Loading...
Rolling Oaks MC-CS090416Page 1 of 1 Michael Garza - Rolling Oaks Memorial Center: Columbarium Punch List From: "Ken Baxter" <kbaxter(�,J starchitects.com> To: <j cope s(�'.&hefaincompany.com> Date: 4/16/2009 7:57 AM Subject: Rolling Oaks Memorial Center: Columbarium Punch List CC: "Tom Omick" <tomickgci.coppell.tx.us >, "Michael Garza" <mgarzagci.coppell.tx.us >, "John Gary" <JGarygj starchitects.com >, "Barry Boudreaux" <bboudreauxgj starchitects.com> Attachments: Punch List 04 15 09.pdf Jason, Attached is the punch list for the Columbarium building at Rolling Oaks Cemetery. Let us know if you have any questions. Thanks, Ken Baxter Senior Project Manager J. Stuart Todd, Inc. Architecture /Interiors /Planning 2919 Welborn Dallas, Texas 75219 214 - 522 -4033 214 - 522 -7988 fx. file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \49E6E4DACity_o... 4/7/2010 ® J. STUART TODD, INC. I r 4 k ARCHITECTURE t o Attendance: INTERIORS PLANNING Rolling Oaks Memorial Center Bob Ki th, AID Columbarium Building P re si d en t reen April 15, 2009 Jahn Gary, AIA Ken Baxter Vice President ). &LlarcTodd,.AIA r �] unchlISt Founder 2919 Welborn t o Attendance: sui[e 101 Dallas, TX 75219 Tel 214 522 -4033 Tom Omick Fax 214 522 -7988 Brian McClain Ken Baxter Building Interior: Entry 002 a. Adjust closer on entry door. b. Replace attachment screws with matching color at storefront. C. Clean storefront frame. Atrium 003 a. Clean niche frames and install glass fronts. b. Clean grout from top of tile base. Niche 004 a. Clean niche frames and install glass fronts. b. Door 002/003: add door bottom C. Door 002: replace deadbolt with lockset AL53PD as required at exit doors. Office 007 a. Clean carpet stain in the northwest corner area. b. Install fire extinguisher cabinet, paint to match wall. Work Room 008 a. Clean carpet stain near toilet entry. b. Remove tape from granite panels. C. Add cabinet door /drawer silencers at all locations. 1 Toilet 009 a. Subject to visual review once lighting has been provided. b. Grout file around door jamb. Conference Room 010 a. Install phone /data/ coverplate. b. Door 004: clean paint from door hinges. G. Jamb molding at floor intersection needs to be replaced. Future 006 a. Clean floors, walls, storefront. Storage/HVAC 005 a. Install timer /contactor panel for cemetery lights /water feature. b. Tape,/bed/paint walls, concrete floors, unfinished conduit, furnace frames. C. Seal all through wall penetrations. d. Install electrical panel door. C. Label/Identify all panel circuits. Building Exterior East Elevation. a. Expose all weep holes to allow drainage. Lower bed prep areas to accommodate. b. Paint exhaust vents in metal soffit to match. C. Add sealant around door jamb/head condition. d. Seal all through wall vents /pipe /refrigerant lines. C. Paint through wall vents to match soffit. e. Install condenser units. South Elevation a. Add sealant around all brick/angle intersections at window jamb/head conditions. b. Clean storefront frames. OJ West Elevation a. Move trees out from under roof overhang. b. Fill/finish concrete next to storefront entry jambs. C. Install soffit light fixture. d. Straighten soft trim around brick columns. e. Straighten/true south entry column beam to brick vertical intersection. South Elevation a. Complete crushed granite walkway. General conditions to be completed at all areas. a. All storefront attachment screws to match color of frame. b. Clean storefront frames. C. Clean/mop tile floors/bases and carpet. d. Add three (3) door silencers on all door frames, e. Paint all exposed roof penetrations (vent pipe, etc.) to match metal roof color. f. Install gutter /downspout system. (include splash blocks). g. Uncover /expose all weep holes. Lower bed areas to accommodate proper drainage. h. Provide HVAC Testing & Balance Report. i. Finalize electrical power supply and review light fixture operations. -End of Punch List- 3