Loading...
ST9904-CS080627DRAFT Pout N. wageman cbairrnan Kenneth Barr Dirmtor Gary 9a so Dire -tor Rots Day Direr-bor David R. Denison t r &Aur Mtchael Nowels iirect.er Robert Shepard Diree:trar Ata n E, Sims Victor Vendergri f DiirkyAor rge Figuaredo Executive Dirtztor Rkk Herrington v ExCec'Kive D'x,wtor RO. Box 260729 ft", TX 75026 59 0 W. Pia " , Parkway I uite too Piano, TK 75093 214.461-2.,OW 214.52826 (Fax) wvm;ntta.orag June 27, 2008 cPROPERTY_ OWNER _NAME>> «OWNER STREET» «OWNER CITYZIP» RE: Proposed Noise Barriers along State Highway (SH) 121- Segments 1 and 2 in Dallas, Denton and Collin Counties, Texas. Dear Property Owner, In order to remain consistent with the Texas Department of Transportation (TxDOT) Dallas District wide policy regarding construction of noise barriers; the North Texas Tollway Authority (NTTA) is hereby informing you that all of the previously proposed noise barriers for SH 121 from 0.23 mile west of Business SH 121 to the Dallas North Tollway (DNT), as presented in the environmental assessment for the project, will be constructed. It is estimated that construction of Noise Barriers 1A, 1B, 2A, 2B, 3A, 3B, 4A, 4B, 4C, 4 D, 5, 6, and 7 will be completed by the end of 2008. More detailed information on the barriers is listed below. Please see attached Noise Barrier Location Map. Noise Barrier No. Length in feet Height in feet Location 1A 1,536 5 Along the southbound mainlanes 1 B 672 5 Along the exit ramp 2A 1,184 8 Along the southbound mainlanes 26 606 8 Along the southbound mainlanes and inside the southbound frontage road 3A 1,312 8 Along entrance ramp and the northbound mainlanes 36 896 8 Along the northbound mainlanes 4A 1,056 8 Along the northbound mainlanes 46 576 8 Along the northbound frontage road 4C 1,656 8 Along the northbound mainlanes 4D 864 8 Along the northbound mainlanes 5 306 14 Along the southbound right -of -way line in continuation of the existing noise barrier 6 306 14 Along the southbound right -of -way line in continuation of the existing noise barrier 7 1,024 1 8 Along the southbound mainlanes Source: Signing, Pavement Marking and Noise Barriers Plans (January 2008). 1 of 2 If you have any questions or require additional information, please contact Holly Becka by phone at 972 - 628 -3042 or by e -mail at SH121Ca.ntta.org Sincerely, Elizabeth Mow, P.E. NTTA Director of Project Delivery Cc: Brian Barth, P.E. - TOOT Stan Hall, P.E. - TOOT Claudio Dallavalle, P.E. — HNTB Steve Hankins, P.E. - HDR Dennis Satre, P.E. — Halff Associates Inc. Mike Dillow, P.E. - KBR Keith Wallace, P.E. — KBR Holly Becka - HNTB Maria G. Pettit, P.E. - HNTB 2 of 2