Loading...
Shake & Shingle 2-LR100217 REPORT OF WATER INJECTION OBSERVATION Ingle Office Buildings 3 & 4 Northlake Drive and E. Belt Line Road Coppell, Texas REPORTED TO:REPORT NO. Ratcliff Constructors 10 4200 Beltway Drive REPORT DATE: 16566 Addison, Texas 75001 REG PROJECT NO. 16566 ATTN: Mr. Max Young TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 CONTRACTOR: Ratcliff Constructors On these dates a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (ft)(ft)(psi)(in) 15 5 100-200 12-18 Equipment Number ofNumber of Probes Length of Probes Probe Spacing Rigs(ea)(ft)(ft) 2 4 16.5 5 Date Area Injected (sq ft) Average Pressure (psi) Pass No. 01-25-10 9,600 110 4 01-26-10 4,800 115 4 Surfactant added at regular intervals: Yes Submitted by: E-Mail Distribution: (1) Ratcliff Constructors/Mr. Max Young REED ENGINEERING GROUP, LTD. (1) City of Coppel/Mr. Larry Davis Registration Number F-3114 (1) City of Coppell/Mr. Mike Arellano (1) Ratcliff Constructors/Mr. Derek Free Mail Distribution: (1) Pross Design Group/Mr. Mark Pross Bill Woolwine Sr. Manager, CMT BW/cn 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX