SS9301-ES 920828 · WO TANT'-.MESBL...E
· Coppell, Texas 75019
~.. . ~~~. ..o.~~ Future 214-462-0022
OF ' <'~';l ~ ' ' ' ~ .- '4 ~
PHONE { "~ 'i ~NSION
. ~ ~
O MOBILE '"
~ ~DE NUM$ ~aE ~ ~ALL
,~k ~~ ~ ~ ~1 ~~ ining both pe~ent ~d tempor~' e~ement, for the cons~ctio.
~~~ ~f ~~ ~ ~lto M~A~hur Blvd. The p e~ent e~ement will be fu~er away
~ fi' ~] ~ ~ ~ n '- ~ment is necess~ so the sewer line c~ be realignS. Because of
' ~ J ~ i ~-~ a. ~ ~ er ~jacent to ~e french, the Ci~ is requesting that a tempor~
, SI~NED' ~ L-] . ~ -- ~ V]~:. ~uration of ~c project. Thc tcmpor~ cons~ction e~cment will
TOPa ~ ~~ ~l~ ~ -- / ~al, to sto~ new mate6~s p6or to installation ~d to m~euver
~ ' ' ~ ' ~ ~ ~ew sewer trunk main. The tempor~ e~ement on your prope~
~v.s[~ts or just me t~ comer of your prope~.
Your cooperation in working with the CiW to provide both the pe~ent ~d a tempor~ cons~etion emement would
be greatly appreciated ~d also would be ~ ~set in expediting the ~mal cons~ction of this project.
Aaached, I have provided a copy of both thc pe~ent ~d thc tempor~ cons~ction e~ement. Thc ememcnts should
be signed ~d netted ~d returned to the Ciw of Coppeii. The Cib' of Coppell h~ sever~ not,es on st~ ~d would
be happy to not~ this document free of ch~gc at your request.
If you should have ~y questions concerning ~c project, the timing of the project, what will happen to the tcmpor~
construction e~ement both du6ng ~d ~er cons~ction, or ~y other questions su~ounding the installation of this sewer
t~nk main, ple~c feel free to cont~t me at 393-1016 to obtain fu~her info~ation.
Th~k you for your consideration of this request ~d if you should have ~y questions in the fume, ple~c feel free to
contact me.
Sincerely,
P.E.
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, Cib' Manager
I
Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
August 18, 1992
Mr. Donald Brewer ~ ,~.~ ..~_~ ~ow~ ,
775 Pelican Lane
Coppell, TX 75019
RE: Grapevine Creek Sewer Main - Temporary and Permanent Construction Easements
Dear Mr. Brewer:
The City of Coppell is currently in the process of obtaining both permanent and temporary easements for the construction
of a sewer trunk main from Denton Tap Road eastward to MaeArthur Blvd. The permanent easement will be further away
from your house than the existing easement. The easement is necessary so the sewer line can be realigned. Because of
the depth of the sewer line and the need to maneuver adjacent to the trench, the City is requesting that a temporary
construction easement be granted to the City for the duration of the project. The temporary, construction easement will
be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver
equipment along the creek for the installation of the new sewer trunk main. The temporary easement on your properb~'
consists of just the far comer of your property.
Your cooperation in working with the City to provide both the permanent and a temporary construction easement would
be greatly appreciated and also would be an asset in expediting the actual construction of this project.
Attached, I have provided a copy of both the permanent and the temporao' construction easement. The easements should
be signed and notarized and returned to the City of Coppeil. The City of Coppeil has several notaries on staff and would
be happy to notarize this document free of charge at your request.
If you should have any questions concerning the project, the timing of the project, what will happen to the temporary
construction easement both during and after construction, or any other questions surrounding the installation of this sewer
trunk main, please feel free to contact me at 393-1016 to obtain further information.
Thank you for your consideration of this request and if you should have any questions in the future, please feel free to
contact me.
Sincerely,
M.
KMG/bd
cc: Steve Goram, Director of Public Works
Alan D. Ratliff, City Manager
I