Loading...
SS9402C-CS 980331MEMORANDUM Date: March 31, 1998 To: Ken ~ City From: .Ftm Wkt, City Subject: ~ PIease initiate the process for the reconstruction of Bethel Road as soon as poss~ole in accordance with our Purchasing Manual. However, keep in mind the fact that I consider this an emergency project that is made necessary by continuing unforeseen damage to public property, and is an item necessary to preserve and protect the health or safety of the residents of our city. I would ask you to u611~e any and all means for expediting the completion of this project, including outside consultants for design purposes and any other measures necessary in order to complete the project in a timely manner. I do not believe we can wait any longer for the waterline contractors to step forward and provide us the required service, but we need to carry out our legal measures related to that situation in an expedient If you have any questions regarding the direction I have asked you to take, please do not hesitate to contact me.