Loading...
MA1001-AG100413AGENDA REQUEST FORM T H E.` 1 T Y. a F DEPT: Engineering COPPELL �` DATE April 13 2010 � k S ITEM #: 16 M WORK SESSION 1:1 CONSENT 0 REGULAR ITEM TYPE RESOLUTION ITEM CAPTION: Consider approval of a Resolution to close Sandy Lake Road at the intersection of Denton Tap Road to a distance of 144 feet west and 316 feet east and reduce Denton Tap Road to one lane northbound and one lane southbound for a period of up to 30 calendar days from the beginning of work on replacement of the brick pavers; providing for a penalty for road closure beyond 30 calendar days; providing for a variable bonus award for completion and road re- opening in less than 30 calendar days; and authorizing the Mayor to sign and execute any necessary documents. GOAL(S): EXECUTIVE SUMMARY: The City is preparing to bid the Denton Tap and Sandy Lake Road brick pavers replacement project. This project will require closure of Sandy Lake Road for reconstruction of the intersection. The Contractor will maintain one lane northbound and one lane southbound on Denton Tap Road. Approval of this item will authorize us to include this information in the bid documents. Staff will be available to answer any questions at the Council meeting. FINANCIAL COMMENTS: RECOMMENDED ACTION: ACTION TAKEN BY COUNCIL: Staff recommends approval of this Resolution. • Lilb, Ball 16:32: 4.15 16:32:46 - 05'00' #Sandy Lake Rd Closure MEMORANDUM TO: Mayor and City Council VIA: Kenneth M. Griffin, P.E., Director of Engineering /Public Works FROM: George Marshall, P.E., Civil Engineer DATE: April 13, 2010 RE: Consider approval of a Resolution to close Sandy Lake Road at the intersection of Denton Tap Road to a distance of 144 feet west and 316 feet east and reduce Denton Tap Road to one lane northbound and one lane southbound for a period of up to 30 calendar days from the beginning of work on replacement of the brick pavers; providing for a penalty for road closure beyond 30 calendar days; providing for a variable bonus award for completion and road re- opening in less than 30 calendar days; and authorizing the Mayor to sign and execute any necessary documents. The engineering department is currently preparing to go out for bids for the reconstruction of the intersection at Sandy Lake Road and Denton Tap Road. This project will include the replacement of the brick pavers within the intersection with concrete pavement. In order to replace this intersection, the road will need to be closed during construction. The engineering department believes that this intersection can be reconstructed within 30 calendar days. The anticipated cost of construction for the intersection is $275,000. We will include an incentive /disincentive within the bid documents specifically related to the road closure. Once the closure begins they will have 30 calendar days to re- establish all lanes of traffic through the intersection. If they are able to open the road to all lanes of traffic in less than 30 calendar days, they will earn a bonus of $3,000 per day. In the event this closure takes longer than 30 calendar days, there will be damages assessed of $3,000 per day. There will be no bonus for completion of the intersection after 30 calendar days. The total incentive payment for contract time shall not exceed $36,000. Closure of this road will cause an inconvenience to the residents and businesses along Sandy Lake Road and Denton Tap Road. We understand this, and believe that providing the incentive /disincentive structure will ensure that it is completed in a timely manner. We spent a significant amount of time considering other alternatives to this road closure, and simply found no cost effective way around it. Approval of this resolution will allow staff to move forward with the process of bidding the brick pavers replacement project from Sandy Lake Road to Denton Tap Road. Staff will be available to answer any questions at the City Council meeting I s '+m s 0 1/2 1 1 INCH = 1 MILE r DENTON TAP & SANDY LAKE BRICK PAVER REPLACEMENT CITY OF COPPELL PROJECT MA 1 0 -0 1 OPPEL: Created on 31 March 2010 by G ... ge.Marshall 1/7 S: \CAD \ln_Design\MA10 -01 DT -SL Brick Paver\dwg \CC Exhibit \MA10 -01 CC EXHIBITS.dwg Created in AutoCAD �A N 4 FROST BANK f { TRUST 7 -11 CONVENIENCE s STORE AREA OF PROPOSED 316 FEET.' P ROAD CLOSURE / • -� :, =� ks'... CHIPOTLE & - MOOYAH BURGERS EXXON MOBIL CONVENIENCE STORE :E fr DENTON TAP & SANDY LAKE BRICK PAVER REPLACEMENT CITY OF CORRELL PROJECT MA 1 O -O 1 AREA OF PROPOSED 0 50 100 ROAD CLOSURE OPPEL L 1 INCH = 100 FEET Created on 31 March 2010 by George.Marshall 2n S:1CAD\In_D.siplMA10 -01 DT -SL Brick P- 111 -0ICC Exhibit\MA10 -01 CC EXHIBITS I- Created in AUtoCAD LLI t Y L •, � • � � SANDY K -RD- LAE • � • , ®� ; L. r LAKE R W W 8 ®\ r� i „ SANDY LAK BE LT LINE RDp CL ., ®.... BEL fir L ° "R _jam T o X91 P ° Lill Z ,K J AL n DENTON TAP SANDY LAKE BRICK PAVER REPLACEMENT CITY OF COPPELL PROJECT • ■ ■ - . I I S �CAD\ln_DesignWA10-01 DT-SL Brick Pave Mwg�CC Exhibit\MA10-01 CC EXH I BlTs.dg Created in AutoCAD I r ° 1. N FL p LEGEND: OPTION 1 PHASE 1 OPTION 1 PHASE 2 0 25 50 1 INCH= 50 FEET DENTON TAP & SANDY LAKE BRICK PAVER REPLACEMENT CITY OF COPPELL PROJECT MA 1 0 -0 1 OPPEI -: Created or 31 March 2010 by George Marshall S: \CAD \ln_Design\MA10 -01 DT -SL Brick Paver\dwg \CC Exhibit \MA10 -01 CC EXH I BITS.dwg 5n Created in AutoCAD EX. ROW i a� S LEAVE EXISTING BRICK PAVERS IN BFR ONLY FIBE � � VAULT — GAS v ° a �I�I�I �„ - ill . • • m z_ SIGNAL• PVC �' v p p D CONCRETE PER Cl T v ' STD. STREET HEADER p v W/ EXPANSION JOINT APROX. 35 LF p• M NH TP 24 ' \ WTR 24 24 p ° v t, 'v� WTR.124o WTR �4 \ ° a •• ® 4 00 O. FUTURE BC SEE + ° a• p . a W. SANDY LAKE PLANS d O - p ° ° - EX. BC ° INSTALL + STAMPED + :p INSTALL STD. CONCRETE p ° PER DETAIL - a ° p v V cn. ° CONCRETE PER CITY a STD. STREET HEADER DETAIL 2185 70•• v W/ EXPANSION JOINT + ++ o - v .. v • • v' • . • v � APROX. 47 LF CL + INSTALL 5' RING OF STAMPED CONCRETE °• ° p ° ° o p + + RED CLAY - BOMANITE INTEGRAL COLOR o D • d o z + + + + WITH BOMANITE NATURAL GRAY RELEASE • ° + + OR AN APPROVED EAQUAL. THE PATTERN o pv p v + + WILL BE RUNNING BOND USED BRICK ° v ++ INSTALL 10' RING OF STAMPED CONCRETE ++ GUNMETAL GRAY - BOMANITE INTEGRAL FUTURE PVMT SEE ST + + COLOR WITH COBBLESTONE GRAY RELEASE OR AN APPROVED EAQUAL. THE PATTERN ° - WILL BE RUNNING BOND USED BRICK 'v SANDY LAKE SAS + INSTALL 5' RING OF STAMPED CONCRETE °- + RED CLAY - BOMANITE INTEGRAL COLOR a° p 4.00' q ° + WITH BOMANITE NATURAL GRAY RELEASE p ++ OR AN APPROVED EAQUAL. THE PATTERN - a . + WILL BE RUNNING BOND USED BRICK - 11.73 + + + _ v. ;gip ° + + + + ++ STD. STREET HEADEF ++ W/ EXPANSION JOIN' `rJ + + INSTALL STAMPED CONCRETE STAR °• ° p - o d APROX. 33 LF u + GUNMETAL GRAY - BOMANITE INTEGRAL 7 ++ COLOR WITH COBBLESTONE GRAY RELEASE E1 D p ° fl + + OR AN APPROVED EAQUAL. THE PATTERN ° v ° INSTALL STAMPED Q ++ WILL BE RUNNING BOND USED BRICK -" p. .. q- vp CONCRETE PER CITY p H + + + + ° a vq ° ° . ;° 2185 c + ++ ° DETAIL 8 — WTR !3 �TR + v V v 8 — p v + + ++ STREET HEADER o . V VAULTS INSTALL ASPHALT OVER ORIGINAL CONCRETE. + + + ° STD. W/ EXPANSION JOINT REPAIR AS SEEN NECESSARY AFTER PAVER REMOVAL. QUANTITIES TO BE VERIFIED. + + + EL APROX. 92 LF L + + ° :v p ° vp - ° GAS 4 + + + INSTALL STAMPED ° + + + + ++ CONCRETE PER CITY • ° q p v ° p- 'v EX. BC ° ° DETAIL 2185 + ° INSTALL BARRIER 4 FUTURE BC SEE v FREE RAMP d . SANDY LAKE PLANS ° L ' STD. STREET HEADER .;'• ;..•' _ W/ EXPANSION JOINT p APROX. 33 LF a STD. STREET HEADER ° e ` W/ EXPANSION JOINT LEAVE EXISTING v APROX. 44 LF BRICK PAVERS v V IN BFR ONLY EX. ROW a� S LEAVE EXISTING BRICK PAVERS IN BFR ONLY FIBE VAULT — GAS IFO T 24 V WTR 24 V � FUTURE BC SEE + + W. SANDY LAKE PLANS + + EX. BC + + + + . + + ++ a INSTALL STAMP CONCRETE PER Cl DETAIL 21 + + + + +c + + + FUTURE PVMT + + SEE ST + + + . = t Y LAKE + + + ++ + ++ + + s s + + U + + + t t t J t + + Q + + + + t t r + + + + + + 8 — WTR !3 + + + VAULTS INSTALL ASPHALT OVER ORIGINAL CONCRETE. + + + + + REPAIR AS SEEN NECESSARY AFTER PAVER REMOVAL. QUANTITIES TO BE VERIFIED. + + t + ++ +s+ + + + + GAS 4 + + + EX. BC FUTURE BC SEE . SANDY LAKE PLANS V L BRICK PAVERS IN BFR ONLY n_ — RESOLUTION NO. 2010— o4 1 3 • I A RESOLUTION TO CLOSE SANDY LAKE ROAD AT THE INTERSECTION OF DENTON TAP ROAD TO A DISTANCE OF 144 FEET WEST AND 316 FEET EAST AND REDUCE DENTON TAP ROAD TO ONE LANE NORTHBOUND AND ONE LANE SOUTHBOUND FOR A PERIOD OF UP TO 30 CALENDAR DAYS FROM THE BEGINNING OF WORK ON REPLACEMENT OF THE BRICK PAVERS; PROVIDING FOR A PENALTY FOR ROAD CLOSURE BEYOND 30 CALENDAR DAYS; PROVIDING FOR A VARIABLE BONUS AWARD FOR COMPLETION AND ROAD RE- OPENING IN LESS THAN 30 CALENDAR DAYS; AND AUTHORIZING THE MAYOR TO SIGN AND EXECUTE ANY NECESSARY DOCUMENTS; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, Sandy Lake Road at the intersection of Denton Tap Road is planned to undergo reconstruction in the near future; and WHEREAS, during the period of said reconstruction, traffic on the street and intersection will be severely impaired; and WHEREAS, reconstruction of the intersection within the existing right -of -way requires closure of Sandy Lake Road at the intersection of Denton Tap Road; and WHEREAS, the Contractor shall maintain one lane northbound and one lane southbound of Denton Tap Road; and WHEREAS, after consideration the City Council has determined that it would be in the best interest of the City and its citizens to provide for a more expedient and safer reconstruction process by permitting the temporary closure of this portion of Sandy Lake Road at the intersection of Denton Tap Road during the period of reconstruction; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS: SECTION 1. That the City Manager or designee is hereby authorized to undertake the necessary steps to close Sandy Lake Road to through traffic at its intersection with Denton Tap Road eastward for a distance of 316 feet and westward for a distance of 144 feet for a period of 30 calendar days. 1 SECTION 2. That the Contractor is authorized and directed to cause the erection of signs and official traffic control devices as is necessary and to give notice of alternate routes of travel as provided herein. SECTION 3. That this Resolution shall take effect immediately from and after its passage as the law and charter in such cases provide. DULY PASSED by the City Council of the City of Coppell, Texas, this the /3L- of 1-010. APPROVED: JAY PE ERS, MAYOR ATTEST: �Ll Y ALL, — - C AS TO ROBERT E. HAGEW, (ATY ATTORNEY