Rolling Oaks MC-CS0906162010) Michael Garza - FW: Landscape Changes for Rolling Oaks Page 1
From: "Ken Baxter" <kbaxter @jstarchitects.com>
To: "Brad Reid" <breid @ci.coppell.tx.us >, "Michael Garza" <MGARZA @ci.coppell...
Date: 6/16/2009 2:04 PM
Subject: FW: Landscape Changes for Rolling Oaks
Attachments: SCAN 3044000. pdf
Brad /Tom,
Take a look at the attached Proposal from Fain for the extra landscape work requested at our meeting last
week. Let us know how to direct the contractor.
Thanks,
Ken Baxter
Senior Project Manager
J. Stuart Todd, Inc.
Arch itectu re/I nteriors /Planning
2919 Welborn
Dallas, Texas 75219
214 - 522 -4033
214 - 522 -7988 fx.
- - - -- Original Message---- -
From: Jason Copes [mailto:JCopes @faingp.com]
Sent: Monday, June 15, 2009 2:39 PM
To: Ken Baxter
Subject: Landscape Changes for Rolling Oaks
Ken,
Attached is pricing for changes requested by the City on site for the Rolling Oaks project. The first one
was to make the stockpile from the project into a permanent berm. We did the earthwork on the berm
and did hydro- seeding along with temporary irrigation to establish the seed. Tom Omick also requested
an area North of the Columbarium to have sod and temporary irrigation. This is the area he plans to place
sample headstones for sales.
Please let me know if you have any questions.
Thanks,
Jason
0
June 15, 2009
Ken Baxter
J. Stuart Todd, Inc.
2919 Welborn Suite 101
Dallas, TX 75219
RE: Rolling Oaks Memorial Center
Landscape and Earthwork Changes
Mr. Baxter:
FAIN
Building Relationships
Constructing Futures
P.O. Box 750
Fort Worth, TX 76101
817 - 927 -4388
817 - 927 -4389 Fax
www.thefaincompany.com
Below is a breakdown of pricing for changes that were requested by the City in on -site
meetings. The first request was to re -grade the stockpile into a permanent berm and
hydro -seed including temporary irrigation to establish the seed. The second request was
to add sod and temporary irrigation to an area on the north side of the road from the
Columbarium. This is the area the City plans to use to place sample headstones.
DESCRIPTION QUANTITY UNITS COST /UNIT 1 1 TOTAL
Earthwork for new Berm
1
LS
$2,116.00
$2,116.00
H dromulch w/ Temp. Irrigation for Berm
1
LS
$5,500.00
$5,500.00
Addit. Sod w/Temp. Irrigation for Headstone display
area
1
LS
$3,050.00
$3,050.00
Overhead and Profit 10%
1
1 LS
$1,066.60
$1,066.60
Bond 1.18%
1
1 LS
$138.44
$138.44
Total cost $11,871704
If you have any questions or comments, please feel free to contact me at 817 - 927 -4388.
Thanks,
JS!MCop es
Project Manager
Jason Copes
From: Joseph T. Angelone U to @americanlandscapesystems.com]
Sent: Friday, June 12, 2009 12:01 PM
To: Jason Copes; Larry Frazier
Cc: 'Joe Davila'
Subject: Adds for Rolling Oaks
1. Additional Sod for Columbarium w /temp irrigation -7500 sf =$2250 and $800 for temp irrigatio
2 romulch with Temp irrigation- 117,513 sf Hydromulch =$4700 and $80 f temp irrigatior
3.._Sod and-Be-gr -ade Nor- thwestz adr`a nt -o-f- Hope --l-2- 000 - sf=3; 600 - a - nd - 120D`for acrd - clean -up,
slope44,8.0.0_ FA
� [d so believe we should add about 3 trucks of sod that would cover most of the trouble areas around the site. 27,000 sf
8,100. This will give you bands around the perimeter and slope protection where needed. Let me know what is
cided. �A (4tC U��; 5 6 as
Joseph Angelone
Vice President
American Landscape Systems, Inc.
1780 Midway Road
Lewisville, Texas 75056
ph: 469- 521 -2200
fx: 469- 521 -2206
lta @americanlandscapesystems.com
05/22/2009 15:08 9723990008 HOLBROOK PAGE 01
Date: 22 May 2009
Fain Group
PO Box 705
Fort Worth, TX 76101
Tel (817) 927 -4388
Fax (817) 927 -4389
Attention: Alex Fisher
Invoice: co4702b revised
Coppefi Cemetery
400 S, Freeport
Coppell, TX
The Nol6took CompAng, Inc.
3430 Hig.1 Nlrie R(7arf
Gralu + Pralrli,;X 75 A1�5
972.39x.0007 otfic.e
W7.999,0008 hx
www.rhp.hpthrookrnal0�rnu.com
rricing Tor additional work required to haul off others' trash and move spoils on site as directed by
Revised to reflect tandem truck in lieu of trailers,
Quantity Unit Description --- T — Unit price Total
8 hour tandem dump truck w/ operator W 80 $
8 hour track loader w/ op erator $80.00 $640 -00
$150.00 $1,200.01
Subtotal:
Overhead at 10 %:
Subtotal:
Profit at 10 %:
Total for this Invoice:
$3,860.00
C3
o0
TA [AVAI7rie cruPL11164 Nrenrl RATHIh
SA- 6 x,A 1'30 oO
04-+`P
$3,190.00
$319,00
$3,509.00
$351,00
2010) Michael Garza - FW: Additional Sod Page 1
From: "Ken Baxter" <kbaxter @jstarchitects.com>
To: "Brad Reid" <breid @ci.coppell.tx.us >, "Tom Omick" <TOMICK @ci.coppell.tx....
Date: 6/16/2009 2:10 PM
Subject: FW: Additional Sod
Attachments: SCAN 3045000. pdf
Brad /Tom,
Take a look at the attached Proposal from Fain for the extra sod work (not a part of the "Landscape &
Earthwork" June 15 Proposal) requested at our meeting last week. Let us know how to direct the
contractor.
Thanks,
Ken Baxter
Senior Project Manager
J. Stuart Todd, Inc.
Arch itectu re/I nteriors /Planning
2919 Welborn
Dallas, Texas 75219
214 - 522 -4033
214 - 522 -7988 fx.
- - - -- Original Message---- -
From: Jason Copes [mailto:JCopes @faingp.com]
Sent: Monday, June 15, 2009 2:47 PM
To: Ken Baxter
Cc: Tom Omick
Subject: Additional Sod
Ken,
Attached is the pricing to cover the areas in sod that we discussed in the meeting with the City on June 11,
2009. This change request covers all the areas that we believe would benefit from receiving sod to help
with erosion and benefit the project while trying to get the seed established. This pricing does not include
approx. 12,OOOsf of sod that we have authorized the Landscape contractor to proceed with at our
expense. This is in the Garden of Hope on the Northwest corner on the slope. We will re -grade and sod
this area. We would like to move from this area immediately to working on this change if approved. Any
assistance on a quick response to this change request would be appreciated.
Thanks,
Jason Copes
The Fain Group
PH 817- 927 -4388
0
June 15, 2009
FAI
LS
Building Relationships
Ken Baxter
Constructing Futures
J. Stuart Todd Inc.
P.O. Box 750
Fort Worth, TX 76101
2919 Welborn Suite 101
817- 927 -4388
Dallas, TX 75219
817 - 927 -4389 Fax
www.thefaincompany.com
RE: Rolling Oaks Memorial Center
Additional Sod change request
Mr. Baxter:
Below is the change request breakdown to add sod at areas behind curbs and some slope
areas to prevent further erosion and help establish the areas. This covers the areas
discussed in the meeting with the City on June 11, 2009. This price does not include the
area discussed in the Garden of Hope which The Fain Group is proceeding with the sod at
our expense.
DESCRIPTION QUANTlifl UNITS COST /UNIT I TOTAL
Addit. Sod strips at curbs /slopes to help establish
g rowth
1
LS
$8,100.00
$8,100.00
Overhead and Profit 10%
1
LS
$810.00
$810.00
Bond 1.18%
1
LS
$105.14
$105.14
Total cost $9,015.14
If you have any questions or comments, please feel free to contact me at 817- 927 -4388.
Thanks,
JaT� Copes
Project Manager
Jason Copes
From: Joseph T. Angelone O to @americanlandscapesystems.com]
Sent: Friday, June 12, 2009 12:01 PM
To: Jason Copes; Larry Frazier
Cc: 'Joe Davila'
Subject: Adds for Rolling Oaks
Rea 5�
1. Additional Sod for Columbarium w /temp irrigation -7500 sf =$2250 and $800 fortemp irrigation =$3050 - c \,
tlr-ec e
2. Hydromulch with Temp irrigation- 117,513 sf Hydromulch =$4700 and $800 for temp irrigation = $5,500
3. _ Sod andJ - egr- ade- IJorthwe ua ra of G of- Hope -4 ; 000 - sf=�600and - 12U0`for - ree-grar e efea.n -uA
slope= $4,800 -
I also believe we should add about 3 trucks of sod that would cover most of the trouble areas around the site. 27,000 sf
$8,100. This will give you bands around the perimeter and slope protection where needed. Let me know what is
decided. ff
CA
Jose ge o
Vice President
American Landscape Systems, Inc.
1780 Midway Road
Lewisville, Texas 75056
ph: 469 - 521 -2200
fx: 469 - 521 -2206