Loading...
ST0701-LR100603Specified Strength: 4,000 psi @ 28 days Mix ID: DCSOHSO4 Supplier: Redi -Mix Batch Time: 1140 Plant: 136 Truck No.: 1363 Ticket No.: 25195333 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 41/4 3 -5 5.0 3 -6 80 85 147.2 Laboratory Test Data Set Specimen Diameter Area Date No. ID (in) (sq in) Received 1 1 6.00 28.27 05/06/10 1 2 6.00 28.27 05/06/10 1 3 6.00 28.27 05/06/10 1 4 6.00 28.27 05/06/10 Sample Date: 05105110 Sample Time: 1251 Sampled By: Koda W. Shadix Weather Conditions: Clear Accumulative Yards: 10 Batch Size (cy): 10 Placement Method: Direct Discharge Water Added Before (gal):40 Water Added After (gal): 0 Sample Location: Span 2 Placement Location: Bridge Span 2 and E approach Age at Maximum Compressive Date Test Load Strength Fracture Tested (days) (lbs) (psi) Type 05110110 5 95,230 3,370 5 05/12/10 7 113,230 4,010 4 06/02/10 28 159,580 5,640 4 06/02/10 28 159,110 5,630 4 Average (28 days) 5,640 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast Ao mpressive samples. Terracon Rep.: Koda W. Shadix Started: 1130 Reported To: Terry, Ashlar Finished: 1530 Contractor: Lacy Construction Report Distribution: Reviewed By: (1) City of Coppell TX (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc Er Cleve and, (1) Lacy Construction (1) PacTrust Pacific Realty Associates LP Senior Project ai Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOOt, 4- 28-10, ReVA Page 1 of I Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: DCSOHSO4 Supplier: Redi -Mix Batch Time: 0956 Plant: 136 Truck No.: 1191 Ticket No.: 25201571 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pef): Laboratory Test Data Result Specification 5 1/2 3 -5 5.0 3 -6 88 85 146.0 Set Specimen Diameter No. ID (in) 1 1 6.00 1 2 6.00 1 3 6.00 1 4 6.00 Area Date (sq in) Received 28.27 05/20/10 28.27 05/20/10 28.27 05/20/10 28.27 05/20/10 Sample Information Sample Date: 05/19/10 Sample Time: 1030 Sampled By: Jose A. Martinez Weather Conditions: Partly cloudy Accumulative Yards: 5 Batch Size (cy): 5 Placement Method: Crane /Bucket Water Added Before (gal):5 28 Water Added After (gal): 0 Sample Location: Guard Rail Placement Location: Bridge - westbound Lane Guard Rail, west side span Age at Date Test Tested (days) 05/26/10 7 06/02/10 14 06/16/10 28 06/16/10 28 Maximum Compressive Load Strength Fracture (lbs) (psi) Type 117,390 4,150 4 125,460 4,440 4 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Jose A. Martinez Started: 090( Reported To: Finished: 120( Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX (1) Lacy Construction Test Methods: (1) City of Coppell TX Reviewed By: (2) Halff Assoc Inc (1) PacTrust Pacific Realty Associates LP ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROODI, 4- 28-10, Rev.4 Page 1 of 1 Senior Project Manager CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091194.0099 Irerracon Service Date: 05/19/10 8901 Carpenter Frwy. Report Date: 06/03/10 Revision I Dallas, TX 75247 214 - 630 -1010 Reg No: F -3272 Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: 1701 Supplier: Lattimore Batch Time: 1327 Plant: 7 Truck No.: 5030 Ticket No.: 7217096 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 3 1/2 3 -5 4.0 3 -6 90 82 148.8 Laboratory Test Data Set Specimen Diameter Area No. ID (in) (sq in) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 6.00 28.27 1 4 6.00 28.27 Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before 05/19/10 Sample Time: 1410 Julio R. Perez Partly cloudy 3.5 Batch Size (cy): 3.5 Direct Discharge (gal):0 Water Added After (gal): 0 Sample Location: 45' S of Bullock Street on Southwestern Boulevard Placement Location: Inlet Top Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cas compressive strength samples. Terracon Rep.: Julio R. Perez Started: 1400 Reported To: Finished: 1600 Contractor: Lacy Construction Report Distribution: Reviewed By: (1) PacTrust Pacific Realty Associates LP (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc Eric J. Cleveland, P.E. (1) Lacy Construction Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOOt, 4- 28-10, Rev.a Page I of 1 Age at Maximum Compressive Date Date Test Load Strength Fracture Received Tested (days) (lbs) (psi) Type 05/20/10 05/26/10 7 113,000 4,000 4 05/20/10 06/02/10 14 121,380 4,290 4 05/20/10 06/16/10 28 05/20/10 06/16/10 28 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cas compressive strength samples. Terracon Rep.: Julio R. Perez Started: 1400 Reported To: Finished: 1600 Contractor: Lacy Construction Report Distribution: Reviewed By: (1) PacTrust Pacific Realty Associates LP (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc Eric J. Cleveland, P.E. (1) Lacy Construction Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOOt, 4- 28-10, Rev.a Page I of 1