Loading...
SS9301-ES 940523 ! ~l I~-r"~-./--~---/I--~--i i~"..--, I~/ /~J V-:~/ ff-?':/ /",C=,'~'~/=.--,-~-~/~-.~.'i ._. ~/ ,' , P.O. BOX 478 ~~~ ~ ~i ~=:~-:=: '. IL .. -' i~':-~=-J Coppeil. Texas 75019 ,'~/ ~ The City With A Beautiful Future 214-462-0022 May 23, 1994 Mr. Troy Nixon 312 Southwestern Blvd. Coppell, Texas 75019 RE: Grapevine Sanitary Sewer Trunk Main Project # SS 93-01 Temporary Construction Easement Dear Mr. Nixon: On August 18, 1992, a letter was sent to you concerning the need to have a temporary construction easement dedicated for the referenced project. The project in question is a sewer trunk main along Grapevine Creek from its intersection with Southwestern Boulevard to the intersection of MacArthur with Beltline Road. The sewer line is necessary for two reasons: 1) the current sewer system is a 12" line that is undersized to convey the current flows and the projected developed flows; 2) the sanitary sewer line will allow for the future development of southwest Coppell. The City currently has a twenty foot sanitary sewer easement across your property, as can be seen on the attached temporary construction easement document. However, to allow for the open cutting, maneuvering of equipment, storage of materials, etc., the City needs an additional 15 foot temporary construction easement across your property. This project has been under construction for approximately one year and currently the contractor is installing pipe in Bethel Road approaching Denton Tap Road. The contractor will begin installing pipe in Bethel Road on the west side of Denton Tap around June 1, 1994. Once the contractor begins working in ['~ T~ that section, it will be a very short time frame before he reaches your property. Therefore, it is imperative that the City be able to obtain the 15 foot temporary const,~,t~$~sement as soon as possible.~':' ~':' '":-x -;. :,-;.~ .'~ .5' I will be happy to meet with you to discuss this at your convenience or:.,-'l:caE be re~, 1016 to answer any questions you might have. Sincerely, ---~ -~.~ ........ '~-.~/..~./? ...... oe<. Kenneth M. Gdffin, P.E. ~"' .... ' '"'" ,,./~~"~.~/"- '~---'-~ Assistant City Manager/City Engineer ',. : .j?. i ',.,~ ;.~ _ , ~z ,.': J . ..... . -- . . ~O i~o×"-8 · ...._--i /~:--..-~.."~~:"~-- ~t:_':.~..-'-_'._'":.,',' -.< CopDe'. Texas 750'9 ~/ -' The C~ty W~th A Beaut,fui Future 2'4-~2-~u2~ .. August 18, 1992 Mr. Troy Nixon 312 Southwestern Blvd. Coppell, TX 75019 RE: Grapevine Creek Sewer Main - Temporary Construction Easements Dear Mr. Nixon: The City of Coppeli is currently in the process of obtaining both permanent and temporary easements for the construction of a sewer trunk main from Denton Tap Road eastward to MacArthur Blvd. The portion of the installation of the sewer trunk main adjacent to your property will be in an existing utility easement. However, because of the depth of the sewer line and the need to maneuver adjacent to the trench, the City is requesting that a temporary construction easement be granted to the City for the duration of the project. The temporary construction easement will be utilized to temporarily stock pile excavated material, to store new materials prior to installation and to maneuver equipment along the creek for the installation of the new sewer trunk main. Your cooperation in working with the City to provide a temperas3, construction easement would be greatly appreciated and also would be an asset in expediting the actual construction of this project. Attached, I have provided a copy of the temporary construction easement. The easement should be signed and notarized and returned to the City of Coppell. The City of Coppell has several notaries on staff and would be happy to notarize this document free of charge at your request. If you should have any questions concerning the project, the timing of the project, what will happen to the temporary. construction easement both during and after construction, or any other questions surrounding the installation of this sewer trunk main, please feel flee to contact me at 393-1016 to obtain further information. Thank you for your consideration of this request and if you should have any questions in the future, please feel free to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd Steve Goram, Director of Public Works Alan D. Ratliff, City Manager