Loading...
Rolling Oaks MC-CS090526Page 1 of 1 Michael Garza - RE: Invoice From: "Ken Baxter" <kbaxter @jstarchitects.com> To: "Michael Garza" <mgarza @ci.coppell.tx.us> Date: 5/26/2009 1:22 PM Subject: RE: Invoice CC: "Nora Hampton" <nhampton @jstarchitects.com> Attachments: SCAN1503_000.pdf Mike, The only time we had shown a revision in our fee amount (which had been based on a percentage of the cost for construction) was within the December 31, 2008 invoice. If you'll notice it has noted "Construction cost updated 12/30/08 to reflect Change Order 001 ". The increase fee adjustment was actually not based on the Change Order amount but were based on corrections to the construction Contract amount in previous invoices. Prior to Dec /08 our fee shown had been based on an estimated cost of construction in the amount of $2,646,819.00. It wasn't until the December billing which included Change Order 001 documentation that accounting realized the correct cost of construction should be $2,945,000.00. We have attached the 12/31/08 invoice along with a copy of the previous invoice 12/2/08 for your review. Again notice the difference in Arch's fee amounts reflects the differences between the two construction costs basis. Let us know if you have any questions. Thanks, Ken Baxter Senior Project Manager J. Stuart Todd, Inc. Architecture /Interiors /Planning 2919 Welborn Dallas, Texas 75219 214 -522 -4033 214 -522 -7988 fx. From: Michael Garza [ mailto:mgarza @ci.coppell.tx.us] Sent: Thursday, May 21, 2009 3:53 PM To: Ken Baxter Subject: Invoice Ken, Can you send my copies of all change orders that show the increase in contract amount for services by J. Stuart Todd, Inc. Thanks, Mike file: HC: \Documents and Settings \radloo \Local Setting s \Temp \XPgrpwise \4A1 BED 16 City 4/23/2010 J. Stuart Todd, Inc. 2919 Welborn, Suite 101 Dallas, TX 75219 214 - 522 -4033 City of Coppell Engineering Department Attn: Mike Garza P. 0. Box 9478 Coppell, TX 75019 Invoice number Date 17969 12/2/2008 Contract: 04751.02 Rolling Oaks Phase III -IV Client ID: C042 Rolling Oaks Memorial Center Cemetery t As per John Gary's AIA Agreement dated September 17, 2007., Cost estimate updated to bid submitted by Fain Group: $2,646,819.00 Architect's Fee: 7.00% �,, 4 .� f o-� Contract Percent Billed Previously Current Item Description Amount Complete To Date Billed Billed 03 III - Construction Documents 119,106.86 100.00% 119, 1106.86 119,106.86 0.00 04 IV- Construction Administration 66,170.47 60.00% 39,702.28 36,393.76 3,308.52 16 Landscapelirrigation Design 25,000,00 100.00% 25,000.00 25,000.00 0.00 Contract total 210,277.33 87.41% 1 83,809.14 180,500.62 3,308.52 Reimbursable Activity Re prod uctio n/P ri nting /P lots Postage /Shipping /Delivery Amount 16.27 11.16 Reimbursable subtotal 27.43 Invoice total 3,335.95 Previous balance due 0.00 Total due (to date) 3,335.95 City of Coppell Invoice ID: 17969 121212008 ARc"=1C1 INTEMM PUNNING J. Stuart Todd, Inc. 2919 Welborn, Suite 101 Dallas, TX 75219 214- 522 -4033 City of Coppell Engineering Department Attn: Mike Garza P. O. Box 9478 Coppell, TX 75019 Invoice number 18015 Date 12/31/2008 Contract: 04751.02 Client ID: C042 Rolling Oaks Phase III -IV Rolling Oaks Memorial Center Cemetery As per John Gary's AIA Agreement dated September 17, 2007. Construction cost updated 12/30/2008 to reflect Change Order 001: $2,945,190.00 Architect's Fee: 7.00% Con total 231,163.30 87.26% 201,711.40 183,809.14 17,902.26 Reimbursable Activi Postage /Shipping /Delivery Reimbursable subtotal Invoice total Amount 7.95 7.95 1 t,v - IU.ZI 0.00 Previous balance due Total due (to date) City of Coppell 17.910.21 Invoice ID: 18015 J NiCH1TEC U INTGN�ons PLANNING 12/31/2008 Contract Percent Billed Previously Current Item Description Amount Complete To Dale Billed Billed 03 III - Construction Documents 132,533.55 100.00% 132,533.55 119,106.86 13,426.69 04 IV- Construction Administration 73,629.75 60.00% 44,177.85 39,702.28 4,475.57 16 Landscape /irrigation Design 25,000.00 100.00% 25,000.00 25,000.00 0.00 Con total 231,163.30 87.26% 201,711.40 183,809.14 17,902.26 Reimbursable Activi Postage /Shipping /Delivery Reimbursable subtotal Invoice total Amount 7.95 7.95 1 t,v - IU.ZI 0.00 Previous balance due Total due (to date) City of Coppell 17.910.21 Invoice ID: 18015 J NiCH1TEC U INTGN�ons PLANNING 12/31/2008