Loading...
ST9904-CS081117Page 1 of 1 Hankins, Steve From: Dennis, Bryan Sent: Monday, November 17, 2008 4:35 PM To: Hankins, Steve Cc: Robinson, Sherrie; Tom Kramer; Lucido, Tony; mkrueger @hntb.com; Hemphill, Eric; Hofmann, Roy Subject: 121Tollway Landscaping in Coppell Attachments: 20081171 Coppell Noise Wall Screening.pdf Steve - As requested attached for your use is a Level "E" estimate for providing landscape along the noise walls on 121 in Coppell. Here are a few notes with regards to the Level "E" estimate. 1.) This assumes single row of planting at 4 ft. o/c 2.) Offset from wall approx. 5 ft. to allow 4 ft. drip irrigation setback. 3.) Assumed a 7 ft. wide mulch bed with approx. 5 ft. width prepared with compost. A portion of the walls in the vicinity of the main gantries may be too close to the frontage road to plant. For purposes of this estimate we have included the full lengths shown on the noise wall exhibits for the walls in Coppell. The estimate does not include the walls shown on the exhibits that are east of IH35. Please feel free to contact either myself or Tom Kramer if you have any further questions Bryan J. Dennis HNTB Corp. North Texas Tollway Authority General Engineering Consultant NTTA Service Center 1080 Ohio Drive Plano, TX 75093 (214) 224 -2281 Fax: (214) 224 -2250 Cell: (214) 551 -2301 E -mail: bdennis _.ntta.org 11/17/2008 TOTAL PROJECT COST 121 TOLLWAY - SCREENING OF NOISE WALLS IN COPPELL PRELIMINARY /CONCEPTUAL ESTIMATE OF PROBABLE COSTS OF CONSTRUCTION LEVEL "E" SCHEMATIC PHASE ESTIMATE Created By: TGK Date: 11/17/2008 Checked by: TGK Date: 11/17/2008 Official Estimate Date: 11/17/2008 Mid -point of Anticipated Construction: 1 /1/2010 ITEM ITEM QUANTITY UNIT UNIT SUBTOTAL NO. DESCRIPTION 10,358 LF COST COST 4.0 MISCELLANEOUS 4 Sound Wall Screening - Landscape Construction 10,358 LF $ 39.73 $ 411,523 4 Sound Wall Screening - 24 Month Maintenance 10,358 LF $ 12.73 $ 131,857 6 Engineering /Architectural Advanced Planning (0.5 %) SUBTOTAL MISCELLANEOUS $ 543,381 CONSTRUCTION COST SUMMARY SUBTOTAL CONSTRUCTION $ 543,381 Mobilization (10 %) $ 54,338 Sub -Total Construction $ 597,719 Construction Contingency (20 %) $ 119,544 TOTAL CONSTRUCTION COST (CURRENT DOLLARS) $ 717,262 ESCALATED TOTAL CONSTRUCTION COST TO MID -POINT OF CONSTRUCTION (ENR CCI 1 $ 781,758 6.0 AGENCY COSTS (CURRENT COST) Total Construction Cost Current Cost $ 717,262 6 Administrative NTTA Personnel (0.5 %) $ 3,586 Feasibility Studies (0.5 %) GEC (I%) $ 7,173 6 Engineering /Architectural Advanced Planning (0.5 %) EIS/EA Schematic (1%) PS &E (say 10 %) $ 71,726 Surveying (1 %) $ - Geotechnical (1%) 6 Legal Consulting Fees (1 %) 6 Electronic Tolling Equipment Mainlane Plaza Tolling Equipment ($83,000 per Lane) Ramp Plaza Tolling Equipment ($83,000 per Lane) Level "E" Estimate Page 1 DRAFT VERSION 11/17/2008 ITEM ITEM UANTITY UNIT UNIT SUBTOTAL NO. DESCRIPTION Design COST COST 6 R.O.W. $ Land and Displacement $ _ R.O.W. Acquisition Consultant (0.5 %) _ 6 Construction Support $ Construction Management (say 12 %) $ 86,071 Materials Testing (1 %) 4,691 6 Utility Relocations - Franchise and Municipal (Assume $1,000,000 per Mile) $ - 6 Reimbursements (1 %) 6 Unique Features $ _ Sub -Total Agency Cost $ 168,557 Agency Cost Contingency (20 %) $ 33,711 TOTAL AGENCY COST (CURRENT DOLLARS) $ 202,268 ESCALATED TOTAL AGENCY COST TO MID -POINT OF CONSTRUCTION (ENR CCI PROJECTION)l $ 220,456 TOTAL PROJECT COST SUMMARY (CURRENT DOLLARS) Total Construction Cost $ 717,262 Total Agency Cost $ 202,268 TOTAL PROJECT COST (CURRENT DOLLARS) $ 919,531 TOTAL PROJECT COST SUMMARY ESCALATED Escalated Total Construction Cost $ 781 Escalated Total Agency Cost $ 220,456 TOTAL PROJECT CO ST (ESCALATED) $ 1,002,213 CAPITALSOFT COST DISTRIBUTION Professional Services $ 9,381 Planning $ _ Design $ 93,811 Right -of -Way $ _ Utilities $ _ Construction/Installation $ 894,331 NTTA Internal Costs $ 4,691 Maintenance/Warranty TOTAL PROJECT COST $ 1,002,213 SAY $ 1,002,000 Notes: 1) The unit costs to construct this facility are based on the unit prices of recently constructed similar facilities and/or the latest average unit 2) Contingencies are applied to construction and agency cost. 3) Does not include costs to stabilize bed areas where flow thru wall drainage slots exist 4) Does not include cost of water Level "E" Estimate Page 2 DRAFT VERSION 11/17/2008 DRAFT VERSION - FOR REVIEW UNIT PRICE CALCULATION SCREENING OF SH 121 NOISE WALLS IN COPPELL DESCRIPTION UNIT APPROX UNIT AMOUNT QUANTITIES PRICE GENERAL USE COMPOST CY 1.2 $ 22.00 $ 26.40 IRRIGATION SYSTEM SY 8.8 $ 27.58 $ 242.70 MULCH SY 15.6 $ 2.75 $ 42.90 PLANT MATERIAL (3 GAL)(SHRUB) EA 5 $ 15.00 $ 75.00 RIPRAP (MOW STRIP) (51N) CY 0.5 $ 675.00 $ 337.50 TEMPORARY SEDIMENT CONTROL FENCE LF 20 $ 3.50 $ 70.00 SUBTOTAL $ 794.50 CONSTRUCTION COST TOTAL PER 20 LF WALL $ 794.50 CONSTRUCTION COST TOTAL PER 1 LF WALL Is 39.73 PLANT MAINTENANCE COST PER 20 LF WALL MO 24 9.05 $ 217.20 IRRIGATION SYSTEM OPER AND MAINT PER 20 LF WALL MO 24 1.56 $ 37.44 SUBTOTAL $ 254.64 MAINTENANCE COST TOTAL PER 20 LF WALL $ 254.64 MAINTENANCE COST TOTAL PER 1 LF WALL $ 12.73 CONSTRUCTION AND 24 MONTH MAINT PER LF WALL 1 1 $ 52.46 REFER TO TOTAL PROJECT COST ESTIMATE Notes: 1.) Plants spaced @ 4' o.c. for a single row of planting 2.) Offset from wall approx. 5' to allow 4' drip irrigation setback 3.) Assumed a 7' wide mulch bed with approx. 5' wide prepared compost Prepared by: HNTB Corp Backup Page 1 11/17/08 DRAFT VERSION - FOR REVIEW SH 121 COPPELL WALL SCREENING ESTIMATE NOISE BARRIERS WEST OF DENTON TAP ROAD LENGTH 1A 1,536 LF 1B 672 LF 3A 1,312 LF — 3B 896 LF — SUBTOTAL 4,416 LF NOISE BARRIERS EAST OF DENTON TAP ROAD TO WEST OF MACARTHUR BLVD 2A 1,184 LF- 2B 606 LF 4A 1,056 LF 4B 576 LF 4C 1,656 LF 4D 864 LF SUBTOTAL 5,942 LF 17 ¢ 2�J �,¢ov TOTAL 10,358 LF Prepared by: HNTB Corp Backup Page 2 11/17/2008 NCTCOG Q,.( & 1 i8 /6 Page I of I H o l ly 1. A e fl r '"'A x 'V ew D' 0) c M C;'XCx>'aIe or I Oak Bert- U "; M C-eeK•*OW L Cass o^ Or J A U �r' 1 9t D jr Ro�^--' Grove R(, 77 R"d Grove Rd r ; Rwrq Qfove-ftd - ' a Roard.0 vve Hd 31a R.�'ge Nja v sla R age Ma U 41 rr 121 Ir 41 r S .3 pp t CA "a "k A p ill LL 7 H Y, (J'Jad D -; Y; .1, %%, L Fa DISCLAIMER N NCTCOG Ma This data has been compiled for NCTCOG. Various ps official and unofficial sources were used to gather this information. Every effort was made to ensure the www.dfwmaps.com accuracy of this data, however, no guarantee is given or implied as to the accuracy of said data. http://www.dfwmaps.com/print.asp?Layers=on&SHADECITY=on 11/13/2008 i sii 1 21 " nurr�sa PROPOSED NOISE BARRIER % Y 121 S11 Noise Barrier 213 PROPOSED NOISE BARRIER Along the SH 121 SB Main Lanes LEGEND Lo EG N MAP and Inside the SH 121 SB Frontage Road NI) Height: 8 ft SH 121 PROJECT LIMITS x Length: 606 ft FROM 0,23 MILE WEST OF BLTSINES. r SH 121 TO DNT y PROPOSED NOISE BARRIERS N 0 1.000 ^ c4 w. ` ° ..'4 N +1� � tt Feet Noise Barrier 2A Along the SFi 121 SB Main Lana ,. Height: 8 ft :. „ Length: 1,184 ft 1� ♦ ® �� �� �� f 5�• `�' Fiser,+i +4hta Pores• nr Noise Barrier 4A Along the SH 121 NB Main Lanes Height: 8 ft Length: 1,056 It i y • " ,.- ", Noise Barrier 4B Along the SH 121 NB Frontage Road A • ♦' ' jam'► Y., . Height: 8ft i a♦ - Length: 576 ft • `.�Y "� .� «�� '� PR END Noise Barrier 4C 12t I Along the SH 121 NB Main Lanes - p Height: 1,6 Len gth: 1,656 fl �> Noise Barrier 4D — Along the SH 121 NB Main Lanes PROPOSED NOISE PROPOSED NOISE I O N": At•� r , BARRIERS No. 5 & 6 BARRIER No. 7 IIeight: 8 ft Length: 864 ft PROJECT / .. BEGIN 121 1 DmIon counp nl I C Cnu� ' •.r T =a.e ; ".." . �. =,:';. .. ✓ Dallas Count} PROPOSED NOISE BARRIERS No. 1A, 1B, {. 2/., 2B, 3A. 38, 4A, 48, R� } 4C&4O • / SH 121 PROPOSED NOISE. BARRIER LOCATION MAP LEGEND SH 121 PROJECT LIMITS FROM 0.23 MILE WEST OF BUSINE SH 121 TO DNT PROPOSED NOISE BARRIERS N 0 1.000 �f Fe t Noise Barrier 5 Between the ROW and SH 121 SB Frontage Road Height: 14 ft Length: 306 ft A ' � k ® d p� I ' : 1 a ' t S •'} } '�` 40 0 . '1ti ♦� ss �+. �,, f ,� t" `Noise Burrlcl 7 f- ': Along the SH 121 SB Main I,ancs; ' a• = Height: 8 ft i s ' Length: 1.024 ft i _ 4 n ' v . _ L�►�tt�t,pG Noise Barrier 6 Fold V's Between the ROW and " "� Awe �• S1 1 SB Frontage Roa11 " ?qp- " eig ht : ft : 14 Length: 306 ft `C*4+ PROJECT END { 121 y � - - PROPOSED NOISE PROPOSED NOISE BARRIERS No. S 8 6 BARRIER No.? PROJECT - -. BEGIN ivu ' J DCnloo Caun1+ Collin Counl \ " Dallas C'ouniv .' PROPOSED NOISE BARRIERS No. IA. 18, 2A. 2& 3A. 38. 4A. 48. "Ills,