Loading...
Apostles-CS 970606 ~~~~~ The City With A Beautiful Future Jack Furlong, P.E. Albert Halff & Associates 4000 Fossil Creek Blvd. Fort Worth, Texas 76137 P.O,. Box 478 Coppell, Texas 75019 214-462-0022 June 11, 1997 1ZE: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A Development Fee Assessment Dear Mr Furlong: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $8,310.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our offic so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, G~~ Atul I. Patel, E Graduate Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services L~;VELOPMENT FEE TABLi Project: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A Date: 6/11 /97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,500.00 $4,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100 % due at Issuance of Water Meter) Water Meter Fee (Domestic) $144.38 (100% due at Issuance of Water Meter) Water Meter Fee (Inigation/Fireline) $1,551.90 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100 % due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2, 250.00 $2, 250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100 % due prior to Council Approval) Roadway Impact Fee $1,560.00 $1,560.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $10, 356.28 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $8,310.00 G.. JELOPMENT FEE WORKSHE~ ~' PROJECT: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A DATE: 6/ll/97 Water Impact Fee: Domestic Meter(s): 1 - 1 1 /2 inch Irrigation Meter(s): 1 - 1 inch Fireline Meter(s): 1 - 6 inch = 5 ESU's = 2.5 ESU's = ESU's = 2.5 ESU's Total #: 10 ESU's @ $450.00 ea. $4,500.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. $150.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $144.38 $144.38 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ $57.75 $57.75 Total #: 0 Additions! Irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meters} @ $1,494.15 $1,494.15 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. $30.00 f 100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. $70.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 5 @ $450.00 ea. $2,250.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page i Dtr/ELOPMENT FEE WORKSHEE ~" Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ 5150.00 /Lot NIA NIA Multi-family @ $75.00 /Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N!A Single-family @ $350.00 /Lot N/A N/A Multi-family @ $350.00 /Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 /Lot N/A N/A Multi-family @ $1285.00 /Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $1,560.00 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way. available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way. available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment. development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROAD WAY IMPACT FEE CALCULA'><'10NS PROJECT: Corporation of the Episcopal Diocese of Dallas Additon, Lot 1, Block A DATE: 6/II /97 ROADWAY IMPACT FEE: Service Area 7 Cate ory ** Institutional Land Use ** ChurchlS na o ue Buildin Size (S . Ft.) 10,000 Develo ment Units ** Ip Vehicle Miles r Develo ment Unit ** 0.52 Fee r Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units} x (Vehicle Miles r Develo ment Unit} x (Fee r Vehicle Mile) _ $1,560.00 * (Figure 2 -Roadway Impact Fee Study) ** (Table 3 -Roadway Impact Fee Study) *** (Schedule 2, Page 3 -Roadway Impact Fee Study)