Loading...
Alexander Ct-SY070719(7/27/2007) Rhonda Adloo - FW: Alexandr `;ourt From: <brad.pickering @kimley - horn.com> To: <kgriffin @ci.coppell.tx.us> Date: 7/19/2007 2:22 PM Subject: FW: Alexander Court Attachments: Work map.PDF; CITY.zip Ken, I received the attached documents from Nathan D. Maier Consulting Engineers, Inc. today. After I have had a chance to review the model to see that it matches the approved LOMR submittal, I will forward a table of ultimate water surface elevations to you. Thanks, Brad W. Pickering, EIT (TX), CFM Kimley -Horn and Associates, Inc. • From: Odalys Johnson [mailto:ojohnson @ndmce.com] • Sent: Thursday, July 19, 2007 1:28 PM • To: Pickering, Brad • Cc: mboyd @ndmce.com • Subject: Alexander Court > Brad, • The attached model has an additional profile with the ultimate city • flows. We obtained the ultimate flows from Table E -1, pages E -7 and • E -8 of the "City -Wide Storm Water Management Study" by Albert H. Halff • Associates, Inc. • I have also included a pdf copy of the floodplain work map with the • 100 -yr ultimate floodplain. • Let me know if you need anything else. • Thanks, • Odalys Johnson, E.I.T. • Design Engineer • Nathan D. Maier Consulting Engineers, Inc. • (214)739 -4741 > <<Work map.PDF>> <<CITY.zip>> Page 1 0 O S te` S 70 W (�n u� O 00 7 I NOUp�rd s2xb� bbp3 6 J AB aVI NOINHa xsnos Fj E Y � K -3 d E 3 u <7 Zo ° <� w� o Z z 9 PQ o� P. as Ob 0 0� Z A B �gg \ � 6 e $ w 0 = W Z 9 LU \ J d^v'\o'.vMn9iox \sNR \N9iaxo \sett W x \x