April 29, 2010
Hartford Fire Insurance Company
2 Park Avenue, 5 Floor
New York, NY 10016
VIA CERTIFIED MAIL
RE: Duke Lesley Addition, Infrastructure Bond No. 46BCSE07205
Street Failure(s) on Dividend Dr. & Point West Blvd.
Dear Sir or Madam:
The two -year term on the above referenced maintenance bond began on February 21, 2008, the date of
final acceptance of the project. The City of Coppell has been in contact with the owner, the general
contractor and the subcontractor regarding workmanship covered under the maintenance bond since before
the term of the bond expired. (See the enclosed letters, please.) Your insured, San Saba Construction
Services, Inc., installed fire hydrants and underground water lines for the project. The potential exists that
the work is a contributing cause of the pavement failures, as those installations are where many of the
failures were discovered, and where the pavement is also continuing to deteriorate.
During two separate meetings at the site, the paving contractor assured me that the problems discovered in
the paving on Dividend Drive and Point West Boulevard would be addressed, so that further deterioration
could be prevented. As of the date of this letter, those locations have not been repaired and further
damage is occurring. The City of Coppell must, therefore, use maintenance bond monies to affect the
repairs needed in order to protect our infrastructure and vehicles from further damage.
Please contact me at your earliest convenience to discuss how this will be accomplished.
Sincerel ,
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
cc: Ken Griffin, P.E., Director of Engineering & Public Works
Keith Flowers, Duke Construction
Tod Feazell, L.H. Lacy Construction Company, Ltd.
Robert Beserra, San Saba Construction Services, Inc.
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
T H E - �C 1 T Y O F
COPPELL
s
April 29, 2010
Arch Insurance Company
Three Parkway, 1601 Cherry St
Suite 1500
Philadelphia PA 19102
RE: Duke Lesley Addition, Infrastructure
Street Failure(s) on Dividend Dr. & Point West Blvd.
Dear Sir or Madam:
Bond No. 1030611
The two -year term on the above referenced maintenance bond began on February 21, 2008, which
was the date of final acceptance of the project. The City of Coppell has been in contact with the
owner, the general contractor and the subcontractor regarding workmanship covered under the
maintenance bond since before the term of the bond expired. See the enclosed letters, please.
During two separate meetings at the site, the contractor assured me that the problems discovered in
the paving on Dividend Drive and Point West Boulevard would be addressed, so that further
deterioration could be prevented. As of the date of this letter, those locations have not been
repaired and further damage is occurring. In order to protect our infrastructure and vehicles from
further damage, we must use maintenance bond monies to affect the needed repairs.
Please contact me at your earliest convenience to discuss how this will be accomplished.
Si
kjc7f5��
Davis
Office Phone`(972) 304 -3684
Fax: (972) 304 -3570
Enclosures
cc: Ken Griffin, P.E., Director of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
Keith Flowers, Duke Construction, Fax: 972/361 -6800
Tod Feazell, L.H. Lacy Construction Company, Ltd.