Loading...
SS9301-CS 930212 (2) : '~._,1/:"-+ ...,< ..-.----'.-:--~-~'L_..:--'. ,t=.'-~/.---~ , .... ;/ /~_..,,._~;_.:,. ~. ?_.~ ..... ,:.._. .... /:_.:~ ~ ~.o. Bo~ 4~ /~/ i~ The City With A Beaut,ful Future Coppell. Texas 75019 February 12, 1993 Mr. Pete Smith Nichols, Jackson, Kirk & Dillard 1800 Lincoln Plaza 500 N. Akard St. Dallas, TX 75201 Dear Pete: Enclosed with this letter please find copies of an Encroachment on Easement and an Easement of Right-of-Way from TU Electric. These easements are necessary tbr the construction of a portion of the Grapevine Creek Sewer Trunk Main. That project is scheduled to begin sometime in late March or early April. The project was awarded by Council on December 8, 1992. If you have no problems with the wording in the easements from TU, please convey that information back to me and at that point I will obtain the Mayor's signature on the originals. If you have any questions, please contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. City Engineer