Loading...
ST9904-CS090304March 04, 2009 Mr. Ken Griffin, PE Director of Engineering /Public Works City of Coppell 255 Parkway Boulevard Coppell, TX 75019 -9478 Subject: Hydraulic Study of SH 121 Crossing at Denton Creek. Dear Mr. Griffin: We are currently under contract with Texas Department of Transportation to develop final plans for the reconstruction of SH 121 from Tarrant County Line to Denton Creek. As part of this plan preparation, the URS Team has conducted a Hydraulic Study for SH 121 improvements at Denton Creek. This study was performed by our Sub - Consultant, Civil Associates, Inc (CAI). Since you are the local Flood Plain Administrator, CAI had coordinated with you in September 2008 regarding this study. Per your request, we are providing you with a final signed and sealed copy of the Hydraulic Study for your records. If you have any questions regarding our submittal, please call Allen Xu, PE, at 214 - 703 -5151 or myself at 972 - 888 -2029. Very truly yours, Krishna Peap yell - I'.E. Project Manager Attachments: Signed and Sealed Copy of the Hydraulic Report. Cc: Judy Bosquez, PE, Texas Department of Transportation Allen Xu, PE, Civil Associates, Inc. URS Corporation Graj!§tone Centre 3010 LBJ Freeway, Suite 1300 Dallas, TX 75234 Tel: 972.406.6950 Fax: 972.406.6951