Apostles-CS 970611M.
Jack Furlong, P.E.
Albert Halff & Associates
4000 Fossil Creek Blvd.
Fort Worth, Texas 76137
=z�
y With A Beautiful Future
FILE
P.O. Box 478
Coppell, Texas 75019
214- 462 -0022
June 11, 1997
RE: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A
Development Fee Assessment
Dear Mr Furlong:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $8,310.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our offic
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, 4
Atul I. Patel,
Graduate Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
LLVELOPMENT FEE TABi.E
Project: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A
Date: 6111197
TOTAL
AMOUNT DUE
FEES DUE
PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee
$4,500.00
$4,500.00
(100% due prior to Council Approval)
Water Tap Inspection Fee
$150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
$144.38
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)
$1,551.90
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
$30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit
$70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
$2,250.00
$2,250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Park Fee
$0.00
N/A
(100% due prior to Council Approval)
Roadway Impact Fee
$1,560.00
$1,560.00
(100% due prior to Council Approval)
Street Light Fee
Information not
(100% due prior to Acceptance of Project
available at this time
Street Sign Fee
Information not
(100% due prior to Acceptance of Project
available at this time
Construction Inspection Fee
Need submittal of
development contr
TOTAL
$10,356.28
$8,310.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
L-VELOPMENT FEE WORKSHt� t
PROJECT: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A
DATE: 6111197
Water Impact Fee:
Domestic Meter(s): 1 - 1 1/2 inch = 5 ESU's
Irrigation Meter(s): 1 - 1 inch = 2.5 ESU's
= ESU's
Fireline Meter(s): 1 - 6 inch = 2.5 ESU's
Total #: 10 ESU's @ $450.00 ea.
$4,500.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
$150.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $144.38
$144.38
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation /Fireline):
Total #: 1 Irrigation Meter(s) @ $57.75
$57.75
Total #: 0 Additional Irrigation Meter(s) @
$0.00
Total #: 1 Fireline Meter(s) @ $1,494.15
$1,494.15
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $30.00 ea.
$30.00
(100% due prior to issuance of water meters)
Irrigation /Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea.
$70.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU' 5 @ $450.00 ea.
$2,250.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
$50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
$50.00
(100% due prior to issuance of building permit)
Page 1
Dr-VELOPMENT FEE WORKSHEC f
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single- family @ $150.00 / Lot
N/A
N/A Multi- family @ $75.00 / Unit
N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
• Preliminary plat approved after June 23, 1992:
N/A Single- family @ $350.00 / Lot
N/A
N/A Multi- family @ $350.00 / Unit
N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
• Preliminary plat approved after October 26, 1993:
N/A Single- family @ $1285.00 / Lot
N/A
N/A Multi- family @ $1285.00 / Unit
N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
$1,560.00
Street Lighting Fees:
Information not
Assessed for lighting in the City's right -of -way.
available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Information not
Assessed for signage in the City's right -of -way.
available at this time
(See attached fee calculations if applicable)
Construction Inspection Fees:
Need submittal of
A copy of the development contract must be submitted for assessment.
development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULAt'IONS
PROJECT: Corporation of the Episcopal Diocese of Dallas Additon, Lot 1, Block A
DATE: 6111 197
ROADWAY IMPACT FEE:
Service Area *
7
Category **
Institutional
Land Use **
Church/Synagogue
Building Size (S q. Ft.)
10,000
Develop ment Units **
10
Vehicle Miles per Development Unit **
0.52
Fee per Vehicle Mile * **
$300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) = $
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
* ** (Schedule 2, Page 3 - Roadway Impact Fee Study)
AIlIU1V7`lilfl; �.'