Loading...
ST0702-AG100427AGENDA REQUEST FORM T H E.` 1 T Y. a F DEPT: Engineering COPPELL �` DATE: April 27, 2010 � k S ITEM #: 14 n WORK SESSION 1:1 CONSENT 0 REGULAR ITEM TYPE CONTRACT /BID or PROPOSAL ITEM CAPTION: Consider approval of Change Order Number 3 to the South Coppell Road (ST 07 -02) project in the amount of $61,997.33 for Drainage Channel work and intersection improvements at Coppell Road and Southwestern Blvd., as provided for in CIP funds; and authorizing the City Manager to sign all necessary documents. GOAL(S): EXECUTIVE SUMMARY: On June 9, 2009 council awarded a contract to JRJ Paving, LP in the amount of $1,326,827.79 for the reconstruction of South Coppell Road from Bethel Road to Southwestern Blvd. Since this award, two change orders have been approved that increased the contract amount by $68,446.50. We are requesting a third change order in the amount of $61,997.33. This will compensate the contractor for channel work that was shown in the original plans, as well as the improvements to the intersection of Coppell Road and Southwestern Blvd. FINANCIAL COMMENTS: Funds are available in the 2006 Street CIP accounts for this project. RECOMMENDED ACTION: ACTION TAKEN BY COUNCIL: Staff recommends approval of Change Order #3 in the amount of $61,997.33 and will be present to answer any questions. APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve M - Tunnell S - Brancheau Vote - 6 -0 Hino osa- Flores absent • Lib Ba J 2010.04.28 153228 - 05'00' #ChgeOrd3CoppellRd. -1 AR MEMORANDUM TO: Mayor and City Council VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works FROM: Keith R. Marvin, P.E., Project Engineer DATE: April 27, 2010 RE: Consider approval of Change Order Number 3 to the South Coppell Road (ST 07 -02) project in the amount of $61,997.33 for Drainage Channel work and intersection improvements at Coppell Road and Southwestern Blvd., as provided for in CIP funds; and authorizing the City Manager to sign all necessary documents. On June 9, 2009 council awarded a contract to JRJ Paving, LP in the amount of $1,326,827.79 for the reconstruction of South Coppell Road from Bethel Road to Southwestern Blvd. The award also included an $80,000.00 potential bonus set aside for early completion. Since this award, two change orders have been approved that increased the contract amount by $68,446.50. During the progress of construction, it was discovered that quantities established for the contract did not include a considerable amount of work necessary for the construction of an off -site drainage channel. That work was shown in the plans; however the quantities in the bid tabulation did not include these amounts. The two items in question are excavation and establishing grass. The original contract price for excavation was $7.88 per cubic yard, and we are adding 7,129 cubic yards with this change. The original contract price for grass was $4.73 per square yard, and we are adding 10,722 square yards with this change. We have negotiated with the contractor to try to minimize the cost of this change. We allowed him to dispose of the excavated material on city owned property, and he has reduced his price to $3.50 per cubic yard, or approximately half the original cost. We have also agreed to use hydromulch and curlex with seed rather than the block sod originally bid. Block sod will still be used in front of all homes and businesses along the road, just not in the vicinity of the channel and other city owned property. As a result of this, the added grass will also cost less than half the original contract amount on a per square yard basis. This change order also includes additional improvements in the intersection of Coppell Road and Southwestern Blvd. As paving has been completed on both sides of the intersection it has become apparent that the intersection itself is in a state of disrepair and requires removal and replacement of the paving. Unit pricing for the work necessary is included in the original contract, this change simply increases the quanity to include the area of the intersection. In addition to the extra work this change order includes additional time for completion of the project. As you know the weather has been unusually wet during the course of this project. The contractor has requested 82 additional days. We have verified 50 days they could not work due to weather. We have estimated that the additional excavation and grass work in the channel took 28 days. This is a total of 78 additional days, and brings their contract completion date to April 30, 2010. The wording of the contract ties their incentive for early completion to the original contract time, which means they no longer have an opportunity to earn any of the incentive. This additional time simply pushes back their disincentive clause. Approval of this change order will allow the city to compensate the contractor for the channel work that was indicated in the original plans; however the quantities were inadvertently left out of the bid documents. This will also authorize the additional work to reconstruct the intersection of Coppell Road and Southwestern Blvd. It's our opinion that the contractor has provided fair and reasonable pricing for these changes, and we recommend approval of this change order in the amount of $61,997.33 with an additional 78 calendar days. Staff will be available to answer any questions at the council meeting. CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Coppell Road South CONTRACTOR: JRJ Paving, L.P. OWNER: City of Coppell CHANGE ORDER NO.: Three (3) Item Description DATE: April 27, 2010 Quantity Unit Unit Price Total ADD: 1 Channel Excavation 7,129 CY $3.50 $24,951.50 2 Hydromulch 4222 SY $1.80 $7,599.60 3 Curlex w /Seed 6500 SY $1.35 $8,775.00 109 Concrete Removal 500 SY $10.05 $5,025.00 120 8" Lime Subgrade 500 SY $2.14 $1,070.00 Treatment 121 Lime 10.5 TON $147.45 $1,548.23 122 Reinforced Concrete 500 SY $33.15 $16,575.00 Pavement Total Additions: $65,544.33 DEDUCT: 4 Block Sod 750 SY $4.73 $3,547.50 Total Revision to Contract Amount $61,997.33 Previous contract amount $1,395,274.29 Net increase in contract amount $61,997.33 Revised contract amount $1,457,271.62 Net increase in contract time of completion 78 Revised Contract time of completion 288 Calendar Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. Recommended by City Engineer Date Agreed to by Contractor Date Accepted by City Date I 3 1� n COPPELL ROAD SOUTH CHANGE ORDER #3 CITY OF COPPELL PROJECT ST 07 - 02 0 1/2 1 COPPELL 1 INCH = 1 MILE craarad o, : r nnro zoo by scoa ranz 1/3 S: \CAD \In_Design \MISC EXH IB ITS\dwg\EXH I BITS 2010.dwg \ST07 -02 ADDITIONS Created in LDDT P 5. - Cs+3A ® ♦ * " COPPELL SERVICE CENTER F AYi g i � i � " ADDITIONAL GRASS QUANTITY NOT ` 'o INCLUDED IN ORIGINAL CONTRACT "M1•y —'+ x `i.. e, STORM DRAIN PIPE ' A COPPELL FIRE ADMINISTRATION AREA OF PROPOSED PAVEMENT REPLACEMENT to %m +. . COPPELL FIRE STATION #1 CARTER — CROWLEY TRACT Ott I 0 150 300 1 INCH = 300 FT. PLACEMENT OF ADDITIONAL GRASS AREA OF PROPOSED PAVEMENT REPLACEMENT COPPELL ROAD SOUTH CHANGE ORDER #3 CITY OF COPPELL PROJECT ST07-02 Created on: 20 APrll 20,0 b9 Sco[[La S:\CAD \In_ Design \MISC EXH IBITS\dwg \EXHIBITS.dwg \ST07 -02 ADDITIONS 2/3 Created in LDDT