ST0301A-CR100615T H E C 1 T Y O F
COPPELL
T p
f 9
PROJECT: W. BETHEL ROAD
(Denton Tap to Penfolds Ln)
PROJECT NO. ST 03 -01 Phase H -A
OWNER: CITY of COPPELL
CONTRACTOR: JRJ PAVING, LP
WEATHER
TEMP
WIND
HUMIDITY
SUN
CLE
OVERCAST
RAIN
SNOW
To 32
32 -50
50-70
70 -85
85 up
Still
M
High
Report No
Dry
Mod
Humi
DAY M T T F S S
c
AVERAGE FIELD FORCE
NAME OF CONTRACTOR
NON-
MANUAL
MANUAL
REMARKS
VISITORS
TIME
REPRESENTATIVE
nQa
REPRESENTING
5' S
REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION CTWITIES:
SIGNA
INVW G PT. INSPECTOR
N