Loading...
Duke Lesley 3A-CS100618MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Memo to File From: Larry Davis, Construction Inspector Date: June 18, 2010 RE: Samsung Parking Lot Duke Lesley Addition, Lot 3 Block A As of this date, the paving has been completed to our specifications. This being a private project and having no work in the City's right -of -way or easement(s), no maintenance bonds or record drawings (as- builts) were required. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"