Loading...
ST0701-LR100429REPORT OF SOIL - LIME MIXTURE PULVERIZATION I gram Consulting Engineers & Scientists 8901 Carpenter Fnvy., Suite # 100 Dail., Tn" 75247 (214) 630 -1010 Date of Service: 04/29/10 Client: City of Coppell TX PO Box 9478 Coppell, tX 75019 Contractor: Lacy Constriction Test Location: Northbound on Southwestern Blvd fiā€¢otn Sta. 9 +00 to Sta. 13 +50 Test Method: NCTCOG Report No.: 94091193.0153 Project No.: 94091193 Project: Southwestern Boulevard Coppell Road to Grapevine Creek Coppell, TX Page No.: Specification Requirements: Minimum Passing 1 -3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist TEST NO. LOCATION 1 -3/4" SIEVE % PASSING #4 SIEVE % PASSING 1 Southwestern Blvd., Sta. 10 +50 100 63 2 Southwestern Blvd., Sta. 12 +00 100 64 3 Southwestern Blvd., Sta. 13 +50 100 60 Technician: J. Perez Report Distribution: (1) City of Coppell TX (1) City of Coppell TX (1) City of Coppell TX (1) Halff Assoc Inc (1) Lacy Construction (1) PacTrust Pacific Realty Associates LP sa This report is exclusively f'or the use of the client indicated above and shall not be reproduced in full without written approval of Terracon. CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091194.0073 Irerracon Service Date: 04/14/10 8901 Carpenter Frwy. Report Date: 04/29/10 Revision 1 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creels to Beltline Road Coppell, TX Project Number: '94091194 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: 1701 Supplier: Lattimore Batch Time: 1138 Plant: 6 Truck No.: 1112 Ticket No.: 6368774 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 4 3 -5 4.4 3 -6 89 90 146.8 Laboratory Test Data Set Specimen Diameter Area Date No. ID (in) (sq in) Received 1 1 6.00 28.27 04/15/10 1 2 6.00 28.27 04/15/10 1 3 6.00 28.27 04/15/10 1 4 6.00 28.27 04/15/10 Sample Information Sample Date: 04/14/10 Sample Time: 1240 Sampled By: Julio R. Perez Weather Conditions: Sunny Accumulative Yards: 4.5 Batch Size (cy): 4.5 Placement Method: Direct Discharge Water Added Before (gal):0 Water Added After (gal): 0 Sample Location: Sta. 2 +45 Placement Location: Inlet Wall, northbound Southwestern Boulevard Age at Date Test Tested (days) 04/21/10 7 04/28/10 14 05/12/10 28 05/12/10 28 Maximum Compressive Load Strength Fracture (lbs) (psi) Type 109,590 3,880 2 123,230 4,360 2 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Julio R. Perez Started: 1100 Reported To: Finished: 1400 Contractor: Lacy Construction Report Distribution: Reviewed By: (1) PacTrist Pacific Realty Associates LP (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Constriction Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 5- 21 -09, Rev.3 Page I of I FIELD DENSITY TEST REPORT Ik Rrracon Report Number: 94091 194.0083 Service Date: 04/27/10 8901 Carpenter Frwy. Report Date: 04/29/10 Dallas, TX 75247 214 -630 -1010 Reg No: F -3272 Client Project PacTrust Pacific Realty Associates LP Southwestern Boulevard Attn: Matthew Oyen Grapevine Creek to Beltline Road 15350 Southwest Sequoia Pkwy Ste 300 Coppell, TX Portland, OR 97224 Project Number: 94091194 Material Information Lab Test Data Project Requirements Optimum Max. Lab Water Dry Unit Water Minimum Mat. Proctor Laboratory Content Weight Content Compaction No. Ref. No. Classification and Description Test Method ( %) (pcf) ( %) ( %) 1 94091 194.0012 Brown clay (lime treated) ASTM D698 30.2 88.1 -2/ +4 95 Field Test Data Probe Wet Water Water Dry Unit Percent Test Lift / Mat. Depth Density Content Content Weight Compaction No. Test Location Elev. No. (in) (pcf) (pcf) ( %) (pcf) ( %) Southwestern Boulevard, West Bound 86 Sta.2 +50 Final 1 6 109.9 25.0 29.4 84.9 96 87 Sta. 31 +14 Final 1 6 113.3 26.8 31.0 86.5 98 88 Sta.29 +00 Final 1 6 114.5 29.0 33.9 85.5 97 Bullock Court 89 Sta. 1+22 Final 1 6 109.8 24.7 29.0 85.1 97 Gauge ID: 31787 Comments: Test results on this report meet project requirements as noted above. Services: Perform in -place density and moisture content tests to determine degree of comp condition. Terracon Rep.: .Julio R. Perez Started: 1330 Reported To: Finished: 1700 Contractor: Lacy Construction Report Distribution: (I) Pac"rrust Pacific Realty Associates LP (1) City or Coppell TX Reviewed By: (1) City ol'Coppell TX (2) HaIrP Assoc Inc (1) Lacy Construction Test Methods: ASTM D6938 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007.4- 30-01), am2 Page I of I Senior Project Manager