Apostles-CS 970606
~~~~~
The City With A Beautiful Future
Jack Furlong, P.E.
Albert Halff & Associates
4000 Fossil Creek Blvd.
Fort Worth, Texas 76137
P.O,. Box 478
Coppell, Texas 75019
214-462-0022
June 11, 1997
1ZE: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A
Development Fee Assessment
Dear Mr Furlong:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $8,310.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our offic
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely,
G~~
Atul I. Patel, E
Graduate Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
L~;VELOPMENT FEE TABLi
Project: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A
Date: 6/11 /97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $4,500.00 $4,500.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100 % due at Issuance of Water Meter)
Water Meter Fee (Domestic) $144.38
(100% due at Issuance of Water Meter)
Water Meter Fee (Inigation/Fireline) $1,551.90
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100 % due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2, 250.00 $2, 250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100 % due prior to Council Approval)
Roadway Impact Fee $1,560.00 $1,560.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $10, 356.28
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $8,310.00
G.. JELOPMENT FEE WORKSHE~ ~'
PROJECT: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A
DATE: 6/ll/97
Water Impact Fee:
Domestic Meter(s): 1 - 1 1 /2 inch
Irrigation Meter(s): 1 - 1 inch
Fireline Meter(s):
1 - 6 inch
= 5 ESU's
= 2.5 ESU's
= ESU's
= 2.5 ESU's
Total #: 10 ESU's @ $450.00 ea. $4,500.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea. $150.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $144.38 $144.38
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @ $57.75 $57.75
Total #: 0 Additions! Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meters} @ $1,494.15 $1,494.15
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $30.00 ea. $30.00
f 100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea. $70.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU' 5 @ $450.00 ea. $2,250.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Page i
Dtr/ELOPMENT FEE WORKSHEE ~"
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ 5150.00 /Lot NIA
NIA Multi-family @ $75.00 /Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N!A Single-family @ $350.00 /Lot N/A
N/A Multi-family @ $350.00 /Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A Single-family @ $1285.00 /Lot N/A
N/A Multi-family @ $1285.00 /Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $1,560.00
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way. available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees: Information not
Assessed for signage in the City's right-of-way. available at this time
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment. development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROAD WAY IMPACT FEE CALCULA'><'10NS
PROJECT: Corporation of the Episcopal Diocese of Dallas Additon, Lot 1, Block A
DATE: 6/II /97
ROADWAY IMPACT FEE:
Service Area 7
Cate ory ** Institutional
Land Use ** ChurchlS na o ue
Buildin Size (S . Ft.) 10,000
Develo ment Units ** Ip
Vehicle Miles r Develo ment Unit ** 0.52
Fee r Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units} x
(Vehicle Miles r Develo ment Unit} x (Fee r Vehicle Mile) _ $1,560.00
* (Figure 2 -Roadway Impact Fee Study)
** (Table 3 -Roadway Impact Fee Study)
*** (Schedule 2, Page 3 -Roadway Impact Fee Study)