MA FY 09/10-AG100525AGENDA REQUEST FORM T H E.` 1 T Y. a F DEPT: Engineering COPPELL �` DATE May 2 5, 2010 � ITEM #: 9B F1 WORK SESSION n CONSENT 1:1 REGULAR ITEM TYPE CONTRACT /BID or PROPOSAL ITEM CAPTION: Consider approval of awarding Bid #Q- 0510 -01 "Reinforced Concrete Pavement Repairs" to Laughley Bridge and Construction, Inc. in the amount of $359,290.00, and approval of a contingency amount of $40,710.00, for a total award of $400,000.00 as provided for in the IMF funds; and authorizing the City Manager to sign and execute a contract. GOAL(S): EXECUTIVE SUMMARY: Approval of this item will allow the city to repair various concrete street and alley failures throughout the city. Also, the approval will allow the removal and replacement of failed brick pavers at five intersections with stamped concrete. FINANCIAL COMMENTS: Funds for this contract are available in the Infrastructure Maintenance Fund. RECOMMENDED ACTION: ACTION TAKEN BY COUNCIL: Staff recommends award of the bid to Laughley Bridge and Construction. APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve M - Hunt S - Franklin Vote - 6 -0 Tunnel] absent + Libby Ball 5.26 12 04 120425 - 05'00' I #ReinforcedConcreteRep lAR MEMORANDUM TO: Mayor and City Council VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works FROM: Keith Marvin, P.E., Civil Engineer DATE: May 25, 2010 RE: Consider approval of awarding Bid #Q- 0510 -01 "Reinforced Concrete Pavement Repairs" to Laughley Bridge and Construction, Inc. in the amount of $359,290.00, and approval of a contingency amount of $40,710.00, for a total award of $400,000.00 as provided for in the IMF funds; and authorizing the City Manager to sign and execute a contract. On May 6, 2010 the City of Coppell received and opened 11 bids for the annual Reinforced Concrete Pavement Repair contract. The bids ranged from $359,290 to $748,997. The City allocated $400,000 in the IMF fund for this work. The Engineering Department administers the annual Reinforced Concrete Pavement Repair program with money budgeted in the Infrastructure Maintenance Fund. Awarding this contract will allow us to replace approximately 87 street failures, 74 alley failures and 72 curb failures of concrete paving throughout the city. This consists of residential, collector, and arterial streets, throughout the entire city. Under this years contract we have also included removal of brick pavers and replacement with colored stamped concrete. Many of the brick paver bands located around town are failing and are in need of replacement. This contract includes removal and replacement at 5 locations for a total of 760 square yards. The low bid of $359,290 was submitted by Laughley Bridge and Construction, Inc. based in Fort Worth. The Engineering Department has conducted a background check of this company including references, financials, and necessary personnel and equipment to complete the work. This company has worked for the City of Coppell on the same contract in the past. It's our opinion that they are qualified and capable of completing the work. We are also asking for approval of a contingency amount of $40,710. This amount would be used for additional concrete repair adjacent to the areas identified in the bid documents, or other areas that are identified during the progress of the work. The area of repair often exceeds the identified area, and we are forced to either ask for additional funds, or not make some of the repairs on the list. The contract was bid as a unit price contract, and the additional $40,710 will allow us to repair up to an additional 783 square yards of street. This additional amount could also be allocated to replace additional bands of brick pavers. Staff recommends the award of the "Reinforced Concrete Pavement Repairs" to Laughley Bridge and Construction, Inc. in the amount of $359,290.00, with an additional contingency amount of $40,710 for a total award of $400,000, as provided in the IMF. Staff will be available to answer any questions. BID #Q- 0510 -01 REINFORCED CONCRETE REPAIR Laughley Bridge & Const., Inc F & F Concrete, LLC V.A. Construction, Inc Texas Dirt Contractors 3D Paving DESCRIPTION QTY Unit Price Extended Unit Price Extended Unit Price Extended Unit Price Extended Unit Price Extended I- 1 Base Bid Remove and Replace Street Failures 2,485 $52.00 $129,220.00 $54.00 $134,190.00 $55.00 $136,675.00 $51.50 $127,977.50 $53.00 $131,705.00 I -2 Additional Thickness Remove and Replace Street Failures 1,300 $5.00 $6,500.00 $2.50 $3,250.00 $8.00 $10,400.00 $2.00 $2,600.00 $15.00 $19,500.00 I -3 Additional "high-early" Remove and Replace Street Failures 350 $75.00 $26,250.00 $55.00 $19,250.00 $45.00 $15,750.00 $56.00 $19,600.00 $65.00 $22,750.00 Total Type I Street Failures $161,970.00 $156,690.00 $162,825.00 $150,177.50 $173,955.00 11-1 Remove and Replace Alley Failures 2,595 $48.00 $124,560.00 $55.50 $144,022.50 $55.00 $142,725.00 $49.00 $127,155.00 $54.00 $140,130.00 III -1 Remove and Replace Curb and Gutter Failures 1,103 $20.00 $22,060.00 $18.00 $19,854.00 $20.00 $22,060.00 $16.00 $17,648.00 $20.00 $22,060.00 IV -1 Remove and Dispose of Brick Pavers Including Underlying Concrete Support 760 $12.00 $9,120.00 $9.00 $6,840.00 $10.00 $7,600.00 $28.00 $21,280.00 $13.50 $10,260.00 IV -2 Install Integral Colored Stamped Concrete pavement 650 $63.00 $40,950.00 $65.00 $42,250.00 $85.00 $55,250.00 $115.00 $74,750.00 $103.50 $67,275.00 IV -3 Brick Paver Replacement 10 $63.00 $630.00 $65.00 $650.00 $85.55 $855.50 $150.00 $1,500.00 $100.00 $1,000.00 Total Type IV Brick Paver Replacement $50,700.00 $49,740.00 $63,705.50 $97,530.00 $78,535.00 Total Bid for Type $161,970.00 $156,690.00 $162,825.00 $150,177.50 $173,955.00 Total Bid for Type II $124 $144,022.50 $142,725.00 $127,155.00 $140,130.00 Total Bid for Type 111 $22,060.00 $19,854.00 $22,060.00 $17,648.00 $22,060.00 Total Bid for Type IV $50,700.00 $49,740.00 $63,705.50 $97,530.001 $78,535.00 TOTAL BID ITEMS (Items I -IV) $359,290.00 $370,306.50 1 $391,315.50 $392,510.50 $414,680.00 im Bowman Construction Co., L.P TCN Construction strada Concrete Company, LL Lands Construction ED A. Wilson DESCRIPTION QTY Unit Price Extended Unit Price Extended Unit Price Extended Unit Price Extended Unit Price Extended I -1 Base Bid Remove and Replace Street Failures 2,485 $64.00 $159,040.00 $64.35 $159,909.75 $63.00 $156,555.00 $80.00 $198,800.00 $99.50 $247,257.50 L -2 Additional Thickness Remove and Replace Street Failures 1,300 $3.00 $3,900.00 $2.66 $3,458.00 $9.00 $11,700.00 $13.00 $16,900.00 $10.00 $13,000.00 I -3 Additional "high-ea l " Remove and Replace Street Failures 350 $36.00 $12,600.00 $22.84 $7,994.00 $72.00 $25,200.00 $60.00 $21,000.00 $17.50 $6,125.00 Total Type I Street Failures $175,540.00 $171,361.75 $193,455.00 $236,700.00 $266,382.50 11-1 Type II Remove and Replace Alley Failures 2,595 $62.00 $160,890.00 $64.20 $166,599.00 $63.00 $163,485.00 $80.00 $207,600.00 $109.50 $284,152.50 III -1 Type III 1 Remove and Replace Curb and Gutter Failures 1,103 $31.50 $34,744.50 $19.65 $21,673.95 $30.00 $33,090.00 $7.50 $8,272.50 $35.00 $38,605.00 BID #Q- 0510 -01 REINFORCED CONCRETE REPAIR IV -1 Remove and Dispose of Brick Pavers Including Underlying 760 $15.00 $11,400.00 $22.35 $16,986.00 $9.00 $6,840.00 $13.50 $10,260.00 $30.00 $22,800.00 IV -2 Install Integral Colored Stamped Concrete pavement 650 $99.00 $64,350.00 $113.40 $73,710.00 $160.00 $104,000.00 $105.50 $68,575.00 $155.00 $100,750.00 IV -3 Brick Paver Replacement 10 $60.00 $600.00 $500.00 $5,000.00 $300.00 $3,000.00 $120.00 $1,200.00 $100.00 $1,000.00 Total Type IV Brick Paver Replacement $76,350.00 $95,696.00 $113,840.00 $80,035.00 $124,550.00 Total Bid for Type $175,540.00 $171,361.75 $193,455.00 $236,700.00 $226,382.50 Total Bid for Type 11 $160,890.00 $166,599.00 $163,485.00 $207,600.00 $284,152.50 Total Bid for Type 111 $34,744.50 $21,673.95 $33,090.00 $8,272.50 $38,605.00 Total Bid for Type IV $76,350.00 $95,696.00 $113,840.00 $80,035.00 $124,550.00 TOTAL BID ITEMS (Items I -IV) $447,524.50 $455,330.70 $503,870.00 $532,607.50 $673,690.00 DESCRIPTION QTY Texas Standard Unit Price Construction Extended I -1 Base Bid Remove and Replace Street Failures 2,485 $99 $246,015.00 I -2 Additional Thickness Remove and Replace Street Failures 1,300 $5.00 $6,500.00 I -3 Additional "high-early" Remove and Replace Street Failures 350 $190.00 $66,500.00 Total Type I Street Failures $319,015.00 II -1 Remove and Replace Alley Failures 2,595 $79.00 $205,005.00 III -1 Remove and Replace Curb and Gutter Failures 1,103 $49.00 $54,047.00 IV -1 Remove and Dispose of Brick Pavers Including Underlying Concrete Support 760 $28.00 $21,280.00 IV -2 Install Integral Colored Stamped Concrete pavement 650 $229.00 $148,850.00 IV -3 Brick Paver Replacement 10 $80.00 $800.00 Total Type IV Brick Paver Replacement $170,930.00 Total Bid for Type I $319,015.00 Total Bid for Type II $205,005.00 Total Bid for Type 11I $54,047.00 Total Bid for Type IV $170,930.00 TOTAL BID ITEMS (Items I -IV) $748,997.00 2oo9 - 2c1❑ STREET, CuQe, ALLEV REPAIR CURB DATE ADDRESS LINEAR FT REaam Maa 4uw oQar�r A scaLE: t "= t,cc❑ Al -1 11/08/2007 Parkway (median) 6 Al -2 01/0212008 Quiet Valley 306 10 LE °EN° A7 -3 09/18/2008 MacArthur /Deforest 10 OFEf. — cirr iMiT A7 4 10/31/2008 Parkway 255 8 COPPELL — ° ° ° ^Tr n A7 -5 11/18/2008 Parr 638 -642 4 NT Al -6 11/21/2008 Laguna 950 16 Al -7 12103/2008 Laguna 954 14 Al -8 12111/2008 Cove 227 8 _ Al -9 03/16/2009 Marlee Cur 701 12 Al -10 05/31/2009 Village Parkway 1044 16 Al -11 06/05/2009 Rockcrest 351 10 Al -12 06/24/2009 Parkview P1340 12 DENTON COUNTY Al -13 07/27/2009 Spyglass Cove 898 6 DALLAS COUNTY Al -14 08/0212009 Wootlmoor 724 12 A1-15 08/1212009 Parkway 471 22 Al -16 1211212009 Prestwick Ct 623 8 ° Al -17 02115/2010 Parkway 255 200 Al -18 03/15/2010 Meadow Run Cir 135 4 A2 -1 02110/2006 Parkview PI 432 9 ' A2 -4 A2 -2 08/28/2006 Meatlowwootl 316 14 * A2- -3 = ""' A2 -3 06/06/2008 Waterford (median) 6 2 -3 1 -11 1 16 c " ALLEY DATE ADDRESS SQ YRDS Al - 11 „ g Al -1 07/14/2004 Lansdowne @ alley entrance to 108 223 A7 -2 10/08/2006 QuietValley 303 56 °,. A7 -3 11/03/2006 Parkwootl 426 8 1 -3 A74 06/07/2007 Alex 359 67 A7 -5 06/29/2007 Kailey W ay 6 Al -15 A7 -6 07/12/2007 Harwell 375 16 8 Al 8 " A2 - � „ °.- Al- o Al -7 09/17/2007 Meadow Run Cur 102 48 Al -8 01/02/2008 Phillips 600 429 -431 42 A7-9 01/04/2008 PI Pa 89 A7 -10 03/17/2008 Meadow Run Cur 211 34 a Al -11 04/28/2008 Deforest 660 22 a' A7 -12 05/29/2009 Raintree Cur 502 25 xA1 Al e o .s� .. A7 -13 05/29/2009 Sand Poin[ 108 63 Al -14 08/06/2009 Pecan Hollow 404 -408 16 Al -15 08/17/2009 Phillips 612 4 o Al -16 11/19/2009 Wootlmoor 720 23 A2 -1 �1 A2 -1 03/24/2003 Moore N. 344 45 v �I _ A2 -2 02/08/2005 Meatlowootl 304 6 c .� 2 w A2 -3 10/04/2005 Grace 573 21 m Al 1 A2 -4 02/15/2006 Creek Crossing 11 7 04 Al 2 ='_2 _ y 1 10 A2 -5 04/22/2006 Glen Lakes 659 -663 23 A2 xA1 6 A2 -6 08/31/2006 Raintree Cur 523 14 + A2 -7 02/27/2007 Tennyson PI 123 14 ,� °, 1'15 A2 -8 02/27/2007 Tennyson PI 142 18 Al 5 A2- A2 -9 04/01/2008 Dickens 137 14 Aill -i . A l xEM 15 K A 09/28/2004 Alentlale 730 60 "n scr ✓ Al. 3 ' STREET DATE ADDRESS SQ YRDS ^A2.7 Al -1 08/14/2006 Parkway /Parkview 20 Al -2 08/21/2007 Parkway 16 Al -9 Al -B ° Al -3 09/26/2007 SamuellMacArthur 6 A14 01/08/2008 Samuel/Sandy Lake 15 " xA -1 Ai- 0 Al -5 03/24/2008 Lodge 264 2 Ai -14 x 2-3 ° Al -6 05/07/2008 SamuellMeatlow Ridge 22 X A1 16 Al -7 08/05/2008 MacArthur /Village Pkwy 2 ° Al -14 AI -IO s Al -8 08/08/2008 Cove 351 2 29r0 p m A1-9 08/15/2008 MacArthur /Village Dr 9 °018 1 -7 Al -10 03/19/2009 MacArthur /Allen 8 A 8 A Al °�° AI-9 A2 -1 08/21/2003 Lodge 12 ` A2 -2 11/16/2006 Parkview PI 416 90 A2 -3 01/09/2007 Waterview 525 -529 110 A27 A1- A24 01/09/2007 Waterview 533 55 Al - A2 -5 04/23/2007 Lodge 317 11 A2 -6 04/23/2007 Parkway/Lodge 2 Al- 3 i-4 ° A2 -7 08/20/2007 Parkway 1000' west of MacArthur 1 2 m Bl -2 32-4 3- B2 -3 131-8 A2 -8 07/29/2008 Waterview 526 -530 2 A2 -9 10/29/2008 Sandy Lake/Lodge EB 1 A3 -1 03/08/2008 Samuel /Sandy Lake 5 o" ` B1 -_ - B1 -7 r 8117 l -3 inw o" B2 B1 -20 _ B25 a B113x 131�12 ° B1 -9 - B1 -1 6111 81 -19 Bi- 81 -7 l 1313 1 -13 B1 -18 - 62-5 oe 81 -1 B1 -19 �.3 B14 1.11 B B1 -18 B1 -14 B1 -14 B1 -5 -5 B1 -24 I B1 19 61. i2 L �. .1�mwe�wci, k B1 -10 n B2 -1 B1 -9 ALLEY DATE ADDRESS SQ YRDS B1 -1 08/23/2006 Highland Meadow 204 34 B1 -2 07/12/2007 Mockingbird 160 8 B1 -3 08/10/2007 Einn -le Ct. 909 35 B14 10/24/2007 Shatlowcrest 500 blk 134 B1 -5 11/13/2007 Willow Springs 229 7 B1 -6 10/23/2008 Hill 805 23 B1 -7 02/24/2009 Bethel School E. 830 7 B1 -8 04/14/2009 Reticetlar Way 939 17 B1 -9 04/29/2009 Penuel 237 23 B1 -10 05/04/2009 Sandy Knoll 469 45 B1 -11 06/01/2009 Hemlock 1010 -1016 103 B1 -12 06/25/2009 Foktail 200 9 B1 -13 06/25/2009 Timber Ridge 221 13 B1 -14 06/26/2009 Villawootl 644 34 B1 -15 07/10/2009 Brittany 226 7 B1 -16 08/14/2009 Mockingbird 224 5 B1 -17 08/21/2009 Simmons 236 156 B1 -18 09/18/2009 Havencrest 544 -548 14 B1 -19 10/30/2009 Cartlinal 724 -728 45 B1 -20 12/11/2009 Mockingbirtl bit Sparrow & Swallow 2 B1 -21 01/20/2010 Etlgewootl 311 8 81.22 01/20/2010 Lakewood 321 8 B1 -23 01/21/2010 Westwood Ct 336 (update) 134 B1 -24 01/21/2010 Wootlway456 11 B1 -25 03/16/2010 Reticetlar Way 833 -837 56 - 03/18/2002 Glendale 165 12 06/09/2005 Mallard 846 -902 4 0410512006 Willow Springs 433 58 0412412006 MacArthur N. 205 3 06/25/2007 Pheasant 618 3 B1 -6 03/31/2008 Wootlhurst 407 20 B7 -7 05/05/2008 Mapleleaf 114 8 61 -h 05/05/2008 Sugarberry 816 10 B ISM 06/09/2008 Etlgewootl 158 10 B11ti 06/18/2008 Falls 1420 12 B1 i1 05/29/2009 Pheasant 621 10 B1 -12 06/04/2009 Wootlhurst 323 12 B1 -13 06/10/2009 Simmons 149 12 B1 -14 06/1212009 Havencrest 544 22 B1 -15 09/09/2009 Hunters Ritlge Cir 433 14 B1 -16 09/29/2009 Sion ecres[1304 6 B1 -17 11/20/2009 Hill 229 4 B1 -18 11/30/2009 Quail 611 5 Bl-14 02116/2010 Wootlway 465 32 81 J/ry B1 -3 al' Bi -8 p w6 �. `S1 2s p n Bi 4 B1 -7 B1 -8 11/21/2008 Bethel E. West of Brick Pavers 40 B1 -9 03/11/2009 Falls 1420 45 B1 -10 03/25/2009 Bethel School 627 21 B1 -11 03/25/2009 Bethel School 719 23 B7 -12 04/12/2009 Mallard (Bit Pelican & Blue Jay) 31 B7 -13 04/15/2009 MacArthur/Starleaf 4 B7 -14 06/08/2009 Highland Meadow Cir /Santly Lake 53 B1 -15 10/02/2009 MacArthur 20 B1 -16 02115/2010 Bethel SchoollHeartz 5 B1 -17 03/01/2010 Villawootl 716 31 B1 -18 03/22/2010 MacArthur /Beltline 1 B2 -1 07/21/2003 Meatlowview /Moore 48 B2 -2 08/31/2005 Willet 28 B2 -3 04/24/2007 Moore Rd (Southbound) 3 B24 02107/2008 Denton Tap /Sandy Lake 2 B2 -5 03/11/2008 Barrington 1307 18 B2 -6 08/15/2008 Sandy Lake /Heartz 2 B3 -1 06/02/2004 Mockingbird 124 B3 -2 03/10/2008 MockingbirtllBel[line 1 2009 -2010 STREET, CI RI, ALLEY REaaiQ REPAIR Naa 4ua r e scarf: o F� — oar. �iNiT COPPELL — °oq qNT L MT zoos -zoi o srR EEr, cu Re, A�LEV REaAIR REPAIR rHaa 4uaoan r c a � �. s cALc: t = t .00❑ O reEr — Ciro �iMir COPPELi —cou Nry NE n, y C1 -„ C14 x B xC 65ir crCx q CURB DATE ADDRESS LINEAR FT C7 -1 06/09/2006 Forest Ridge 413 12 C1 -2 08109 12007 Forest Ridge 461 24 C1 -3 01/07 /2008 Manchester119 80 C14 01/16/2008 Airline 555 20 C7 -5 03/12/2008 Woodland Cv 114 14 C1 -6 03/19 /2008 Southern Belle 230 15 C1-7 03/24 /2008 Country Ln 503 16 C 13 04/25/2008 Dakota473 8 C 1.9 02109/2009 Cooper 401 8 CI-10 05/29/2009 River Rd 232 12 C2 -1 07/08/2005 Sandy Lake /Denton SW comer 3 C2 -2 07/14/2006 Branchwood 141 20 C3 -1 06113 Edinburgh 524 22 C3-2 C3 -1 06/14/2004 Carriage Ct. 200 90 C3 -2 04/28/2005 Wynnpage 131 34 CITY LIMIT STREET DATE ADDRESS SQ YRDS C7 -1 0210812005 Hartford 452 21 C1 -2 10/19/2006 Royal /Gateview 5 C1 -3 10/19/2006 BelOine(Wmgler 1 C14 06/19 /2007 Armstrong 722 -726 8 C1 -5 01/07/2008 Manchester 119 32 C1 -6 01/09/2008 Spanish Moss 343 89 C1 -7 03119/2008 Southern Belle 230 33 C1 -8 05107 /2008 AshleyfWhispering Hills 45 C7 -9 06125 12008 Airline 450 17 C1 -10 0712312008 Airline 505 33 C1 -24 10/06/2009 Wrangler /Executive 45 C1 -25 1010812009 Branchwood Tri 121 74 C7 -26 0110412010 Airline 550 18 C1 -27 01125/2010 Dividend 97 C1 -28 02104/2010 Plantation /Southern Belle 80 C7 -29 0311012010 Freeport (Bit Gateway & Southwestern 5 C7 -30 03110 12010 Freeport (B /t Wrangler& GatewayNB) 30 C2 -1 02/08/2005 Winding Hollow /Sandy Lake 48 C2 -2 02104/2008 Harris/Brooks 3 C2 -3 10/1612008 Wrangler DrLmgler Cir 3 C24 06/23/2009 Forest Bend/H.lewood Cove 1 C2 -5 0110412010 Airline 500 6 -1-21 1 ❑ sT —, I—, A —, -- (?E - Maa 4IAI D scare: i" = i ,00❑ E ENp O FEf. — c.,-. LirniT COFFE.i — co AO T M T DEN COUNTY DALLAS COUNTY DATE ADDRESS LINEAR FT 09/09/2007 Fallkirk /Kilbritlge comer 9 051011208 0 Canemount 619 4 05/29/2008 Bankers Cottage 715 6 D14 06/18/2008 Tumberry 205 4 D7 -5 07/22/2008 Buttonwood 407 16 Di 6 03/16/2009 Clifton Ct 607 12 STREET DATE ADDRESS SQ YRDS 131 -1 03/31/2004 Auburn 11 131 -2 03/24/2009 Auburn Way 9 131 -3 01/27/2010 Kilbritlge Ct 133 11 D2 -1 02/08/2005 Town Center E. /DeMOn Tap 13 D2 -2 01/31/2006 Coppers[one 402 26 D2 -3 01/27/2010 Kilbritlge 816 3 Z N Z a J � J � J a a F � ALLEY DATE ADDRESS SQ YRDS D1 -1 10/14/2008 Waverly 620 23 D1 -2 04/05/2009 Loxley 506 45 131 -3 10/08/2009 Natches Trace 149 167 D1 -4 01/12/2010 Martel 314 update 30 132 -1 05/28/2009 Bricknell 169 1