEB09 0 O Fire Sprinkler Rough in 0 Electrical Rough in ' D HVAC Rough in = Roofing 0 Exterior Doors 0 Fireplace 16000.2 Electrical Rough in 5 5 29JAN09 05FEB09 0 15000.1 HVAC Rough in 5 5 02FEB09 09FEB09 0 7550 Roofing 5 5 23FEB09 02MAR09 0 8110 Exterior Doors 1 1 26FEB09 27FEB09 0 10303 Fireplace 1 1 26FEB09 27FEB09 0 7631 Gutters and Downspouts 1 1 02MAR09 03MAR09 0 D Gutters and Downspouts 8800.1 Windows 2 2 02MAR09 04MAR09 0 F Windows 9250.1 Hang Drywall 4 4 04MAR09 10MAR09 0 O Hang Drywall 11780.2 Crematory Retort Installed 1 1 09MAR09 09MAR09 0 o Crematory Retort Installed =1 Insulation 7200 Insulation 3 3 10MAR09 13MAR09 0 9250.2 Drywall - Tape /Bed/Texture /Prime paint 7 7 10MAR09 19MAR09 0 D Drywall - Tape /Bed/Texture /Prime 6200.1 Interior wood trim 10 10 19MAR09 02APR09 0 Interior wood trim 8800.2 Interior Glass and Mirrors 1 9 1 9 19MAR09 25MAR09 20MAR09 07APR09 0 0 El Interior Glass and Mirrors D Paint 9900 Paint 6200.2 Cabinets 1 1 26MAR09 27MAR09 0 0 Cabinets 3366 Stained Concrete 5 5 01APR09 08APR09 0 O Stained Concrete Ceramic Tile O Carpet D Signage 9300 Ceramic Tile 10 10 01APR09 15APR09 0 9680 Carpet 2 2 01APR09 03APR09 0 10400 Signage 1 1 07APR09 08APR09 0 16750 Low Voltage Wiring - By Owne 2 2 07APR09 09APR09 0 O Low Voltage Wiring - B 15000.2 HVAC Trim 3 3 07APR09 10APR09 0 O HVAC Trim 0 Fire Sprinkler Trim =1 Electrical Trim = Plumbing Trim 15500.2 Fire Sprinkler Trim 2 2 07APR09 09APR09 0 16000.3 Electrical Trim 3 3 07APR09 10APR09 0 15400.3 Plumbing Trim I 3 3 15APR09 20APR09 1 0 Start date 13DEC08 RESTLAND FUNERAL HOME Early bar Finish date 01MAY09 THE FAIN GROUP Progress bar Critical bar Summary bar Data date 19JAN09 Run date 19JAN09 Page number 1A December Update p Start milestone point Q Finish milestone point © Primavera Systems, Inc. Act ID ., 5120.1 Description 7 77 Pavilion structure delivery ' Dur 15 Dur 8 Start 15DEC08 A Finish 28JAN09 50 00: DEC JAN 0: 15 22 29 05 12 2009 FEB MAR 19 26 02 0• 16 23 02 09 16 23 1 Pavilion structure delivery D Pavilion steel structure Pavilion lumber frame D Pavilion HVAC Rough In Pavilion masonry O Pavilion standing seam roof D Pavilion plumbing top out O Pavilion Electrical Rough I Pavilion skylight Pavilion HVAC trim O Pavilion Plumbing tri O Pavilion Electrical tri O Pavilion stained concret O Pavilion metal doors O Pavilion hardware D Pavilion ceramic tile 0 Pavilion signage O Pavilion stain cedar Pavilion granite co D Pavilion powery 5120.2 Pavilion steel structure 5 5 28JAN09 04FEB09 0 6100.1 Pavilion lumber frame 5 5 04FEB09 11 FEB09 0 15000.1 Pavilion HVAC Rough In 5 5 11 FEB09 18FEB09 0 4100.3 Pavilion masonry 10 10 11FEB09 25FEB09 0 7550.1 Pavilion standing seam roof 5 5 11 FEB09 18FEB09 0 15400.2 Pavilion plumbing top out 5 5 18FEB09 25FEB09 0 16000.2 Pavilion Electrical Rough In 5 5 18FEB09 25FE609 0 7810.1 Pavilion skylight 5 5 18FEB09 25FEB09 0 15830 Pavilion HVAC trim 5 5 25FEB09 04MAR09 0 15450.1 Pavilion Plumbing trim 5 5 25FEB09 04MAR09 0 16000.3 Pavilion Electrical trim 5 5 25FEB09 04MAR09 0 3100.12 Pavilion stained concrete 2 2 25FEB09 27FEB09 0 8110.1 Pavilion metal doors 1 1 25FEB09 26FEB09 0 8700.1 Pavilion hardware 1 1 25FEB09 26FEB09 0 9300.1 Pavilion ceramic tile 5 5 25FEEM 04MAR09 0 8700.3 Pavilion signage 1 1 26FEB09 27FEB09 0 9900.1 Pavilion stain cedar 3 3 26FEB09 03MAR09 0 4455.1 Pavilion granite countertop 2 2 04MAR09 06MAR09 0 1710.1 Pavilion powerwash and cleaning 2 2 06MAR09 10MAR09 0 15000.2 Columbarium HVAC rough in 5 0 15DEC08 A 19DEC08 A 100 ® Columbarium HVAC rough in 1 ® Columbarium Electrical rough in 16000.4 Columbarium Electrical rough in 5 0 15DEC08 A 19DEC08 A 100 Start date 13DEC08 ROLLING OAKS MEMORIAL CENTER THE FAIN GROUP December Update Early bar Q Target start point p Target finish point Target bar ® Progress bar Critical bar Summary bar p Start milestone point 0 Finish milestone point Finish date 10MAR09 Data date 19JAN09 Run date 19JAN09 Page number 1A © Primavera Systems, Inc. Act ID 8410 Description Columbarium windows Orig Dur 5 Rern Dur 0 Early Start 19DEC08 A Early Finish 30D 08 A % 100 2008 2009 DEC JAN FEB MAR 0: 15 22 29 05 12 19 26 02 09 16 23 02 09 16 23 3 ® Columbarium windows O Columbarium plumbing top out Columbarium masonry ' ® Columbarium ' standing seam roof Columbarium ext. metal doors Columbarium gutters Columbarium ext. granite panels om Columbarium skylight ® Columbarium insulation walls o Columbarium hardware O Columbarium paint exterior mm Columbarium drywall Columbarium paint/tape bed and texture O Columbarium millwork Columbarium int. columns Columbarium niches O Columbarium HVAC trim O Columbarium Electrical Trim 0 Columbarium ceiling insulation Columbarium waterfall feature Em Columbarium ceramic the Columbarium epoxy paint floors D Columbarium Plumbing trim 15400.3 Columbarium plumbing top out 3 0 22DEC08 A 31 DEC08 A 100 4100.4 Columbarium masonry 7 5 29DEC08 A 23JAN09 30 7550.2 Columbarium standing seam roof 7 0 05JAN09 A 15JAN09 A 100 8110.2 Columbarium ext. metal doors 2 0 14JAN09 A 14JAN09 A 100 7631 Columbarium gutters 2 2 19JAN09 20JAN09 0 4455.2 Columbarium ext. granite panels 5 5 19JAN09 23JAN09 0 7810.2 Columbarium skylight 5 5 19JAN09 A 23JAN09 10 7200.1 Columbarium insulation walls 1 1 26JAN09 26JAN09 0 8700.2 Columbarium hardware 1 1 26JAN09 26JAN09 0 9900.3 Columbarium paint exterior 5 5 26JAN09 30JAN09 0 9250 Columbarium drywall 2 2 27JAN09 28JAN09 0 9900.2 Columbarium paint/tape bed and texture 4 4 29JAN09 03FEB09 0 6200 Columbarium millwork 7 7 04FEB09 12FE1309 0 9290 Columbarium int. columns 3 3 04FEB09 06FEB09 0 10551 Columbarium niches 5 5 04FEB09 10FEB09 0 15000.3 Columbarium HVAC trim 4 4 04FEB09 09FEB09 0 16000.5 Columbarium Electrical Trim 4 4 04FEB09 09FEB09 0 7200.2 Columbarium ceiling insulation 1 1 04FEB09 04FEB09 0 11015 Columbarium waterfall feature 3 3 09FEB09 11 FEB09 0 9300.2 Columbarium ceramic tile 2 2 11 FEB09 12FEB09 0 9900.5 Columbarium epoxy paint floors 3 3 11 FEB09 13FEB09 0 15450.2 Columbarium Plumbing trim 3 3 13FEB09 17FEB09 0 Start date 13DEC08 ROLLING OAKS MEMORIAL CENTER THE FAIN GROUP December Update 0 Early bar p Target start point Q Target finish point OTarget bar ® Progress bar Critical bar Summary bar O Start milestone point O Finish milestone point Finish date 10MAR09 Data date 19JAN09 Run date 19JAN09 Page number 2A © Primavera Systems, Inc. Act ID 4455.3 Description Columbarium granite countertops • Dur 2 - Dur 2 Start 13FE609 Finish 16FEB09 0 00: ,; 15 22 29 05 12 00 19 26 02 0• 16 23 02 09 16 23 1 O Columbarium granite countertops Columbarium final paint Columbarium carpet ®Columbarium cleaning 9900.4 Columbarium final paint 3 3 13FEB09 17FE609 0 9680 Columbarium carpet 2 2 16FEB09 17FEB09 0 1710.2 Columbarium cleaning 1 1 18FE609 18FE609 0 s 2810.2 "Irrigation inlines 5 5 21JAN09 27JAN09 0 O Irrigation Mainlines O PRECONSTRUCTION MEETING Branch lines /Heads and control wiring O Test and Adjust System Landscape 2810.1 PRECONSTRUCTION MEETING 0 0 - 27JAN09 A 100 2810.3 Branch lines /Heads and control wiring 10 10 8JAN09 10FEB09 0 2810.4 Test and Adjust System 5 5 11 FEB09 17FEB09 0 2810.5 Landscape 10 10 18FEB09 03MAR09 0 • 10000 Substantial Completion 0 0 18FE609 0 O Substantial Completion Startup and training O Final Cleanup Punchlist Final Completio 1730 Startup and training 4 4 19FE609 24FEB09 0 1710.3 Final Cleanup 5 5 19FEB09 25FEB09 0 10001 Punchlist 10 10 25FEB09 10MAR09 0 10002 Final Completion 0 0 11 MAR09 10MAR09 0 Start date 13DEC08 ROLLING OAKS MEMORIAL CENTER THE FAIN GROUP December Update Early bar A Target start point 0 Target finish point 0 Target bar ® Progress bar EM Critical bar Summary bar O Start milestone point 0 Finish milestone point Finish date 1OMAR09 Data date 19JAN09 Run date 19JAN09 Page number 3A © Primavera Systems, Inc.