Loading...
Rolling Oaks MC-CS090730Page 1 of 2 Michael Garza - FW: Coppell Cemetery As -Built From: "Ken Baxter" <kbaxter( ',j starchitects.com> To: "Jason Copes" <JCopes(�'.Uaingp.com> Date: 7/30/2009 8:34 AM Subject: FW: Coppell Cemetery As -Built CC: "Michael Garza" <mgarza(�'.&i.coppell.tx.us> Attachments: 5294 -SPOT SHOTS - 2009 -7 -22 (2).pdf Jason, An area drain would be fine. Where is this drain going to be positioned? Make sure it has some type of grate cover that's higher than grade (dome type) so it won't get covered and clogged. At the same time we don't want to bring attention to it so it needs to be dark in color. http://www.bestmaterials.com/drain-cover-617.html Ken Baxter Senior Project Manager J. Stuart Todd, Inc. Architecture /Interiors /Planning 2919 Welborn Dallas, Texas 75219 214 - 522 -4033 214 - 522 -7988 fx. From: Jason Copes [mailto:JCopes @faingp.com] Sent: Wednesday, July 29, 2009 3:52 PM To: Ken Baxter Subject: FW: Coppell Cemetery As -Built Ken, Attached is what our surveyor provided as far as final elevations around the columbarium. Doug went to the site today to review the northwest corner of the columbarium. He thinks we need to go ahead and add an area drain in this corner. We can remove two sections of sidewalk and run the drain line through the curb and then repour the two sections of sidewalk. I know we have discussed a few options here but after looking at it again this is our suggestion since there is very little slope in this area. Please let me know if this is acceptable and we will get it installed if it is. Thanks, Jason From: Jason Copes [mailto:JCopes @faingp.com] Sent: Friday, July 17, 2009 2:12 PM file: HC: \Documents and Settings \radloo \Local Settings\Temp\XPgrpwise\4A71 5 B OD City_... 4/28/2010 Page 2 of 2 To: Sean Shropshire Cc: Ernest Garcia Subject: RE: Coppell Cemetery As -Built Can you put some spot elevation on the as- built. Finish floor elevations and some spots on the curbs and sidewalks. My main concern right now is around the Columbarium (finish floor and sidewalks around that building). The City has taken some shots and it appears we may have some issues there and I was hoping you could verify the actual elevations. I will forward what they sent in a separate email. Thanks, Jason From: Sean Shropshire [mailto:sShropshire @garcialanddata.com] Sent: Thursday, July 02, 2009 12:55 PM To: Jason Copes Cc: Ernest Garcia Subject: Coppell Cemetery As -Built Jason, Her is the as -built for the cemetery. Let me know if you need anything further. Sean Shropshire, R.P.L.S. Garcia Land Data, Inc. 6210 Campbell Rd., Ste. 110 Dallas, TX 75248 Phone: 214.987.0149 Fax: 214.987.4026 Mobile: 214.985.3700 sshropshire@garcialanddata.com file: HC: \Documents and Settings \radloo \Local Settings\Temp\XPgrpwise\4A71 5 B OD City_... 4/28/2010 ana � ~a 516.96 9 4 m \ TC M\ 517.08 q TC 517.20 TC 51730 TC EC 518.82 -� 518.85 TC � TC ` 516 ° 517.Q7 TC.S 51723 TC 51Q.42 ` TTCC 517.44 TC.EC 517.24 c a c 4 c 516.00 I F 5 F '7.29 \ 515.68 ONE -STORY 515.63 ARICK BUILDING 515.73 o (3)A( 515.70* INLET 515.88