Rolling Oaks MC-CS091002 Page 1 of 1 Michael Garza - Rolling Oaks/Restland Coppell Final Payments and Closeout Docs From:   "Ken Baxter" <kbaxter@jstarchitects.com> To:   "Jason Copes" <JCopes@faingp.com> Date:   10/2/2009 12:42 PM Subject:   Rolling Oaks/Restland Coppell Final Payments and Closeout Docs CC:"Brown, Julian W." <JWBrown@stei.com>, "Shake, Brian" <bshake@stei.com>,     "Michael Garza" <mgarza@ci.coppell.tx.us> Attachments:CO #004rev.pdf; G701 - Final - 004(1).pdf; G706-1994 - Final - 001(1).pdf; G706-1994     - Final - 001(1).pdf; Handicap Sidewalk Access Route Guidelines.pdf   Jason,   I’ve reviewed the Applications for Payments and the amounts for Rolling Oaks looks to be fine. I think you were going to forward the signed Change Order 004rev. for the credit of $1,500.00 (I’ve attached a new copy).   We still need the following Docs. for both projects: 1.Contractor’s Affidavit of Payment of Debts and Claims: AIA G706 (see the attached copies)       2.General Contractors Conditional and Unconditional Release of Waiver of Liens. (for current and       previous month’s payment amounts)   On Restland FH according to my calculations I show the remaining balance to be paid as $112,049.04. Which is the difference added to the contract ($704.44) in Change Order 004. Check your numbers and let us know. (Attached is CO# 004 sent to SEI for your reference).   I’ve also attached the Texas Handicap requirements regarding the sidewalk access over the entry gate rail for your use.   Let me know if you have any questions. Thanks,   Ken Baxter Senior Project Manager   J. Stuart Todd, Inc. Architecture/Interiors/Planning 2919 Welborn Dallas, Texas   75219   214-522-4033 214-522-7988 fx .   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4AC5F54BCity_...4/28/2010 ܱ½«³»²¬ Ùéðï îððï ÌÓ Ý¸¿²¹» Ñ®¼»® ÐÎÑÖÛÝÌ(Name and address) ÝØßÒÙÛ ÑÎÜÛÎ ÒËÓÞÛÎæ ÑÉÒÛÎæ :004 ÜßÌÛæ Restland Funeral Home Coppell Chapel August 06, 2009 ßÎÝØ×ÌÛÝÌæ 400 S. Freeport Parkway Coppell, Texas ÝÑÒÌÎßÝÌÑÎæ ÌÑ ÝÑÒÌÎßÝÌÑÎ(Name and address): ßÎÝØ×ÌÛÝÌÍ ÐÎÑÖÛÝÌ ÒËÓÞÛÎæ 07899 Ú×ÛÔÜæ ÝÑÒÌÎßÝÌ ÜßÌÛæ The Fain GroupAugust 06, 2008 ÑÌØÛÎæ 825 West Vickery ÝÑÒÌÎßÝÌ ÚÑÎæ General Construction Ft. Worth, Tx. 76104 ÌØÛ ÝÑÒÌÎßÝÌ×ÍÝØßÒÙÛÜßÍ ÚÑÔÔÑÉÍæ (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Added countertop in Music Room per Owner's request. $ 704.44 Deduct countertop amount from remaining contingency allowance. < 4,206.97> Total Remaining amount in "Contingency Allowance" < 3,502.53> ü The original Contract Sumwas 1,846,634.00 ü The net change by previously authorized Change Orders0.00 ü The Contract Sumprior to this Change Order was 1,846,634.00 ü The Contract Sumwill be unchanged by this Change Order in the amount of 0.00 ü The new Contract Sumincluding this Change Order will be 1,846,634.00 The Contract Time will be unchangedby Zero ( 0) days. The date of Substantial Completion as of the date of this Change Order therefore is July 02, 2009 ÒÑÌÛæ This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. ÒÑÌ ÊßÔ×ÜËÒÌ×ÔÍ×ÙÒÛÜÞÇÌØÛßÎÝØ×ÌÛÝÌôÝÑÒÌÎßÝÌÑÎßÒÜÑÉÒÛÎò J. Stuart Todd, Inc.The Fain Group S.E. Funeral Home of Coppell ßÎÝØ×ÌÛÝÌ(Firm name)ÝÑÒÌÎßÝÌÑÎ(Firm name)ÑÉÒÛÎ(Firm name) 2919 Welborn 825 West Vickery 400 S. Freeport Parkway ßÜÜÎÛÍÍ ßÜÜÎÛÍÍßÜÜÎÛÍÍ ÞÇ (Signature)ÞÇ (Signature)ÞÇ(Signature) Ken Baxter: Senior Project ManagerLarry Frazier: President Brian Shake: Vice President (Typed name) (Typed name) (Typed name) ÜßÌÛÜßÌÛÜßÌÛ ® AIA Document G701™– 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIADocument, or any 1 portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 12:16:06on 10/02/2009 under Order No.8766812906_1 which expires on 09/03/2010, and is not for resale. User Notes: (1850226773) ܱ½«³»²¬ Ùéðê ïççì ÌÓ Ý±²¬®¿½¬±®ù­ ߺº·¼¿ª·¬ ±º п§³»²¬ ±º Ü»¾¬­ ¿²¼ Ý´¿·³­ ÐÎÑÖÛÝÌæßÎÝØ×ÌÛÝÌÍ ÐÎÑÖÛÝÌ ÒËÓÞÛÎæ ÑÉÒÛÎæ (Name and address) Restland Funeral Home Coppell 07899 ßÎÝØ×ÌÛÝÌæ ÝÑÒÌÎßÝÌÑÎæ Chapel ÍËÎÛÌÇæ 400 S. Freeport Parkway ÝÑÒÌÎßÝÌ ÚÑÎæ General Construction ÑÌØÛÎæ Coppell, Texas ÌÑ ÑÉÒÛÎæ ÝÑÒÌÎßÝÌ ÜßÌÛÜæ (Name and address)August 06, 2008 S.E. Funeral Home of Coppell 400 S. Freeport Parkway Coppell, Tx. 75019 ÍÌßÌÛ ÑÚæ Texas ÝÑËÒÌÇ ÑÚæ Dallas/Denton The undersigned hereby certifies that, except as listed below, payment has been made in full and all obligations have otherwise been satisfied for all materials and equipment furnished, for all work, labor, and services performed, and for all known indebtedness and claims against the Contractor for damages arising in any manner in connection with the performance of the Contract referenced above for which the Owner or Owner’s property might in any way be held responsible or encumbered. ÛÈÝÛÐÌ×ÑÒÍæ n/a SUPPORTING DOCUMENTS ATTACHED HERETO: ÝÑÒÌÎßÝÌÑÎæ (Name and address) ïò The Fain Group Consent of Surety to Final Payment. Whenever Surety is involved, Consent of Surety is 825 West Vickery required. AIA Document G707, Consent of Ft. Worth, Tx. 76104 Surety, may be used for this purpose Indicate Attachment Yes No BY: The following supporting documents should be attached (Signature of authorized representative) hereto if required by the Owner: Larry Frazier: President ïò (Printed name and title) Contractor’s Release or Waiver of Liens, conditional upon receipt of final payment. îò Subscribed and sworn to before me on this date: Separate Releases or Waivers of Liens from Subcontractors and material and equipment suppliers, to the extent required by the Owner, accompanied by a list thereof. Notary Public: íò My Commission Expires: Contractor’s Affidavit of Release of Liens (AIA Document G706A). ® AIA Document G706™– 1994. Copyright © 1970 and 1994 by The American Institute of Architects. All rights reserved. WARNING: This AIADocument is ® protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may 1 result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 12:04:30 on 10/02/2009 under Order No.8766812906_1which expires on 09/03/2010, and is not for resale. User Notes: (1987082830) ܱ½«³»²¬ Ùéðê ïççì ÌÓ Ý±²¬®¿½¬±®ù­ ߺº·¼¿ª·¬ ±º п§³»²¬ ±º Ü»¾¬­ ¿²¼ Ý´¿·³­ ÐÎÑÖÛÝÌæßÎÝØ×ÌÛÝÌÍ ÐÎÑÖÛÝÌ ÒËÓÞÛÎæ ÑÉÒÛÎæ (Name and address) Rolling Oaks Memorial Center04751 ßÎÝØ×ÌÛÝÌæ ÝÑÒÌÎßÝÌÑÎæ 400 South Freeport Parkway ÝÑÒÌÎßÝÌ ÚÑÎæ General Construction ÍËÎÛÌÇæ Coppell, Texas 75019 ÑÌØÛÎæ ÌÑ ÑÉÒÛÎæÝÑÒÌÎßÝÌ ÜßÌÛÜæ (Name and address)April 08, 2008 City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 ÍÌßÌÛ ÑÚæ Texas ÝÑËÒÌÇ ÑÚæ Dallas/Denton The undersigned hereby certifies that, except as listed below, payment has been made in full and all obligations have otherwise been satisfied for all materials and equipment furnished, for all work, labor, and services performed, and for all known indebtedness and claims against the Contractor for damages arising in any manner in connection with the performance of the Contract referenced above for which the Owner or Owner’s property might in any way be held responsible or encumbered. ÛÈÝÛÐÌ×ÑÒÍæ n/a SUPPORTING DOCUMENTS ATTACHED HERETO: ÝÑÒÌÎßÝÌÑÎæ (Name and address) ïò The Fain Group Consent of Surety to Final Payment. Whenever Surety is involved, Consent of Surety is 825 West Vickery required. AIA Document G707, Consent of Ft. Worth, Texas 76104 Surety, may be used for this purpose Indicate Attachment Yes No BY: The following supporting documents should be attached (Signature of authorized representative) hereto if required by the Owner: Larry Frazier: President ïò (Printed name and title) Contractor’s Release or Waiver of Liens, conditional upon receipt of final payment. îò Subscribed and sworn to before me on this date: Separate Releases or Waivers of Liens from Subcontractors and material and equipment suppliers, to the extent required by the Owner, accompanied by a list thereof. Notary Public: íò My Commission Expires: Contractor’s Affidavit of Release of Liens (AIA Document G706A). ® AIA Document G706™– 1994. Copyright © 1970 and 1994 by The American Institute of Architects. All rights reserved. WARNING: This AIADocument is ® protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may 1 result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:57:17 on 10/02/2009 under Order No.8766812906_1which expires on 09/03/2010, and is not for resale. User Notes: (841961047)