Loading...
ST0701-LR100607CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091193.0168 re Service Date: 05/07/10 8901 Carpenter Frwy. Report Date: 06/07/10 Revision 3 Dallas, TX 75247 214- 630 -1010 Reg No:F -3272 Client Project City of Coppell TX Southwestern Boulevard Attn: Keith Marvin Coppell Road to Grapevine Creek PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94091193 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Sample Date: 05/07/10 Sample Time: 0915 Sampled By: Tirelc Driver Mix ID: Weather Conditions: Sunny, windy Supplier: Accumulative Yards: 10 Batch Size (cy): 10 Batch Time: Plant: Placement Method: Direct Discharge Truck No.: Ticket No.: Water Added Before (gal):0 Water Added After (gal): 0 Field Test Data Sample Location: Sta. 25 +00 Test Result Specification Placement Location: Southwestern Boulevard, West bound Slump (in): 2 1/2 1 -3 lane Air Content ( %): 4.5 3 -6 Concrete Temp. (F): 79 Ambient Temp. (F): 70 Plastic Unit Wt. (pcf): 149.2 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05/08/10 05110110 3 95,380 3,370 5 1 2 6.00 28.27 05/08/10 05/14/10 7 124,190 4,390 5 1 3 6.00 28.27 05/08/10 05/21/10 14 143,410 5,070 5 1 4 6.00 28.27 05/08/10 06/04/10 28 150,120 5,310 4 1 5 6.00 28.27 05/08/10 06/04/10 28 156,180 5,520 4 Average (28 days) 5,420 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Tirelc Driver Started: 1030 Reported To: Finished: 1430 Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Construction (1) PaeTrust Pacific Realty Associates LP Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 4- 28-10, RevA Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091193.0168 Irerracon Service Date: 05/07/10 8901 Carpenter Frwy. Report Date: 06/07/10 Revision 3 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 911MI l City of Coppell TX Attn: Keith Marvin PO Box 9478 Coppell, TX 75019 Project Southwestern Boulevard Coppell Road to Grapevine Creek Coppell, TX Project Number: 94091193 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: Supplier: Batch Time: Plant: Truck No.: Ticket No.: Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pef): Result Specification 3 1 -3 5.0 3 -6 77 70 148.0 Sample Date: 05/07/10 Sample Time: 1015 Sampled By: Tirelc Driver Weather Conditions: Cloudy, windy Accumulative Yards: 110 Batch Size (cy): 10 Placement Method: Direct Discharge Water Added Before (gal):0 Water Added After (gal): 0 Sample Location: Sta. 20 +84 Placement Location: Southwestern Boulevard, West bound lane Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 2 1 6.00 28.27 05/08/10 05110110 3 94,470 3,340 5 2 2 6.00 28.27 05/08/10 05/14/10 7 114,590 4,050 5 2 3 6.00 28.27 05/08/10 05/21/10 14 146,380 5,180 2 2 4 6.00 28.27 05/08/10 06/04/10 28 154,930 5,480 2 2 5 6.00 28.27 05/08/10 06/04/10 28 153,480 5,430 2 Average (28 days) 5,460 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Teri-aeon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests a samples. Terracon Rep.: Tirelc Driver Started: 1030 Reported To: Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX (1) Lacy Constniction Finished: 1430 (1) City of Coppell TX Reviewed By: (2) HalffAssoc Inc (1) PacTrust Pacific Realty Associates LP Eric J. Cleveland, P.E. Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOOI, 4.28 -10, Rev.4 Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091193.0176 Irerracon Service Date: 05/21/10 8901 Carpenter Frwy. Report Date: 06/07/10 Revision I Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client City of Coppell TX Attn: Keith Marvin PO Box 9478 Coppell, TX 75019 Project Southwestern Boulevard Coppell Road to Grapevine Creek Coppell, TX Project Number: 94091193 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: DCSOHSO4 Supplier: Redi -Mix Batch Time: 1522 Plant: 259 Truck No.: 1333 Ticket No.: 25203080 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 41/2 3 -5 4.8 3 -6 96 94 142.4 Laboratory Test Data Set Specimen Diameter Area Date No. ID (in) (sq in) Received 1 1 6.00 28.27 05/22/10 1 2 6.00 28.27 05/22/10 1 3 6.00 28.27 05/22/10 1 4 6.00 28.27 05/22/10 Sample Date: 05/21/10 Sample Time: 1620 Sampled By: Juan Lopez Weather Conditions: Sunny Accumulative Yards: 5 Batch Size (cy): 5 Placement Method: Bucket Water Added Before (gal):0 Water Added After (gal): 0 Sample Location: 100' from west end, bottom half Placement Location: Westbound Concrete Rail at Southwestern Boulevard Bridge - 91' to 136' from the W end Age at Date Test Tested (days) 05/28/10 7 06/04/10 14 06/18/10 28 06/18/10 28 Maximum Compressive Load Strength Fracture (lbs) (psi) Type 93,700 3,310 4 104,370 3,690 4 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required fie samples. Terracon Rep.: Juan Lopez Started: 140( Reported To: Finished: 170( Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX Reviewed By: (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Construction (1) PacTrust Pacific Realty Associates LP Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, a- za -lo, Rev.a Page 1 of I Senior Project Manager Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Sample Date: 05/07/10 Sample Time: 1145 Sampled By: Tirelc Driver Mix ID: Weather Conditions: Cloudy, windy Supplier: Accumulative Yards: 210 Batch Size (cy): 10 Batch Time: Plant: Placement Method: Direct Discharge Truck No.: Ticket No.: Water Added Before (gal):0 Water Added After (gal): 0 Meld Test Data Sample Location: V E of drivewway at 312 Southwestern Test Result Specification Boulevard Slump (in): 2 1/2 1 -3 Placement Location: Southwestern Boulevard. West bound Air Content ( %): 5.0 3 -6 lane Concrete Temp. (F): 78 Ambient Temp. (F): 80 Plastic Unit Wt. (pef): 151.6 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05/08/10 05110110 3 113,350 4,010 4 1 2 6.00 28.27 05/08/10 05/14/10 7 123,240 4,360 5 1 3 6.00 28.27 05/08/10 05/21/10 14 153,620 5,430 4 1 4 6.00 28.27 05/08/10 06/04/10 28 168,080 5,950 2 1 5 6.00 28.27 05/08/10 06/04/10 28 167,440 5,920 4 Average (28 days) 5,940 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Tirelc Driver Started: 0730 Reported To: Finished: 1030 Contractor: Lacy Construction Report Distribution: (1) PacTrust Pacific Realty Associates LP (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Construction Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 4- 28-10, Rev.4 Page 1 of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091194.0088 Irerracon Service Date: 05/07/10 8901 Carpenter Frwy. Report Date: 06/07/10 Revision 2 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: Supplier: Batch Time: Truck No.: Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Plant: Ticket No.: Result 3 5.0 76 82 150.6 Laboratory Test Data Sample Date: 05/07/10 Sample Time: 1300 Sampled By: Tirek Driver Weather Conditions: Clear Accumulative Yards: 310 Batch Size (cy): 10 Placement Method: Direct Discharge Water Added Before (gal):0 Water Added After (gal): 0 Sample Location: 5'W of W entrance of elementary Specification school 1 -3 Placement Location: Southwestern Boulevard - West bound 3 -6 lane Set Specimen Diameter Area Date Date No. ID (in) (sq in) Received Tested 2 1 6.00 28.27 05/08/10 05110110 2 2 6.00 28.27 05/08/10 05/14/10 2 3 6.00 28.27 05/08/10 05/21/10 2 4 6.00 28.27 05/08/10 06/04/10 2 5 6.00 28.27 05/08/10 06/04/10 Age at Maximum Test Load (days) (lbs) 3 107,350 7 134,650 14 146,310 28 153,490 28 156,890 Average (28 days) Compressive Strength Fracture (psi) Type 3,800 5 4,760 4 5,180 4 5,430 4 5,550 2 5,490 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Tirek Driver Started: 0730 Reported To: Finished: 1030 Contractor: Lacy Construction Report Distribution: (1) PacTrust Pacific Realty Associates LP (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Construction Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 4- 28-10, Rev.a Page 2 of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091194.0088 1 rerracon Service Date: 05/07/10 8901 Carpenter Frwy. Report Date: 06/07/10 Revision 2 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: Supplier: Batch Time: Plant: Truck No.: Ticket No.: Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 2 1/2 1 -3 4.5 3 -6 77 82 149.2 Sample Date: 05/07/10 Sample Time: 1415 Sampled By: Tirelc Driver Weather Conditions: Clear Accumulative Yards: 410 Batch Size (cy): 10 Placement Method: Direct Discharge Water Added Before (gal):0 Water Added After (gal): 0 Sample Location: 2' W of E entrance to elementary school Placement Location: Southwestern Boulevard - West bound lane Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 3 1 6.00 28.27 05/08/10 05110110 3 111,190 3,930 5 3 2 6.00 28.27 05/08/10 05/14/10 7 143,560 5,080 5 3 3 6.00 28.27 05/08/10 05/21/10 14 154,720 5,470 4 3 4 6.00 28.27 05/08/10 06/04/10 28 162,300 5,740 2 3 5 6.00 28.27 05/08/10 06/04/10 28 163,610 5,790 2 Average (28 days) 5,770 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required fie samples. Terracon Rep.: Tirelc Driver Started: 073( Reported To: Finished: 103( Contractor: Lacy Construction Report Distribution: Reviewed B (1) PacTrust Pacific Realty Associates LP (1) City ofCoppell TX y (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Constniction Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 4 -28-10, RevA Page 3 of 3 Senior Project Manager