Loading...
ST9904 unknown date (3)a.--3 Fkiarc T Mar—" M&UM.-= ;;;�m Ez- m a 41-6 city of coppell Engineering Department "Working together for a better Community" city of coppell NTTA Proposal Sandblast new sound walls and leave them in their natural gray color. All existing walls constructed by TxDOT would remain as they exist today (light tan color). At the end of the life cycle for the existing TxDOT walls (paint is in disrepair and needs maintenance), NTTA would sandblast all paint off TxDOT walls so they would be gray like the NTTA walls. Engineering Department "Working together for a better Community' -city of coppell 01/12/2009 NTTA wall that has been sandblasted. This removes most of the light and dark areas of the concrete so the gray color is more uniform. 11 Engineering Department -Working together for a better Community" city of coppell 0 1� 2D, NTTA wall that has not been sandblasted. Note the light and dark areas of the concrete that make the gray colorless uniform. Engineering Department __41 r ..Working together for a better Community- rK city of coppell Location where new NTTA sound wall abuts existing TxDOT painted wall. 01/12/2009 Engineering Department --Working together for a better Community" city of coppell am W­_____ It's hard to see, but the left side of the wall is painted and NTTA is sandblasting the paint off. Engineering Department "Working together for a better Community city of coppell Possible Scenarios 1. Continue to push NTTA to paint the sound walls, at NTTA cost. 2. Have NTTA redistribute landscaping to intersecting streets, not just at Denton Tap and MacArthur. Also, have NTTA add the ..oak leaves" portion of the city logo periodically along the wall with the same color as the existing TxDOT underpasses. All at NTTA cost. 3. Work with NTTA to paint the sound walls, at city cost. (Estimate - $591,000 / $125,000 initial painting and $466,000 invested for future maintenance.) 4. Other options ? ? ? ? ? ? ?? Engineering Department -Working together for a better Community" city of coppell Unpainted NTTA sound wall 1a:1, j� Engineering Department r� "Working together for a better Community" rZ, city of coppell Possible Scenarios 1. Continue to push NTTA to paint the sound walls, at NTTA cost. 2. Have NTTA redistribute landscaping to intersecting streets, not just at Denton Tap and MacArthur. Also, have NTTA add the "oak leaves" portion of the city logo periodically along the wall with the same color as the existing TxDOT underpasses. All at NTTA cost. 3. Work with NTTA to paint the sound walls, at city cost. (Estimate - $591,000 / $125,000 initial painting and $466,000 invested for future maintenance.) 4. Other options ?? ? ?'' ? ?`' 1� Engineering Department G� "Working together for a better Community iG -,'7 A' Existing Noise Barrier Wall TW "'11tli 'I I,� "--xisting Noise Barrier Wall Fes,� )Is- t9 x city of coppell Possible Scenarios 1. Continue to push NTTA to paint the sound walls, at NTTA cost. 2. Have NTTA redistribute landscaping to intersecting streets, not just at Denton Tap and MacArthur. Also, have NTTA add the "oak leaves" portion of the city logo periodically along the wall with the same color as the existing TxDOT underpasses. All at NTTA cost. 3. Work with NTTA to paint the sound walls, at city cost. (Estimate - $591,000 / $125,000 initial painting and 5466,000 invested for future maintenance.) 4. Other options ? ? ? ? ? ? ?? Engineering Department `Working together for a better Community" city o f coppell Unpainted NTTA sound wall Engineering Department ..Working together for a better Community 7\ AA_;Q3 A" city of coppell Possible Scenarios 1. Continue to push NTTA to paint the sound walls, at NTTA cost. 2. Have NTTA redistribute landscaping to intersecting streets, not just at Denton Tap and MacArthur. Also, have NTTA add the ``oak leaves" portion of the city logo periodically along the wall with the same color as the existing TxDOT underpasses. All at NTTA cost. 3. Work with NTTA to paint the sound walls, at city cost. (Estimate - $591,000 / $125,000 initial painting and $466,000 invested for future maintenance.) 4. Other options ? ? ? ? ? ? ?? Engineering Department "Working together for a better Community" city of coppell Seeking Direction on various options shown or any other suggestions on what position to take and what to present and commit to at the January 1511' NTTA meeting. Engineering Department /a "Working together for a better Community" ��