Loading...
Shake & Shingle 2-LR100607 REPORT OF STRUCTURAL STEEL OBSERVATION Ingle Office Buildings 3 & 4 Northlake Drive and E. Belt Line Road Coppell, Texas REPORTED TO:REPORT NO. Ratcliff Constructors 41 4200 Beltway Drive REPORT DATE: 06-07-10 Addison, Texas 75001 REG PROJECT NO. 16566 ATTN: Mr. Charley Conway DATE OBSERVED: 06-03-10 TECHNICIAN: J. Gray PAGE: 1 of 1 CONTRACTOR: Ratcliff Constructors Location: Building 3 at Lines A-D/1-6 NonCode Details Observed CompliantCompliant AWS D1.1 AISC Other I) Anchor bolt tension verification of X X steel columns II) Random visual weld verification as follows: a) steel joist to wall connections X X b) steel joist to girder connections X X c) girder to steel column connections X X d) girder to steel column connections X X III) Visual weld verification of welded X X steel roof deck IV) Visual verification of Tek screw X X installation at roof deck side laps Discrepancies/Comments: Other = Structural Drawings E-MailSubmitted by: Distribution: (1) Ratcliff Constructors/ REED ENGINEERING GROUP, LTD. Mr. Charley Conway Registration Number F-3114 (1) City of Coppel/Mr. Larry Davis (1) City of Coppell/Mr. Mike Arellano (1) Ratcliff Constructors/Mr. Derek Free (1) McHale Engineering/ Mr. Gary McHale James D. Gray Mail C.W.I. 07081171 Distribution: (1) Pross Design Group/Mr. Mark Pross JG/cdl 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX