Loading...
Rolling Oaks MC-CS090710 (2)MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Brad Reid, Director of Parks and Recreations From: Michael Garza, E.I.T., Graduate Engineer_ Date: 7/10/2009 RE: Rolling Oaks Memorial Center- 400 S. Freeport Parkway The substantial completion certificate has been submitted by the Fain Group and J. Stuart Todd. There are still some minor punch list items from Tom Omick and Lee Stone still outstanding. There are 2 major outstanding punch list items: 1.) The drainage issue around the buildings, the contractor suggests using a flat rock instead of mulch. This may continue to be a problem in the future. I believe the best solution would be to install grate inlets around the building tied into the storm drain that runs to the pond to the east. 2.) The ADA accessibility routes in non - compliance need to be addressed. Attached with this memo is correspondence regarding punch list items from the various departments and 3 copies of the substantial completion for your review. If you would like to discuss this further please contact me at your convenience. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"