Loading...
Rolling Oaks MC-CS091104 (4/28/2010) Michael Garza - Fwd: pavingPage 1 From: Tom Omick To:Michael Garza Date: 11/4/2009 4:12 PM Subject: Fwd: paving Mike, We are looking at a 150' road 12' wide with 6" of material. I have two bids I need one more. Of course where I was gonna put it didn't require any trees to be taken down. A turn around would be nice but they could always just back up. Thanks, Tom >>> Michael Garza 11/4/2009 3:46 PM >>> Tom, I spoke with our streets dept. and they said it would probably be a better idea if we get a contractor to do the work, I have a couple of other contractors that are going to take a look at it, the guys working on south coppell rd, would probably give a better price, what dimensions are you thinking 10' wide by 50' long? Are they going to need a turn around or can they back up and dump it. Keith and I looked at it in it looks like it would be better to place it in the northeast corner of the cemetery where the drive dead ends now, we can clear some of the mesquite trees to make room. What dimensions did you tell the other contractors so we can get a fair assessment? thanks, Mike