Loading...
SS9301-ES 920818 August 18, 1992 Mr. Steve Pratt 248 E. Bethel Coppell, TX 75019 RE: Grapevine Creek Sewer Main - Permanent Easements Dear Mr. Pratt: The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. There is an existing easement along the east side of your property, however, because of the need to bore in a straight line and reconnect to the existing sanitary sewer in Grapevine Creek behind your house, the City of Coppell will need an additional easement near the front of your property. (See attached easement). The City will not be removing the driveway in the easement, but, will only be boring beneath it. Your cooperation in working with the City to provide a permanent easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of the permanent easement. The easement should be signed and notarized and returned to the City of Coppell. The City of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in the future, please feel free to contact me. Sincerely, ,~nhM. Griffin, P.E. gineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager ~' /~=~ ~ ~:-~~ ~-=_-5:-'-': .... BOX P.O. 478 (/ /~)/ The City With A Beautiful Future Coppell, Texas 75019 214-462-0022 August 18, 1992 Ms. Ruth Alexander 4820 E. Lee Tucson, AR 85712 RE: Grapevine Creek Sewer Main - Permanent Easement Dear Ms. Alexander: The .City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The sanitary sewer will be installed down the north side of Bethel Road. In order to get the existing sewer line to Bethel Road, the City will need an easement along the west side of Denton Tap Road from Grapevine Creek to Bethel Road. The installation of the sewer line in Bethel Road will allow the Ciw to eliminate the aerial crossings and still preserve the aesthetic value of Grapevine Creek. Also, the CiW will no longer need the easement through your property adjacent to the creek. Your cooperation in working with the Cib,.' to provide a permanent easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of the permanent easement. The easement should be signed and notarized and returned to the Ciw of Coppell. The Cib,,' of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in the future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. Ci~' Engineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager ~/ ,/'~..------~, The City With A Beautiful Future Coppell. Texas 75019 / August 18, 1992 C & C Leasing P. O. Box 819026 Dallas, TX 75381 RE: Grapevine Creek Sewer Main - Temporary Construction Easements Dear Sir: The Ci~' of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The portion of the installation of the sewer trunk main adjacent to your property will be in an existing utility easement. However, because of the depth of the sewer line and thc need to maneuver adjacent to the trench, the City is requesting that a temporaD' construction easement be granted to the Ci~' for the duration of the project. The temporary construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Your cooperation in working with the Ci~: to provide a temporao' construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of the temporary,' construction easement. The easement should be signed and notarized and returned to the City of Coppell. The City.' of Coppeli has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the temporao' construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in thc future, please fecl frec to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager Coppell, Texas 75019  /~-'-~ The City With A Beautiful Future 214-462-0022 August 18, 1992 Mr. Graham Pierce 413 Meadow Creek Road Coppell, TX 75019 RE: Grapevine Creek Sewer Main - Temporary Construction Easements Dear Mr. Pierce: The Ci~' of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction of a sewer trunk main from Denton Tap Road east~-ard to MacArthur Blvd. The portion of the installation of the sewer trunk main adjacent to your propert2/will be in an existing utility easement. However, because of the depth of the sewer line and the need to maneuver adjacent to the trench, the Ciw is requesting that a temporary, construction easement be granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Your cooperation in working with the City to provide a temporary construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of the temporary construction easement. The easement should be signed and notarized and returned to the Ci.ty of Coppell. The City of Coppeli has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the temporary. construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions ia the future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd ce: Steve Goram, Director of Public Works Alan D. Ratliff, Ci.ty Manager Coppell. Texas 75019 ~/~.,~ The City With A Beautiful Future 214-462-0022 August 18, 1992 Mr. Rick Church 417 Meadow Creek Road Coppell, TX 75019 RE: Grapevine Creek Sewer Main - Temporary Construction Easements Dear Mr. Church: The Ci~: of Coppell is currently in the process of obtaining both permanent and temporary' easements for the construction of a sewer trunk main from Denton Tap Road eastward to MaeArthur Blvd. The portion of the installation of the sewer trunk main adjacent to your propert?' will be in an existing utili .ty easement. However, because of the depth of the sewer line and the need to maneuver adjacent to the trench, the City is requesting that a temporat3~ construction easement be granted to the CiW for the duration of the project. The temperates' construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Your cooperation in working with the City to provide a temporaD.' construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of the temporary construction easement. The easement should be signed and notarized and returned to the City.' of Coppell. The Ci.ty of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the temporary construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in the future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager (~ ~ The City With A Beautiful Future 2C~)4p_P4e~i:~_0Te0x2a2s 75019 August 18, 1992 Mrs. Brenda Mcrtz 194 Fairway Drive Granbury, TX 76049 RE: Grapevine Creek Sewer Main - Temporary Construction Easements Dear Mrs. Mertz: The City of Coppell is currently in the process of obtaining both permanent and temporary casements for the construction of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The portion of the installation of thc sewer trunk main adjacent to your property will be in an existing utility casement. However, because of thc depth of thc sewer line and the need to maneuver adjacent to the trench, the City is requesting that a temporary construction easement be granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Your cooperation in working with the City to provide a temporary construction casement would bc greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of the temporary construction easement. The easement should be signed and notarized and returned to the City of Coppell. The City of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, thc timing of the project, what will happen to the temporary construction easement both during and after construction, or any other questions surrounding thc installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in thc future, please feel frec to contact mc. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager Coppell, Texas 75019  /~ The City With A Beautiful Future 214-462-0022 August 18, 1992 Mr. Troy Nixon 312 Southwestern Blvd. Coppell, TX 75019 RE: Grapevine Creek Sewer Main - Temporary Construction Easements Dear Mr. Nixon: The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The portion of the installation of the sewer trunk main adjacent to your property will be in an existing utility easement. However, because of the depth of the sewer line and the need to maneuver adjacent to the trench, the City, is requesting that a temporary construction easement be granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Your cooperation in working with the City to provide a temporary construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of the temporary construction easement. The easement should be signed and notarized and returned to the City of Coppeli. The City of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the temporary. construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in the future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager Coppell. Texas 75019 The City With A Beautiful Future 214-462-0022 August 18, 1992 Mrs. Alta LaGronc 6308 Woodstream Ct. Dallas, TX 75240 RE: Grapevine Creek Sewer Main - Temporary Construction Easements Dear Mrs. LaGrone: The Ciw of Coppcll is currently in the process of obtaining both permanent and temporary easements for the construction of a sewer trunk main from Denton Tap Road east~,'ard to MacArthur Blvd. Thc portion of thc installation of the sewer trunk main adjacent to your property will be in an existing utility casement. However, because of the depth of the sewer line and the need to maneuver adjacent to the trench, the City is requesting that a temporary construction easement be granted to the City for the duration of thc project. Thc temporary, construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along thc creek for the installation of the new sewer trunk main. Your cooperation in working with thc City to provide a temporary construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of the temporas~' construction easement. The easement should be signed and notarized and returned to the City of Coppcli. The City of Coppcll has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to thc temporary construction easement both during and after construction, or any other questions surrounding thc installation of this sewer trunk main, please feel free to contact mc at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in thc future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager  214-462-0022  The City With A Beautiful Future Coppell, August 18, 1992 Mr. Daniel Soto P. O. Box 151 Coppell, TX 75019 RE: Grapevine Creek Sewer Main - Temporary Construction Easements Dear Mr. Soto: The CiO' of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The portion of the installation of the sewer trunk main adjacent to your property will be in an existing utility easement. However, because of the depth of the sewer line and the need to maneuver adjacent to the trench, the City is requesting that a temporary, construction easement be granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Your cooperation in working with the CiO' to provide a temporary construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of the temporary., construction easement. The easement should be signed and notarized and returned to thc Cio' of Coppcll. Thc City of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the tempora~,' construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in the future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. Cio' Engineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager Coppei!. Texas 75019 (~/~__~ The City With A Beautiful Future 214-462-0022 August 18, 1992 Mr. Bill Blades Baptist Foundation 1601 Elm, Suite 1700 Dallas, TX 75201 RE: Grapevine Creek Sewer Main - Temporary and Permanent Construction Easements Dear Mr. Blades: The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The majority of the sanitary sewer will be installed in the existing easement. However, there is a slight adjustment in the alignment of the sanitary, sewer along the north side of the railroad track that will require a small permanent easement. Also, because of the depth of the sewer line and the need to maneuver adjacent to the trench, the City, is requesting that a temporary, construction easement be granted to the City for the duration of the project. The temporary, construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Your cooperation in working with the City to provide both a permanent and a temporary construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of both the permanent and the temporary construction easements. The easements should be signed and notarized and returned to the City of Coppell. The City of Coppeli has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the temporary construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in the future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager ",-,e w,,, ^ ,:,.,,,re August 8, 1992 Mr. Donald Brewer 775 Pelican Lane Coppell, TX 75019 RE: Grapevine Creek Sewer Main - Temporary and Permanent Construction Easements Dear Mr. Brewer: The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction cfa sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The permanent easement will be further away from your house than the existing easement. The easement is necessary so the sewer line can be realigned. Because of the depth of the sewer line and the need to maneuver adjacent to the trench, the City is requesting that a temporary construction easement be granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. The temporary easement on your property consists of just the far corner of your property. Your cooperation in working with the City' to provide both the permanent and a temporary construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a cop>' of both the permanent and the temporary construction easement. The easements should be signed and notarized and returned to the Ci,ty of Coppeil. The Ci,ty of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the temporary construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please fccl free to contact mc at 393-1016 to obtain further information. '~. Thank you for your consideration of this request and if you should have any questions in thc future, please fccl frcc to contact mc. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager ,/~-~./~ The City With A Beautiful Future CoppelI. Texas 75019 214-462-0022 August 18, 1992 Mr. Don Carter 441 Carter Drive Coppell, TX 75019 RE: Grapevine Creek Sewer Main - Temporary Construction Easements Dear Mr. Carter: The Cid' of Coppell is currently' in the process of obtaining both permanent and temporary, easements for the construction of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. Because of the depth of the sewer line and the need to maneuver adjacent to the trench, the Cib' is requesting that a temporaD' construction easement be granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Gabe Favre, with Ginn & Case, Inc., stated that you had expressed an interest in the soil conditions. With this letter I am providing a copy of the soils report. Your cooperation in working with the CiW to provide a temporary construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of the temporary' construction easement. The easement should be signed and notarized and returned to the Cit' of Coppell. The Cib' of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the temporary construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in the future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. Ciw Engineer KMGPod cc: Steve Goram, Director of Public Works Alan D. Ratliff, City. Manager Coppell. Texas 75019 ~ The City With A Beautiful Future 214-462-0022 August 18, 1992 First Texas Savings Association 13401 North Freeway Houston, TX 77060 RE: Grapevine Creek Sewer Main - Temporary and Permanent Construction Easements Dear Sir: The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The sewer line is being realigned to the north side of the railroad tracks. It currently crosses over to the south side west of Mockingbird. Due to the depth, size and existing utilities in the railroad right-of-way, it is not possible to install the sewer line along the south side of the railroad tracks. Also, because of the depth of the sewer line and the need to maneuver adjacent to the trench, the City. is requesting that a temporary construction easement be granted to the City.' for the duration of the project. The temporaL' construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Your cooperation in working with the Ci~' to provide both the permanent and temporary construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of both the permanent and the temporary construction easement. The easements should be signed and notarized and returned to the City of Coppell. The CiW of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the temporary. construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for )'our consideration of this request and if you should have any questions in the future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager Coppeil. Texas 75019 The City With A Beautiful Future 214-462-0022 August 18, 1992 Mr. Glenn Fabian TU Electric P. O. Box 819061 Farmers Branch, TX 75381-9061 RE: Grapevine Creek Sewer Main - Temporary and Permanent Construction Easements Dear Mr. Fabian: The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The sewer line is being realigned to the north side of the railroad tracks. It currently crosses over to the south side west of Mockingbird. Due to the depth, size and existing utilities in the railroad right-of-way, it is not possible to install the sewer line along the south side of the railroad tracks. Also, because of thc depth of the sewer line and the need to maneuver adjacent to the trench, the City is requesting that a temporaxy construction easement be granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Your cooperation in working with the CiW to provide both the permanent and temporary construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of both the permanent and the temporaD.' construction easement. The easements should be signed and notarized and returned to the Ci~' of Coppell. The City of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the temporary. construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in the future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMGPod cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager ( Coppell. Texas 75019  The City With A Beautiful Future 214-462-0022 August 18, 1992 Mr. Steve Parsons 102 Meadowcreek Road Coppell, TX 75019 RE: Grapevine Creek Sewer Main - Temporary and Permanent Construction Easements Dear Mr. Parsons: The City of Coppeil is currently in the process of obtaining both permanent and temporao.' easements for the construction of a sewer trunk main from Denton Tap Road eastward to MaeArthur Blvd. The sewer line is being realigned to the north side of the railroad tracks. It currently crosses over to the south side west of Mockingbird. Due to the depth, size and existing utilities in the railroad right-of-way, it is not possible to install the sewer line along the south side of the railroad tracks. Also, because of the depth of the sewer line and the need to maneuver adjacent to the trench, the City is requesting that a temporat3, construction easement be granted to the CiW for the duration of the project. The temporary construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Your cooperation in working with the City to provide both the permanent and te. mpora_ry- construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of both the permanent and the temporaD,' construction easement. The easements should be signed and notarized and returned to the City of Coppell. The City of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the temperates' construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please feel free to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in the future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: Steve Goram, Director of Public Works Alan D. Ratliff, City Manager