Loading...
MA1001-CS100609Denton Tap & Sandy Lake Brick Paver Replacement JBCC Project No 876 Construction Schedule Wed 6/9/10 Jim Bowman Construction Company, LP ID Task Name Duration Start Finish Jun — - -._ S S M 1 ;Denton Tap & Sandy Lake Brick Paver Replacement 28 days Mon 6/7/10 Sun 7/4/10 C 2 Phase I - Inside Lanes 13 days Mon 6/7/10 Sat 6/19/10 3 Barricades / Detour Setup 1 day Mon 6/7/10 Mon 6/7/10 4 Sawing 0.5 days Tue 6/8/10 Tue 6/8/10 5 Pavement / Paver Removals 1.5 days Tue 6/8/10 Wed 6/9/10 6 12" RC Pavement 5 days Thu 6/10/10 Mon 6/14/10 7 12" Stamped RC Pavement 5 days Tue 6/15/10 Sat 6/19/10 8 Phase 11 - Outside Lanes 13 days Sun 6/20/10 Fri 7/2/10 9 Barricades / Traffic Switch 1 day Sun 6/20/10 Sun 6/20/10. _ 10 Sawing 0.5 days Mon 6/21/10 Mon 6/21/10; 11 Pavement / Paver Removals 1.5 days Mon 6/21/10 Tue 6/22/101 12 12" RC Pavement 5 days Wed 6/23/10 Sun 6/27/10, 13 12" Stamped RC Pavement 5 days Mon 6/28/10 Fri 7/2/10. 14 BFRs & Sidewalks 3 days Mon 6/28/10 Wed 6/30/10', 15 Pavement Markings 1 day Sat 7/3/10 Sat 7/3/10'; 16 Clean -up / Punchlist 1 day Sun 7/4/10 Sun 7/4/101 Jun 13, '10 Jun 20, '10 Jun 27, '10 Jul 4 SIM1T iT,F,S,S M T W T;F,S.S M T W T F S S M