Loading...
ST0701-LR100617CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091 193.0173 1 5� r rac on Service Date: 05/19/10 8901 Carpenter Frwy. Report Date: 06/17/10 Revision 2 - 28 -day results Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client City of Coppell TX Attn: Keith Marvin PO Box 9478 Coppell, TX 75019 Project Southwestern Boulevard Coppell Road to Grapevine Creels Coppell, TX Project Number: 94091193 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: DCSOHSO4 Supplier: Redi -Mix Batch Time: 0956 Plant: 136 Truck No.: 1 191 Ticket No.: 25201571 Field Test Data Test Slump (in): Air Content ( Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pef): Result Specification 5 1/2 3 -5 5.0 3 -6 88 85 146.0 Laboratory Test Data Set Specimen No. ID Diameter Area (in) (sq in) 6.00 28 77 6.00 28.27 6.00 28.27 6.00 28.27 Sample Information Sample Date: 05/19/10 Sample Time: 1030 Sampled By: Jose A. Martinez Weather Conditions: Partly cloudy Accumulative Yards: 5 Batch Size (cy): 5 Placement Method: Crane /Bucket Water Added Before (gal):5 Water Added After (gal): 0 Sample Location: Guard Rail Placement Location: Bridge - westbound Lane Guard Rail, west side span Compressive Age at Maximum Date Date Test Load Received Tested (days) (lbs) 05/20/10 05/26/10 7 117,390 05/20/10 06/02/10 14 125,460 05/20/10 06/16/10 28 135,420 05/20/10 06/16/10 28 137,860 Average (28 days) Compressive Strength Fracture (psi) Type 4,150 4 4,440 4 4,790 2 4,880 2 4,840 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Jose A. Martinez Started: 0900 Reported To: Finished: 1200 Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX Reviewed By: (1) City of Coppell TX (2) I-1alITAssoc Inc Eric J. Cleveland, P.E. (1) Lacy Constniction (1) PacTrust Pacific Realty Associates LP Senior Project Manager Test Methods: ASTM C 31, ASTM 09, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 4- 28- Rev.4 Page 1 of I CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091193.0174 Irerracan Service Date: 05/20/10 8901 Carpenter Frwy. Report Date: 06/17/10 Revision 2 - 28 -day results Dallas, TX 75247 214- 630 -1010 Reg No:F -3272 Client Project City of Coppell TX Attn: Keith Marvin PO Box 9478 Coppell, TX 75019 Southwestern Boulevard Coppell Road to Grapevine Creek Coppell, TX ect Number: 94091193 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: DCSOHSO4 Supplier: Redi -Mix Batch Time: 1233 Plant: 259 Truck No.: 1383 Ticket No.: 25202205 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 41/2 3 -5 4.1 3 -6 93 85 144.5 Sample Information Sample Date: 05/20/10 Sample Time: 1318 Sampled By: Juan Lopez Weather Conditions: Cloudy Accumulative Yards: 5 Batch Size (cy): 5 Placement Method: Bucket Water Added Before (gal): 10 Water Added After (gal): 0 Sample Location: 53' from W end, bottom half Placement Location: Westbound Concrete Rail at Strength Southwestern Bridge, 45'- 91' from W No. end Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05/21/10 05/27/10 7 105,010 3,710 2 1 2 6.00 28.27 05/21/10 06/03/10 14 122,960 4,350 2 1 3 6.00 28.27 05/21/10 06/17/10 28 128,620 4,550 2 1 4 6.00 28.27 05/21/10 06/17/10 28 131,600 4,650 2 Average (28 days) 4,600 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required fie. samples. Terracon Rep.: Juan Lopez Started: 110( Reported To: Finished: 133( Contractor: Lacy Construction Report Distribution: (l) City of Coppell TX (1) City of Coppell TX Reviewed By: (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Construction (1) PacTrust Pacific Realty Associates LP Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 4- 28-10, RevA Page 1 of 1 Senior Project Manager CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 94091194.0099 Service Date: 05/19/10 8901 Carpenter Frwy. Report Date: 06/17/10 Revision 2 - 28 -day results Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client Project PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: 1701 Supplier: Lattimore Batch Time: 1327 Plant: 7 Truck No.: 5030 Ticket No.: 7217096 Field Test Data Test Slump (in): Air Content ( Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (peo: Result Specification 3 1/2 3 -5 4.0 3 -6 90 82 148.8 Sample Date: 05/19/10 Sample Time: 1410 Sampled By: Julio R. Perez Weather Conditions: Partly cloudy Accumulative Yards: 3.5 Batch Size (cy): 3.5 Placement Method: Direct Discharge Water Added Before (gal):0 Area Water Added After (gal): 0 Sample Location: 45' S of Bullock Street on Southwestern Strength Boulevard Placement Location: Inlet Top Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) _ Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05/20/10 05/26/10 7 113,000 4,000 4 1 2 6.00 28.27 05/20/10 06/02/10 14 121,380 4,290 4 1 3 6.00 28.27 05/20/10 06/16/10 28 146,100 5,170 2 1 4 6.00 28.27 05/20/10 06/16/10 28 144,790 5,120 2 Average (28 days) 5,150 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive s - en samples. Terracon Rep.: Julio R. Perez Started: 1400 Reported To: Finished: 1600 Contractor: Lacy Construction Report Distribution: (1) PacTrist Pacific Realty Associates LP (1) City ofCoppell TX Reviewed By: (1) City ofCoppell TX (2) Hall7'Assoc Inc Eric J. Cl veland, P.E. (1) Lacy Constriction Senior Pr 'eet Manager Test Methods: ASTM C 31, ASTM 09, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CRaoot, 4.28 -10, Rev.4 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091194.0101 Irerracon Service Date: 05/20/10 8901 Carpenter Frwy. Report Date: 06/17/10 Revision 2 - 28 -day results Dallas, TX 75247 214 - 630 -1010 Reg No: F -3272 Client Project PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX ect Number: 94091194 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: 1701 Supplier: Lattimore Batch Time: 1250 Truck No.: 7060 Plant: 07 Ticket No.: 7217116 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf) Result Specification 4 3 -5 4.5 3 -6 96 84 145.2 Sample Information Sample Date: 05/20/10 Sample Time: 1338 Sampled By: Juan Lopez Weather Conditions: Cloudy Accumulative Yards: 6.5 Batch Size (cy): 6.5 Placement Method: Direct Discharge Water Added Before (gal):5 Water Added After (gal): 0 Sample Location: Sta. 11 +00 Placement Location: Inlet Approach on Southwestern Fracture Boulevard at Sta. 4 +43 and Sta. 11 +00 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05/21/10 05/27/10 7 100,470 3,550 4 1 2 6.00 28.27 05/21/10 06/03/10 14 119,630 4,230 4 1 3 6.00 28.27 05/21/10 06/17/10 28 134,010 4,740 2 1 4 6.00 28.27 05/21/10 06/17/10 28 132,290 4,680 4 Average (28 days) 4,710 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Juan Lopez Started: 133( Reported To: Contractor: Lacy Construction Report Distribution: (1) PacTrust Pacific Realty Associates LP (1) City of Coppell TX (1) City of Coppell TX (2) Halff Assoc Inc (1) Lacy Construction Finished: 150( Reviewed By: Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 4- 28 -10, Rev.4 Page 1 of 1 Senior Project Manager