MA1001-CS100602 (3)MUNICIPALITY PROJECT RESPONSE LETTER 6/2/2010
Municipality: City of Coppell Log #10060200
Project Name:Utility Check: Denton Tap & Sandy Lake Brick Paver Repl.
Project Number:
Project Manager: George Marshall
Work Order Date:
Mapsco:1A -S
Wire Center:Verizon /Coppell
SBC Engineer:James Mckee- 214 - 745 -2976
,john Yfoffingsworth
Manager- Engineering
Design
Utility Coordination
3 AT &T Plaza, Room 2124
Dallas, Tx 75202
214464 -4095
SBC ENGINEER: PLEASE COMPLETE FORM AND RETURN WITHIN 7 DAYS
Regardless of the selections made below, it is the Municipality's responsibility to call one
call, 1- 800 - 344 -8377 to have all utilities located.
❑ We are returning your prints with the approximate location of SBC facilities marked in red.
❑ We have no facilities within the limits of construction.
e have ❑ aerial ❑ buried conduit facilities that appear to be clear. f 9 f777
❑ We have ❑ aerial ❑ buried ❑ conduit facilities in conflict.
(Please contact our engineer to coordinate any necessary relocation)
❑ Utility Adjustments and/ or relocations appear to be required for this project, but payment for the
adjustments and /or relocations must first be received. SBC will begin the required work for the
adjustments and /or relocations upon receipt of payment of the anticipated costs or the execution of
an agreement regarding payment. Please call 1- 800 - 662 -8922 to initiate this process.
Based upon the most recent prints we received from you on , the estimated time requirement for
clearing our adjustments and /or relocations out of the area of proposed work is as follows:
❑ _ workdays after ❑ all required ROW is cleared ❑ Final plans are received.
❑ _ work days after Power Company facilities are clear.
❑ _ work days after CATV facilities are clear.
❑ _work days after other facilities
❑ Other conditions:
are clear.
The estimated time requirements set forth herein are provided as a courtesy only and constitute
Southwestern Bell Telephone Company's estimate, as of this date, of the time which may be required to
perform the proposed work. Additional time may be needed as the result of unforeseeable and
unanticipated factors or events. Southwestern Bell Telephone Company provides this estimate to you
with the understanding, and on the condition that you understand, that it is not a commitment to
perform the work within these time estimates or to perform the work at all.
T H E C 1 T Y O F
COFFELL �o0�6c3� �= 11,
�`
May 28, 2010
RE: Denton Tap & Sandy Lake Brick Paver Replacement
To Whom It May Concern:
The reconstruction of Denton Tap & Sandy Lake intersection will begin on June 71h,
2010.
The project consists of replacing the brick pavers within the Denton Tap & Sandy Lake
Intersection as well as the 8" of concrete below with 12" of concrete. There are no
anticipated grade changes to the intersection.
If you would like to review the plans or have any questions concerning this project, feel
free to contact me.
Sincerely,
George Marshall, P.E.
Civil Engineer
Office Phone: 972 - 304 -3562
Fax: 972 - 304 -3570
0 2 2010
CITY:
MAPS
WIRE
ENGNEFR: /
A FAMILY COMMUNITY FOR A LIFETIME
L
255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV
m
C?
8 m f f0
ui
k 3 a 7n gg
20 a€ Y
0 5 , . °0
� 7� gee; m Vo
77T .4
m �
5 � So O O
Z
� bd'1iN91S Q • end 91S" � �
ViR 1
• 4 g � L •�
6. Fbs .,•
��• �g � .. fi o
' , .• g'p NTON TAP
DE ON TAP s •! ° • `
Lo
• : • Wei E��ao. v.��W�$ g., ���a e; � . r:. b .� �� z
gil
gig
ii8 a<1_g >�9� _G B EQ
g
X5 '_3 %�% % %�C
i S � nx
MUM
j oho
� R111. E " %f6
s ea 1