Loading...
MA1001-CS100511Jim Bowman Construction Co., L.P. 1111 Summit Avenue, Suite 1 Plano, TX 75074 (972) 423 -1313 To: Mr. George Marshall, P.E. City of Coppell 255 E. Parkway Blvd. Coppell, Tx 75019 LETTER OF TRANSMITTAL Date: 05/11/10 Job No: 876 Regarding: Pre -Con Submittals Denton Tap & Sandy Lake Road WE ARE SENDING YOU: E] Attached ❑ Under separate cover via ❑ Shop Drawings ❑ Prints ❑ Plans ❑ Samples ❑ Copy of Letter ❑ Change Order ❑ the following items: ❑ Specifications COPIES DATE NO. DESCRIPTION 1 5/11/10 Emergency Contacts /Subcontractors 1 5/11/10 Proposed Schedule 3 5/11/10 Concrete Mix Designs 1 5/11/10 Contractor Qualifications I LE THESE ARE SUBMITTED (as checked below) E For approval El For your use EZ As requested ❑ For review and comments ❑ FOR BIDS DUE REMARKS ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints 2007 ❑ PRINTS RETURNED AFTER LOAN TO US Let me know if you need additional information ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections COPY TO Project File SIGNED ; ' JIM BOWMAN CONSTRUCTION COMPANY, INC. 2716 S. Rigsbee Dr. ■ Plano, Texas 75074 ■ (972) 423 -1313 May 11, 2010 Mr. George Marshall, P.E. City of Coppell 255 E. Parkway Blvd. Coppell, TX 75019 Re: JBCC Project #876 — Denton Tap & Sandy Lake Road We offer the following list of personnel for emergency contact purposes: Name Title Cell Phone Home Adrian Bowman Assistant GM (214) 535 -6588 (972) 208 -6018 Vicente Murillo Paving Superintendent (214) 535 -2804 (972) 487 -9362 Lee Halencak Director of Operations (972) 339 -8511 (214) 693 -8250 Jim Bowman General Manager (214) 926 -7398 (972) 509 -1599 Subcontractors Metroplex Pavement Markings North Texas Bomanite Please call if you have any questions. Sincerely, Lee M. Halencak, P.E. Director of Operations s a ` Ci tr_Rr1F1on (3 it.( ems -- Sitlito / 60 r'( / - 4 F'7z fc“( _S.S____‘_z 0 _r c / . c)7 .F,)4 7‘ M,v 1,t4 6467.6 Z if 97 /Z3 - 1513 ,t ;r L A, liulenc:4K 1 0 ot, -- 8 r ow er N. i c.Xks 3oma a ►-} e 17 2. - 9 N- 7 4 63 II) EEL) Dfit/j__ CO PPLZ . V/2-36?-368 (- /6 , /16:-.,-)' c', i( 1 2 zA- G e‘r2,,./q ` - z 3, 7 1 i Denton Tap & Sandy Lake Brick Paver Replacement Construction Schedule JBCC Project No. 876 Jim Bowman Construction Company, LP Tue 5/11/10 ID Task Name Duration Start Finish Predecessors Jun 6 10 Jun 13 10 Jun 20 '10 Jun 27 10 Ju 4'10 1 Denton Tap & Sandy Lake Brick Paver Replacement 30 days Mon 6/7/10 Tue 7/6/10 S M,T Wi TF SS:MiT YV TF S'S IMT W;TF ?S,SiM -T W!TiF!S,S MT W. 2 Phase I 14 days Mon 6 /7/10 Sun 6/20/10 3 Barricades / Detour Setup 1 day Mon 6/7/10 Mon 6/7/10 4 Sawing 0.5 days Tue 6/8/10 Tue 6/8/10 3 5 Pavement / Paver Removals 1.5 days Tue 6/8/10 Wed 6/9/10 4 6 12" RC Pavement 5 days Thu 6/10/10 Mon 6/14/10 5 7 12" Stamped RC Pavement 5 days Tue 6/15/10 Sat 6/19/10 6 8 BFRs & Sidewalks 1 day Sun 6/20/10 Sun 6/20/10 7 9 Phase II 13 days Mon 6121/10 Sat 7/3/10 2 10 Barricades / Traffic Switch 1 day Mon 6/21/10 Mon 6/21/10 11 Sawing 0.5 days Tue 6/22/10 Tue 6/22/10 10 12 Pavement / Paver Removals 1.5 days Tue 6/22/10 Wed 6/23/10 11 13 12" RC Pavement 5 days Thu 6/24/10 Mon 6/28/10 12 14 12" Stamped RC Pavement 5 days Tue 6/29/10 Sat 7/3/10 13 15 r Pavement Markings 2 days Sun 7/4/10 Mon 7/5/10 9 16 Clean -up / Punchlist I 1 day Tue 7/6/10 Tue 7/6/10 15