Rolling Oaks MC-CS0906162010) Michael Garza - FW: Landscape Changes for Rolling Oaks Page 1 From: "Ken Baxter" <kbaxter @jstarchitects.com> To: "Brad Reid" <breid @ci.coppell.tx.us >, "Michael Garza" <MGARZA @ci.coppell... Date: 6/16/2009 2:04 PM Subject: FW: Landscape Changes for Rolling Oaks Attachments: SCAN 3044000. pdf Brad /Tom, Take a look at the attached Proposal from Fain for the extra landscape work requested at our meeting last week. Let us know how to direct the contractor. Thanks, Ken Baxter Senior Project Manager J. Stuart Todd, Inc. Arch itectu re/I nteriors /Planning 2919 Welborn Dallas, Texas 75219 214 - 522 -4033 214 - 522 -7988 fx. - - - -- Original Message---- - From: Jason Copes [mailto:JCopes @faingp.com] Sent: Monday, June 15, 2009 2:39 PM To: Ken Baxter Subject: Landscape Changes for Rolling Oaks Ken, Attached is pricing for changes requested by the City on site for the Rolling Oaks project. The first one was to make the stockpile from the project into a permanent berm. We did the earthwork on the berm and did hydro- seeding along with temporary irrigation to establish the seed. Tom Omick also requested an area North of the Columbarium to have sod and temporary irrigation. This is the area he plans to place sample headstones for sales. Please let me know if you have any questions. Thanks, Jason 0 June 15, 2009 Ken Baxter J. Stuart Todd, Inc. 2919 Welborn Suite 101 Dallas, TX 75219 RE: Rolling Oaks Memorial Center Landscape and Earthwork Changes Mr. Baxter: FAIN Building Relationships Constructing Futures P.O. Box 750 Fort Worth, TX 76101 817 - 927 -4388 817 - 927 -4389 Fax www.thefaincompany.com Below is a breakdown of pricing for changes that were requested by the City in on -site meetings. The first request was to re -grade the stockpile into a permanent berm and hydro -seed including temporary irrigation to establish the seed. The second request was to add sod and temporary irrigation to an area on the north side of the road from the Columbarium. This is the area the City plans to use to place sample headstones. DESCRIPTION QUANTITY UNITS COST /UNIT 1 1 TOTAL Earthwork for new Berm 1 LS $2,116.00 $2,116.00 H dromulch w/ Temp. Irrigation for Berm 1 LS $5,500.00 $5,500.00 Addit. Sod w/Temp. Irrigation for Headstone display area 1 LS $3,050.00 $3,050.00 Overhead and Profit 10% 1 1 LS $1,066.60 $1,066.60 Bond 1.18% 1 1 LS $138.44 $138.44 Total cost $11,871704 If you have any questions or comments, please feel free to contact me at 817 - 927 -4388. Thanks, JS!MCop es Project Manager Jason Copes From: Joseph T. Angelone U to @americanlandscapesystems.com] Sent: Friday, June 12, 2009 12:01 PM To: Jason Copes; Larry Frazier Cc: 'Joe Davila' Subject: Adds for Rolling Oaks 1. Additional Sod for Columbarium w /temp irrigation -7500 sf =$2250 and $800 for temp irrigatio 2 romulch with Temp irrigation- 117,513 sf Hydromulch =$4700 and $80 f temp irrigatior 3.._Sod and-Be-gr -ade Nor- thwestz adr`a nt -o-f- Hope --l-2- 000 - sf=3; 600 - a - nd - 120D`for acrd - clean -up, slope44,8.0.0_ FA � [d so believe we should add about 3 trucks of sod that would cover most of the trouble areas around the site. 27,000 sf 8,100. This will give you bands around the perimeter and slope protection where needed. Let me know what is cided. �A (4tC U��; 5 6 as Joseph Angelone Vice President American Landscape Systems, Inc. 1780 Midway Road Lewisville, Texas 75056 ph: 469- 521 -2200 fx: 469- 521 -2206 lta @americanlandscapesystems.com 05/22/2009 15:08 9723990008 HOLBROOK PAGE 01 Date: 22 May 2009 Fain Group PO Box 705 Fort Worth, TX 76101 Tel (817) 927 -4388 Fax (817) 927 -4389 Attention: Alex Fisher Invoice: co4702b revised Coppefi Cemetery 400 S, Freeport Coppell, TX The Nol6took CompAng, Inc. 3430 Hig.1 Nlrie R(7arf Gralu + Pralrli,;X 75 A1�5 972.39x.0007 otfic.e W7.999,0008 hx www.rhp.hpthrookrnal0�rnu.com rricing Tor additional work required to haul off others' trash and move spoils on site as directed by Revised to reflect tandem truck in lieu of trailers, Quantity Unit Description --- T — Unit price Total 8 hour tandem dump truck w/ operator W 80 $ 8 hour track loader w/ op erator $80.00 $640 -00 $150.00 $1,200.01 Subtotal: Overhead at 10 %: Subtotal: Profit at 10 %: Total for this Invoice: $3,860.00 C3 o0 TA [AVAI7rie cruPL11164 Nrenrl RATHIh SA- 6 x,A 1'30 oO 04-+`P $3,190.00 $319,00 $3,509.00 $351,00 2010) Michael Garza - FW: Additional Sod Page 1 From: "Ken Baxter" <kbaxter @jstarchitects.com> To: "Brad Reid" <breid @ci.coppell.tx.us >, "Tom Omick" <TOMICK @ci.coppell.tx.... Date: 6/16/2009 2:10 PM Subject: FW: Additional Sod Attachments: SCAN 3045000. pdf Brad /Tom, Take a look at the attached Proposal from Fain for the extra sod work (not a part of the "Landscape & Earthwork" June 15 Proposal) requested at our meeting last week. Let us know how to direct the contractor. Thanks, Ken Baxter Senior Project Manager J. Stuart Todd, Inc. Arch itectu re/I nteriors /Planning 2919 Welborn Dallas, Texas 75219 214 - 522 -4033 214 - 522 -7988 fx. - - - -- Original Message---- - From: Jason Copes [mailto:JCopes @faingp.com] Sent: Monday, June 15, 2009 2:47 PM To: Ken Baxter Cc: Tom Omick Subject: Additional Sod Ken, Attached is the pricing to cover the areas in sod that we discussed in the meeting with the City on June 11, 2009. This change request covers all the areas that we believe would benefit from receiving sod to help with erosion and benefit the project while trying to get the seed established. This pricing does not include approx. 12,OOOsf of sod that we have authorized the Landscape contractor to proceed with at our expense. This is in the Garden of Hope on the Northwest corner on the slope. We will re -grade and sod this area. We would like to move from this area immediately to working on this change if approved. Any assistance on a quick response to this change request would be appreciated. Thanks, Jason Copes The Fain Group PH 817- 927 -4388 0 June 15, 2009 FAI LS Building Relationships Ken Baxter Constructing Futures J. Stuart Todd Inc. P.O. Box 750 Fort Worth, TX 76101 2919 Welborn Suite 101 817- 927 -4388 Dallas, TX 75219 817 - 927 -4389 Fax www.thefaincompany.com RE: Rolling Oaks Memorial Center Additional Sod change request Mr. Baxter: Below is the change request breakdown to add sod at areas behind curbs and some slope areas to prevent further erosion and help establish the areas. This covers the areas discussed in the meeting with the City on June 11, 2009. This price does not include the area discussed in the Garden of Hope which The Fain Group is proceeding with the sod at our expense. DESCRIPTION QUANTlifl UNITS COST /UNIT I TOTAL Addit. Sod strips at curbs /slopes to help establish g rowth 1 LS $8,100.00 $8,100.00 Overhead and Profit 10% 1 LS $810.00 $810.00 Bond 1.18% 1 LS $105.14 $105.14 Total cost $9,015.14 If you have any questions or comments, please feel free to contact me at 817- 927 -4388. Thanks, JaT� Copes Project Manager Jason Copes From: Joseph T. Angelone O to @americanlandscapesystems.com] Sent: Friday, June 12, 2009 12:01 PM To: Jason Copes; Larry Frazier Cc: 'Joe Davila' Subject: Adds for Rolling Oaks Rea 5� 1. Additional Sod for Columbarium w /temp irrigation -7500 sf =$2250 and $800 fortemp irrigation =$3050 - c \, tlr-ec e 2. Hydromulch with Temp irrigation- 117,513 sf Hydromulch =$4700 and $800 for temp irrigation = $5,500 3. _ Sod andJ - egr- ade- IJorthwe ua ra of G of- Hope -4 ; 000 - sf=�600and - 12U0`for - ree-grar e efea.n -uA slope= $4,800 - I also believe we should add about 3 trucks of sod that would cover most of the trouble areas around the site. 27,000 sf $8,100. This will give you bands around the perimeter and slope protection where needed. Let me know what is decided. ff CA Jose ge o Vice President American Landscape Systems, Inc. 1780 Midway Road Lewisville, Texas 75056 ph: 469 - 521 -2200 fx: 469 - 521 -2206 ita @americanlandscapesystems.com