Loading...
TR0801-CS100520T H E C 1 T Y O F May 20, 2010 Morrie Gamini, Vice President Roadway Solutions 2524 N. IH 35E Carrollton, TX 75006 RE: Traffic Signal Installation Project # TR 08 -01 Sandy Lake Road @ Riverchase Drive Dear Mr. Gamini: This letter is to document a conversation between James and I in the field today. At approximately 1:30pm I asked James to shut down all work activity until we have a chance to meet to discuss the project. I have set up a meeting for Monday morning May 24 at 10:00am. Please bring James and any other field supervisors you may be using on the project. The purpose of this meeting is to discuss contract requirements for protection of underground utilities, and the importance of locates. As you know Roadway Solutions damaged a water line while working on the referenced project this morning. We will also discuss the City's expectation when city owned property is damaged. Pending the outcome of the meeting you should be able to resume work by noon on Monday. If you wish to discuss this between now and Monday, please feel free to call me. Sincerely, Keith Marvin, P.E. Project Engineer Office 972/304 -3679 Fax 972/304 -7041 E -mail kmarvin @coppelltx.gov cc: Glenn Hollowell, P.E., Assistant Director of Public Works Albert Samaniego, Construction Inspector 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673