Loading...
ST0502B-EM1002195? 05 o2- B rep ublic p FREEPORT PARKWAY EXTENSION Coppell, Texas Project Budget 2/19/2010 ROAD DESIGN Survey Pacheco Topo Survey $ 10,000.00 Pacheco Tree Survey 10,000.00 Preliminary Plat 5,000.00 Final Plat 5,000.00 Engineering Services �6O � 0, 000.00 Concept Plans 5,000.00 Roadway Plans 90,000.00 Const. Phase Services Construction Administration 5,000.00 Engineering Special Services Record Drawings 1,500.00 Quality Assurance Road Geo 4,000.00 Rone Material Testing 15,217.50 Reimbursables 25,000.00 Design Subtotal 175,717.50 n 'iJ ROAD CONSTRUCTION 3,268 Linear Feet 4,053,454.00 Contingency 105,729.29 Construction Management Fee 211,458.58 Construction Subtotal 4,370,641.86 CELL TOWER RELOCATION �6O � 0, 000.00 TOTAL DESIGN AND CONSTRUCTION $ 5,146,359.36 NOTE: 1) Budget does not include any interest cost should payment schedule be other than monthly. 2) The cell tower relocation cost is subject to revision by American Tower after a final determination has been made of the cost to relocate cell carriers to the new tower.