Shake & Shingle 2-LR100118
REPORT OF WATER INJECTION OBSERVATION
Ingle Office Buildings 3 & 4
Northlake Drive and E. Belt Line Road
Coppell, Texas
REPORTED TO:REPORT NO.
Ratcliff Constructors 3
4200 Beltway Drive REPORT DATE:
16566
Addison, Texas 75001
REG PROJECT NO.
01-18-10
ATTN: Mr. Max Young
TECHNICIAN:
D. Balderas
PAGE:
1 of 1
CONTRACTOR:
Ratcliff Constructors
On this date a representative of Reed Engineering Group, Ltd. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth Injection Spacing Injection Pressure Injection Intervals
(ft)(ft)(psi)(in)
15 5 100-200 12-18
Equipment
Number ofNumber of Probes Length of Probes Probe Spacing
Rigs(ea)(ft)(ft)
2 4 18 5
Date Area Injected (sq ft) Average Pressure (psi) Pass No.
01-11-10 10,800 180 1
Surfactant added at regular intervals:
Yes
Submitted by:
E-Mail
Distribution:
(1) Ratcliff Constructors/Mr. Max Young
REED ENGINEERING GROUP, LTD.
(1) City of Coppel/Mr. Larry Davis
Registration Number F-3114
(1) City of Coppell/Mr. Mike Arellano
(1) Ratcliff Constructors/Mr. Derek Free
Mail
Distribution:
(1) Pross Design Group/Mr. Mark Pross
Bill Woolwine
Sr. Manager, CMT
BW/cn
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019
TELFAX