Loading...
Apostles-CS 970611M. Jack Furlong, P.E. Albert Halff & Associates 4000 Fossil Creek Blvd. Fort Worth, Texas 76137 =z� y With A Beautiful Future FILE P.O. Box 478 Coppell, Texas 75019 214- 462 -0022 June 11, 1997 RE: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A Development Fee Assessment Dear Mr Furlong: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $8,310.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our offic so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, 4 Atul I. Patel, Graduate Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services LLVELOPMENT FEE TABi.E Project: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A Date: 6111197 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,500.00 $4,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $144.38 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $1,551.90 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $1,560.00 $1,560.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contr TOTAL $10,356.28 $8,310.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL L-VELOPMENT FEE WORKSHt� t PROJECT: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A DATE: 6111197 Water Impact Fee: Domestic Meter(s): 1 - 1 1/2 inch = 5 ESU's Irrigation Meter(s): 1 - 1 inch = 2.5 ESU's = ESU's Fireline Meter(s): 1 - 6 inch = 2.5 ESU's Total #: 10 ESU's @ $450.00 ea. $4,500.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. $150.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $144.38 $144.38 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation /Fireline): Total #: 1 Irrigation Meter(s) @ $57.75 $57.75 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meter(s) @ $1,494.15 $1,494.15 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation /Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. $70.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 5 @ $450.00 ea. $2,250.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 1 Dr-VELOPMENT FEE WORKSHEC f Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single- family @ $150.00 / Lot N/A N/A Multi- family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) • Preliminary plat approved after June 23, 1992: N/A Single- family @ $350.00 / Lot N/A N/A Multi- family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) • Preliminary plat approved after October 26, 1993: N/A Single- family @ $1285.00 / Lot N/A N/A Multi- family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $1,560.00 Street Lighting Fees: Information not Assessed for lighting in the City's right -of -way. available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right -of -way. available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment. development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULAt'IONS PROJECT: Corporation of the Episcopal Diocese of Dallas Additon, Lot 1, Block A DATE: 6111 197 ROADWAY IMPACT FEE: Service Area * 7 Category ** Institutional Land Use ** Church/Synagogue Building Size (S q. Ft.) 10,000 Develop ment Units ** 10 Vehicle Miles per Development Unit ** 0.52 Fee per Vehicle Mile * ** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) = $ * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) * ** (Schedule 2, Page 3 - Roadway Impact Fee Study) AIlIU1V7`lilfl; �.'