MA1001-CS100602 (3)MUNICIPALITY PROJECT RESPONSE LETTER 6/2/2010 Municipality: City of Coppell Log #10060200 Project Name:Utility Check: Denton Tap & Sandy Lake Brick Paver Repl. Project Number: Project Manager: George Marshall Work Order Date: Mapsco:1A -S Wire Center:Verizon /Coppell SBC Engineer:James Mckee- 214 - 745 -2976 ,john Yfoffingsworth Manager- Engineering Design Utility Coordination 3 AT &T Plaza, Room 2124 Dallas, Tx 75202 214464 -4095 SBC ENGINEER: PLEASE COMPLETE FORM AND RETURN WITHIN 7 DAYS Regardless of the selections made below, it is the Municipality's responsibility to call one call, 1- 800 - 344 -8377 to have all utilities located. ❑ We are returning your prints with the approximate location of SBC facilities marked in red. ❑ We have no facilities within the limits of construction. e have ❑ aerial ❑ buried conduit facilities that appear to be clear. f 9 f777 ❑ We have ❑ aerial ❑ buried ❑ conduit facilities in conflict. (Please contact our engineer to coordinate any necessary relocation) ❑ Utility Adjustments and/ or relocations appear to be required for this project, but payment for the adjustments and /or relocations must first be received. SBC will begin the required work for the adjustments and /or relocations upon receipt of payment of the anticipated costs or the execution of an agreement regarding payment. Please call 1- 800 - 662 -8922 to initiate this process. Based upon the most recent prints we received from you on , the estimated time requirement for clearing our adjustments and /or relocations out of the area of proposed work is as follows: ❑ _ workdays after ❑ all required ROW is cleared ❑ Final plans are received. ❑ _ work days after Power Company facilities are clear. ❑ _ work days after CATV facilities are clear. ❑ _work days after other facilities ❑ Other conditions: are clear. The estimated time requirements set forth herein are provided as a courtesy only and constitute Southwestern Bell Telephone Company's estimate, as of this date, of the time which may be required to perform the proposed work. Additional time may be needed as the result of unforeseeable and unanticipated factors or events. Southwestern Bell Telephone Company provides this estimate to you with the understanding, and on the condition that you understand, that it is not a commitment to perform the work within these time estimates or to perform the work at all. T H E C 1 T Y O F COFFELL �o0�6c3� �= 11, �` May 28, 2010 RE: Denton Tap & Sandy Lake Brick Paver Replacement To Whom It May Concern: The reconstruction of Denton Tap & Sandy Lake intersection will begin on June 71h, 2010. The project consists of replacing the brick pavers within the Denton Tap & Sandy Lake Intersection as well as the 8" of concrete below with 12" of concrete. There are no anticipated grade changes to the intersection. If you would like to review the plans or have any questions concerning this project, feel free to contact me. Sincerely, George Marshall, P.E. Civil Engineer Office Phone: 972 - 304 -3562 Fax: 972 - 304 -3570 0 2 2010 CITY: MAPS WIRE ENGNEFR: / A FAMILY COMMUNITY FOR A LIFETIME L 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV m C? 8 m f f0 ui k 3 a 7n gg 20 a€ Y 0 5 , . °0 � 7� gee; m Vo 77T .4 m � 5 � So O O Z � bd'1iN91S Q • end 91S" � � ViR 1 • 4 g � L •� 6. Fbs .,• ��• �g � .. fi o ' , .• g'p NTON TAP DE ON TAP s •! ° • ` Lo • : • Wei E��ao. v.��W�$ g., ���a e; � . r:. b .� �� z gil gig ii8 a<1_g >�9� _G B EQ g X5 '_3 %�% % %�C i S � nx MUM j oho � R111. E " %f6 s ea 1