SS9301-ES 920818 August 18, 1992
Mr. Steve Pratt
248 E. Bethel
Coppell, TX 75019
RE: Grapevine Creek Sewer Main - Permanent Easements
Dear Mr. Pratt:
The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. There is an existing easement along the east
side of your property, however, because of the need to bore in a straight line and reconnect to the existing sanitary sewer
in Grapevine Creek behind your house, the City of Coppell will need an additional easement near the front of your
property. (See attached easement). The City will not be removing the driveway in the easement, but, will only be boring
beneath it.
Your cooperation in working with the City to provide a permanent easement would be greatly appreciated and also would
be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of the permanent easement. The easement should be signed and notarized and returned
to the City of Coppell. The City of Coppell has several notaries on staff and would be happy to notarize this document
free of charge at your request.
If you should have any questions concerning the project, the timing of the project, or any other questions surrounding the
installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in the future, please feel free to
contact me.
Sincerely,
,~nhM. Griffin, P.E.
gineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
~' /~=~ ~ ~:-~~ ~-=_-5:-'-': .... BOX
P.O.
478
(/ /~)/ The City With A Beautiful Future Coppell, Texas 75019
214-462-0022
August 18, 1992
Ms. Ruth Alexander
4820 E. Lee
Tucson, AR 85712
RE: Grapevine Creek Sewer Main - Permanent Easement
Dear Ms. Alexander:
The .City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The sanitary sewer will be installed down
the north side of Bethel Road. In order to get the existing sewer line to Bethel Road, the City will need an easement
along the west side of Denton Tap Road from Grapevine Creek to Bethel Road. The installation of the sewer line in
Bethel Road will allow the Ciw to eliminate the aerial crossings and still preserve the aesthetic value of Grapevine Creek.
Also, the CiW will no longer need the easement through your property adjacent to the creek.
Your cooperation in working with the Cib,.' to provide a permanent easement would be greatly appreciated and also would
be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of the permanent easement. The easement should be signed and notarized and returned
to the Ciw of Coppell. The Cib,,' of Coppell has several notaries on staff and would be happy to notarize this document
free of charge at your request.
If you should have any questions concerning the project, the timing of the project, or any other questions surrounding the
installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in the future, please feel free to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Ci~' Engineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
~/ ,/'~..------~, The City With A Beautiful Future Coppell. Texas 75019
/
August 18, 1992
C & C Leasing
P. O. Box 819026
Dallas, TX 75381
RE: Grapevine Creek Sewer Main - Temporary Construction Easements
Dear Sir:
The Ci~' of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The portion of the installation of the sewer
trunk main adjacent to your property will be in an existing utility easement. However, because of the depth of the sewer
line and thc need to maneuver adjacent to the trench, the City is requesting that a temporaD' construction easement be
granted to the Ci~' for the duration of the project. The temporary construction easement will be utilized to temporarily
stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for
the installation of the new sewer trunk main.
Your cooperation in working with the Ci~: to provide a temporao' construction easement would be greatly appreciated
and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of the temporary,' construction easement. The easement should be signed and notarized
and returned to the City of Coppell. The City.' of Coppeli has several notaries on staff and would be happy to notarize
this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the temporao'
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in thc future, please fecl frec to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
Coppell, Texas 75019
/~-'-~ The City With A Beautiful Future 214-462-0022
August 18, 1992
Mr. Graham Pierce
413 Meadow Creek Road
Coppell, TX 75019
RE: Grapevine Creek Sewer Main - Temporary Construction Easements
Dear Mr. Pierce:
The Ci~' of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction
of a sewer trunk main from Denton Tap Road east~-ard to MacArthur Blvd. The portion of the installation of the sewer
trunk main adjacent to your propert2/will be in an existing utility easement. However, because of the depth of the sewer
line and the need to maneuver adjacent to the trench, the Ciw is requesting that a temporary, construction easement be
granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily
stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for
the installation of the new sewer trunk main.
Your cooperation in working with the City to provide a temporary construction easement would be greatly appreciated
and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of the temporary construction easement. The easement should be signed and notarized
and returned to the Ci.ty of Coppell. The City of Coppeli has several notaries on staff and would be happy to notarize
this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the temporary.
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions ia the future, please feel free to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMG/bd
ce: Steve Goram, Director of Public Works
Alan D. Ratliff, Ci.ty Manager
Coppell. Texas 75019
~/~.,~ The City With A Beautiful Future 214-462-0022
August 18, 1992
Mr. Rick Church
417 Meadow Creek Road
Coppell, TX 75019
RE: Grapevine Creek Sewer Main - Temporary Construction Easements
Dear Mr. Church:
The Ci~: of Coppell is currently in the process of obtaining both permanent and temporary' easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MaeArthur Blvd. The portion of the installation of the sewer
trunk main adjacent to your propert?' will be in an existing utili .ty easement. However, because of the depth of the sewer
line and the need to maneuver adjacent to the trench, the City is requesting that a temporat3~ construction easement be
granted to the CiW for the duration of the project. The temperates' construction easement will be utilized to temporarily
stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for
the installation of the new sewer trunk main.
Your cooperation in working with the City to provide a temporaD.' construction easement would be greatly appreciated
and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of the temporary construction easement. The easement should be signed and notarized
and returned to the City.' of Coppell. The Ci.ty of Coppell has several notaries on staff and would be happy to notarize
this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the temporary
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in the future, please feel free to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
(~ ~ The City With A Beautiful Future 2C~)4p_P4e~i:~_0Te0x2a2s 75019
August 18, 1992
Mrs. Brenda Mcrtz
194 Fairway Drive
Granbury, TX 76049
RE: Grapevine Creek Sewer Main - Temporary Construction Easements
Dear Mrs. Mertz:
The City of Coppell is currently in the process of obtaining both permanent and temporary casements for the construction
of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The portion of the installation of thc sewer
trunk main adjacent to your property will be in an existing utility casement. However, because of thc depth of thc sewer
line and the need to maneuver adjacent to the trench, the City is requesting that a temporary construction easement be
granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily
stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for
the installation of the new sewer trunk main.
Your cooperation in working with the City to provide a temporary construction casement would bc greatly appreciated
and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of the temporary construction easement. The easement should be signed and notarized
and returned to the City of Coppell. The City of Coppell has several notaries on staff and would be happy to notarize
this document free of charge at your request.
If you should have any questions concerning the project, thc timing of the project, what will happen to the temporary
construction easement both during and after construction, or any other questions surrounding thc installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in thc future, please feel frec to
contact mc.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
Coppell, Texas 75019
/~ The City With A Beautiful Future 214-462-0022
August 18, 1992
Mr. Troy Nixon
312 Southwestern Blvd.
Coppell, TX 75019
RE: Grapevine Creek Sewer Main - Temporary Construction Easements
Dear Mr. Nixon:
The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The portion of the installation of the sewer
trunk main adjacent to your property will be in an existing utility easement. However, because of the depth of the sewer
line and the need to maneuver adjacent to the trench, the City, is requesting that a temporary construction easement be
granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily
stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for
the installation of the new sewer trunk main.
Your cooperation in working with the City to provide a temporary construction easement would be greatly appreciated
and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of the temporary construction easement. The easement should be signed and notarized
and returned to the City of Coppeli. The City of Coppell has several notaries on staff and would be happy to notarize
this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the temporary.
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in the future, please feel free to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
Coppell. Texas 75019
The City With A Beautiful Future 214-462-0022
August 18, 1992
Mrs. Alta LaGronc
6308 Woodstream Ct.
Dallas, TX 75240
RE: Grapevine Creek Sewer Main - Temporary Construction Easements
Dear Mrs. LaGrone:
The Ciw of Coppcll is currently in the process of obtaining both permanent and temporary easements for the construction
of a sewer trunk main from Denton Tap Road east~,'ard to MacArthur Blvd. Thc portion of thc installation of the sewer
trunk main adjacent to your property will be in an existing utility casement. However, because of the depth of the sewer
line and the need to maneuver adjacent to the trench, the City is requesting that a temporary construction easement be
granted to the City for the duration of thc project. Thc temporary, construction easement will be utilized to temporarily
stock pile excavated material, to store new materials prior to installation and to maneuver equipment along thc creek for
the installation of the new sewer trunk main.
Your cooperation in working with thc City to provide a temporary construction easement would be greatly appreciated
and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of the temporas~' construction easement. The easement should be signed and notarized
and returned to the City of Coppcli. The City of Coppcll has several notaries on staff and would be happy to notarize
this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to thc temporary
construction easement both during and after construction, or any other questions surrounding thc installation of this sewer
trunk main, please feel free to contact mc at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in thc future, please feel free to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
214-462-0022
The City With A Beautiful Future Coppell,
August 18, 1992
Mr. Daniel Soto
P. O. Box 151
Coppell, TX 75019
RE: Grapevine Creek Sewer Main - Temporary Construction Easements
Dear Mr. Soto:
The CiO' of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The portion of the installation of the sewer
trunk main adjacent to your property will be in an existing utility easement. However, because of the depth of the sewer
line and the need to maneuver adjacent to the trench, the City is requesting that a temporary, construction easement be
granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily
stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for
the installation of the new sewer trunk main.
Your cooperation in working with the CiO' to provide a temporary construction easement would be greatly appreciated
and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of the temporary., construction easement. The easement should be signed and notarized
and returned to thc Cio' of Coppcll. Thc City of Coppell has several notaries on staff and would be happy to notarize
this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the tempora~,'
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in the future, please feel free to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Cio' Engineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
Coppei!. Texas 75019
(~/~__~ The City With A Beautiful Future 214-462-0022
August 18, 1992
Mr. Bill Blades
Baptist Foundation
1601 Elm, Suite 1700
Dallas, TX 75201
RE: Grapevine Creek Sewer Main - Temporary and Permanent Construction Easements
Dear Mr. Blades:
The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The majority of the sanitary sewer will be
installed in the existing easement. However, there is a slight adjustment in the alignment of the sanitary, sewer along the
north side of the railroad track that will require a small permanent easement. Also, because of the depth of the sewer line
and the need to maneuver adjacent to the trench, the City, is requesting that a temporary, construction easement be granted
to the City for the duration of the project. The temporary, construction easement will be utilized to temporarily stock pile
excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the
installation of the new sewer trunk main.
Your cooperation in working with the City to provide both a permanent and a temporary construction easement would
be greatly appreciated and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of both the permanent and the temporary construction easements. The easements should
be signed and notarized and returned to the City of Coppell. The City of Coppeli has several notaries on staff and would
be happy to notarize this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the temporary
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in the future, please feel free to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
",-,e w,,, ^ ,:,.,,,re
August 8, 1992
Mr. Donald Brewer
775 Pelican Lane
Coppell, TX 75019
RE: Grapevine Creek Sewer Main - Temporary and Permanent Construction Easements
Dear Mr. Brewer:
The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction
cfa sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The permanent easement will be further away
from your house than the existing easement. The easement is necessary so the sewer line can be realigned. Because of
the depth of the sewer line and the need to maneuver adjacent to the trench, the City is requesting that a temporary
construction easement be granted to the City for the duration of the project. The temporary construction easement will
be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver
equipment along the creek for the installation of the new sewer trunk main. The temporary easement on your property
consists of just the far corner of your property.
Your cooperation in working with the City' to provide both the permanent and a temporary construction easement would
be greatly appreciated and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a cop>' of both the permanent and the temporary construction easement. The easements should
be signed and notarized and returned to the Ci,ty of Coppeil. The Ci,ty of Coppell has several notaries on staff and would
be happy to notarize this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the temporary
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please fccl free to contact mc at 393-1016 to obtain further information. '~.
Thank you for your consideration of this request and if you should have any questions in thc future, please fccl frcc to
contact mc.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
,/~-~./~ The City With A Beautiful Future CoppelI. Texas 75019
214-462-0022
August 18, 1992
Mr. Don Carter
441 Carter Drive
Coppell, TX 75019
RE: Grapevine Creek Sewer Main - Temporary Construction Easements
Dear Mr. Carter:
The Cid' of Coppell is currently' in the process of obtaining both permanent and temporary, easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. Because of the depth of the sewer line and
the need to maneuver adjacent to the trench, the Cib' is requesting that a temporaD' construction easement be granted to
the City for the duration of the project. The temporary construction easement will be utilized to temporarily stock pile
excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the
installation of the new sewer trunk main. Gabe Favre, with Ginn & Case, Inc., stated that you had expressed an interest
in the soil conditions. With this letter I am providing a copy of the soils report.
Your cooperation in working with the CiW to provide a temporary construction easement would be greatly appreciated
and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of the temporary' construction easement. The easement should be signed and notarized
and returned to the Cit' of Coppell. The Cib' of Coppell has several notaries on staff and would be happy to notarize
this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the temporary
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in the future, please feel free to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Ciw Engineer
KMGPod
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City. Manager
Coppell. Texas 75019
~ The City With A Beautiful Future 214-462-0022
August 18, 1992
First Texas Savings Association
13401 North Freeway
Houston, TX 77060
RE: Grapevine Creek Sewer Main - Temporary and Permanent Construction Easements
Dear Sir:
The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The sewer line is being realigned to the north
side of the railroad tracks. It currently crosses over to the south side west of Mockingbird. Due to the depth, size and
existing utilities in the railroad right-of-way, it is not possible to install the sewer line along the south side of the railroad
tracks. Also, because of the depth of the sewer line and the need to maneuver adjacent to the trench, the City. is
requesting that a temporary construction easement be granted to the City.' for the duration of the project. The temporaL'
construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to
installation and to maneuver equipment along the creek for the installation of the new sewer trunk main.
Your cooperation in working with the Ci~' to provide both the permanent and temporary construction easement would
be greatly appreciated and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of both the permanent and the temporary construction easement. The easements should
be signed and notarized and returned to the City of Coppell. The CiW of Coppell has several notaries on staff and would
be happy to notarize this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the temporary.
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for )'our consideration of this request and if you should have any questions in the future, please feel free to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
Coppeil. Texas 75019
The City With A Beautiful Future 214-462-0022
August 18, 1992
Mr. Glenn Fabian
TU Electric
P. O. Box 819061
Farmers Branch, TX 75381-9061
RE: Grapevine Creek Sewer Main - Temporary and Permanent Construction Easements
Dear Mr. Fabian:
The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The sewer line is being realigned to the north
side of the railroad tracks. It currently crosses over to the south side west of Mockingbird. Due to the depth, size and
existing utilities in the railroad right-of-way, it is not possible to install the sewer line along the south side of the railroad
tracks. Also, because of thc depth of the sewer line and the need to maneuver adjacent to the trench, the City is
requesting that a temporaxy construction easement be granted to the City for the duration of the project. The temporary
construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to
installation and to maneuver equipment along the creek for the installation of the new sewer trunk main.
Your cooperation in working with the CiW to provide both the permanent and temporary construction easement would
be greatly appreciated and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of both the permanent and the temporaD.' construction easement. The easements should
be signed and notarized and returned to the Ci~' of Coppell. The City of Coppell has several notaries on staff and would
be happy to notarize this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the temporary.
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in the future, please feel free to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMGPod
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
( Coppell. Texas 75019
The City With A Beautiful Future 214-462-0022
August 18, 1992
Mr. Steve Parsons
102 Meadowcreek Road
Coppell, TX 75019
RE: Grapevine Creek Sewer Main - Temporary and Permanent Construction Easements
Dear Mr. Parsons:
The City of Coppeil is currently in the process of obtaining both permanent and temporao.' easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MaeArthur Blvd. The sewer line is being realigned to the north
side of the railroad tracks. It currently crosses over to the south side west of Mockingbird. Due to the depth, size and
existing utilities in the railroad right-of-way, it is not possible to install the sewer line along the south side of the railroad
tracks. Also, because of the depth of the sewer line and the need to maneuver adjacent to the trench, the City is
requesting that a temporat3, construction easement be granted to the CiW for the duration of the project. The temporary
construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to
installation and to maneuver equipment along the creek for the installation of the new sewer trunk main.
Your cooperation in working with the City to provide both the permanent and te. mpora_ry- construction easement would
be greatly appreciated and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of both the permanent and the temporaD,' construction easement. The easements should
be signed and notarized and returned to the City of Coppell. The City of Coppell has several notaries on staff and would
be happy to notarize this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the temperates'
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in the future, please feel free to
contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager