Loading...
ST0701-LR100406CONCRETE COMPRESSIVE STRENGTH TEST REPORT a. ' r 1, racon Report Number: 94091 193.01 16 er Service Date: 04/02/10 8901 Carpenter Frwy. Report Date: 04/06/10 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client Project City of Coppell TX Attn: Keith Marvin PO Box 9478 Coppell, TX 75019 Material Information Specified Strength: 3,600 psi @ 28 days Mix ID: DCCOG501 Supplier: Redi -Mix Batch Time: 0921 Truck No.: 1377 Plant: 259 Ticket No.: 25181083 Field Test Data Test Slump (in): Air Content (' %o): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pct) Result Specification 5 5 -7 1.9 76 74 148.7 Southwestern Boulevard Coppell Road to Grapevine Creek Coppell, TX Project Number: 94091193 Sample Information Sample Date: 04/02/10 Sample Time: 1003 Sampled By: Jose A. Martinez Weather Conditions: Cloudy, windy Accumulative Yards: 6.5 Batch Size (cy): 6.5 Placement Method: Direct Discharge Water Added Before (gal): 10 Water Added After (gal): 0 Sample Location: See Placement Location Placement Location: Drilled Piers, see Foundation (sq in) Observations Report #94091193.0115, Tested dated 04/02/10, for pier locations Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 04/03/10 04/05/10 3 116,460 4,120 2 1 2 6.00 28.27 04/03/10 04/09/10 7 1 3 6.00 28.27 04/03/10 04/30/10 28 1 4 6.00 28.27 04/03/10 04/30/10 28 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: .lose A. Martinez Reported To: Contractor: Lacy Construction Report Distribution: (1) City of' C'oppcll TX (1) City or Coppell TX Reviewed B y : (1) City or Coppell Tx (2) Halff Assoc Inc (1) Lacy Conshuction (1) PacTnist Pacific Realty Associates LP Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. UR0001, 521-0 Rcr.3 Page 1 of 1 Senior Project Manager REPORT OF DRILLED PIERS Ir � Consult(nq Engineers &Scientists 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630 -1010 Project: Southwestern Boulevard Report No.: 94091193.0113 Coppell Road to Grapevine Creek, Coppell, TX Date of Service: 04/01/10 Project No.: 94091193 Technician: J. Martinez Driller: Texas Shafts Page: 1 of 1 Pier Identification B #2 /A B #2 /B B #3 /A B3 #/B Sewer Pier Pier Diameter (in.) 30 30 30 30 18 Top of Ground Elevation (ft.) N/A N/A N/A N/A N/A Top of Pier Elevation (ft.) N/A NIA N/A N/A N/A Depth to Bearing Stratum from Ground (ft.) 6.5 5.0 6.0 5.3 9.0 Depth of Pier from Ground (ft.) 16.5 15.0 16.1 1 15.3 1 15.2 Required Penetration (ft.) 10.0 10.0 10.0 10.0 6.0 Actual Penetration (ft.) 10.0 10.0 10.1 10.0 6.2 Depth from Top of Concrete (ft.) 14.3 12.8 14.5 13.7 15.2 Condition of Bottom (wet or dry) Damp Damp Dry Dry Dry Plumb Within Tolerance (yes or no) yes yes yes yes yes Casing Diameter (in.) 32 32 32 32 26 Cased Depth (ft.) 6.5 5.0 6.0 5.3 9.0 Number of Vertical Bars (ea.) 8 8 8 8 6 Reinforcing Bar Size ( #) 9 9 9 9 1 5 Length of Vertical Bars (ft.) 16.0 16.0 16.0 16.0 19.6 Time Drilling was Completed 9:25 a.m. 10:39 a.m. 1:20 p.m. 2:16 p.m. 3:46 p.m. Time Concrete was Placed 5:15 p.m. 5:30 p.m. 5:47 p.m. 6:11 p.m. 5:00 p.m. Pier Identification A #1 /A A #1 /B Pier Diameter (in.) 24 24 Top of Ground Elevation (ft.) N/A NIA Top of Pier Elevation (ft.) N/A N/A Depth to Bearing Stratum from Ground (ft.) 16.0 15.8 Depth of Pier from Ground (ft.) 24.5 24.4 Required Penetration (ft.) 8.0 8.0 Actual Penetration (ft.) 8.5 8.6 Depth from Top of Concrete (ft.) 24.1 24.0 Condition of Bottom (wet or dry) Dry Damp Plumb Within Tolerance (yes or no) Yes Yes Casing Diameter (in.) NIA N/A Cased Depth (ft.) N/A N/A Number of Vertical Bars (ea.) 8 8 Reinforcing Bar Size ( #) 7 7 Length of Vertical Bars (ft.) 25.5 25.5 Time Drilling was Completed 9:41 a.m. 9:05 a.m. Time Concrete was Placed 10:10 a.m. 10:06 a.m. Irerrecon Consultinq Enaineers & Scientists 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214)630 -1010 Project: Southwestem Boulevard Coppell Road to Grapevine Creek, Coppell, TX Project No.: 94091193 Driller: Texas Shafts Report No.: 94091193.0120 Date of Service: 04/05/10 Technician: J. Martinez Page: 1 of 1 Pier Identification A#4 /B A#4 /A Pier Diameter (in.) 24 24 Top of Ground Elevation (ft.) N/A N/A Top of Pier Elevation (ft.) N/A N/A Depth to Bearing Stratum from Ground (ft.) 14.5 14.7 Depth of Pier from Ground (ft.) 24.7 25.2 Required Penetration (ft.) 8.0 8.0 Actual Penetration (ft.) 10.2 10.5 Depth from Top of Concrete (ft.) 24.6 24.9 Condition of Bottom (wet or dry) Damp Damp Plumb Within Tolerance (yes or no) Yes Yes Casing Diameter (in.) N/A N/A Cased Depth (ft.) N/A N/A Number of Vertical Bars (ea.) 8 8 Reinforcing Bar Size ( #) 7 7 Length of Vertical Bars (ft.) 25.5 25.5 Time Drilling was Completed 8:03 a.m. 8:35 a.m. Time Concrete was Placed 10:43 a.m. 10:58 a.m. REINFORCING STEEL OBSERVATIONS REPORT Report Number: 94091193.0122 "Irerracon Service Date: 04/05/10 8901 Carpenter Frwy. Report Date: 04/07/10 Dallas, TX 75247 214 - 630 -1010 Reg No: F -3272 Client Project City of Coppell TX Southwestern Boulevard Attn: Keith Marvin Coppell Road to Grapevine Creek PO Box 9478 Coppell, TX Coppell, TX 75019 Proiect Number: 94091193 PROJECT DATA Drawings Utilized: Sheet SC1.1 Locations /Items Observed: Colunms A & B on Bent #2 Test Method: Visual Observation ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT " INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type X Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place Mechanical Splices Trash & Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper Cover /Clearance X Discrepancies /Comments: No discrepancies were noted at the time of this observation. Services: Reinforcing steel (rebar) placement observation. Terracon Rep.: Koda W. Shadix Reported To: Terry /Ashlar Contractor: Lacy Construction Report Distribution: (1) City of Coppell Tx (1) City orCuppcll 'I'x (1) Lacy Construction (1) City of Coppell Tx (2) Halff Assoc Inc Reviewed By: (1) PacTrust Pacific Realty Associates LP The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 dgr Senior Project Manager