Duke Lesley 3A-CS100618MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Memo to File
From: Larry Davis, Construction Inspector
Date: June 18, 2010
RE: Samsung Parking Lot
Duke Lesley Addition, Lot 3 Block A
As of this date, the paving has been completed to our specifications. This being a
private project and having no work in the City's right -of -way or easement(s), no
maintenance bonds or record drawings (as- builts) were required.
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"